UFGS 23 81 29 Variable Refrigerant Flow HVAC Systems |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 46 07 53 Packaged Wastewater Treatment Equipment |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 09 97 02 Painting: Hydraulic Structures |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 46 43 21 Circular Clarifier Equipment |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 46 23 00 Grit Removal and Handling Equipment |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 32 23.13 Segmental Concrete Block Retaining Wall |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 33 01 50.31 Leak Detection For Fueling Systems |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 75 15 Custom-Packaged, Aircraft Pre-Conditioned Air Units |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 11 33.13 Portland Cement-Stabilized Base Courses |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 13 17 43 Hydrotherapy Equipment |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 40 60 00 Process Control |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 11 26 Hot-Mix Bituminous Base Course for Roads and Streets |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 26 51 00 Interior Lighting |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 22 00 70 Plumbing for Healthcare Facilities |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 01 17.62 Paving Fabric Interlayer |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 11 20 Facility Gas Piping |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 44 13 51 Thermal Oxidation Equipment |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 27 51 16 Public Address Systems |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 30 00 HVAC Air Distribution |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 27 05 13.43 Television Distribution System |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 11 74 00 Dental Equipment |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 35 16.17 10 Mechanical Engine [and Welding Fume] Exhaust Systems |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 52 30.00 10 Heat Recovery Boilers |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 52 30.01 10 Central Coal-Fired Steam-Generating System |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 52 30.02 10 Central Steam Generating System - Combination Gas and Oil Fired |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 58 00.00 10 Central Steam Heating and Utilities Systems |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 80 20.00 10 Gas-Fired Heating Equipment |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 26 32 15.00 Engine-Generator Set Stationary 15-2500 kW, with Auxiliaries |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 11 70 00 General Requirements for Medical and Dental Equipment |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 26 36 23 Automatic Transfer Switches and By-Pass/Isolation Switch |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 11 72 13 Medical Equipment, Miscellaneous |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 41 22 23.19 Monorail Hoists |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 13 43 Pervious Concrete Paving |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 27 53 19.13 First Responder Distributed Antennae Systems (DAS) |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 11 71 00 Sterilizers and Associated Equipment |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 11 82 19 Packaged Incinerators |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 33 46 13 Foundation Drainage |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 11 13.16 Bituminous-Stabilized Subgrade |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 11 26.19 Bituminous-Stabilized Base and Subbase Courses |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 33 56 53 Compressed Gases Storage Tanks |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 33 23 Overhead Coiling Doors |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 10 22 39 Folding Panel Partitions |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 35 20 23 Dredging |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 36 13 Sectional Overhead Doors |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 10 26 00 Wall and Door Protection |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 35 42 34 Reinforced Soil Slope |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 36 19 Vertical Lift Doors |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 10 28 13 Toilet Accessories |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 13 34 19 Metal Building Systems |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 51 23 Steel Windows |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 12 24 13 Roller Window Shades |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 51 69.10 Aluminum Storm Windows |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 12 61 13 Upholstered Audience Seating |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 52 00 Wood Windows |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 09 51 00 Acoustical Ceilings |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 28 31 76 Interior Fire Alarm and Mass Notification System, Addressable |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 21 13 13 Wet Pipe Sprinkler Systems, Fire Protection |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 53 00 Plastic Windows |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 10 11 00 Visual Display Units |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 21 13 16 Dry Pipe Sprinkler Systems, Fire Protection |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 10 14 00.20 Interior Signage |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 21 13 18 Preaction Sprinkler Systems, Fire Protection |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 21 13 19 Deluge Sprinkler Systems, Fire Protection |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 28 31 60 Interior Fire Alarm System, Non-Addressable |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 28 31 66 Interior Fire Alarm And Mass Notification System, Non-Addressable |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 56 53 Blast Resistant Tempered Glass Windows |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 28 31 70 Interior Fire Alarm System, Addressable |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 06 61 16 Solid Surfacing Fabrications |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 11 13 Steel Doors and Frames |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 22 33 30.00 10 Solar Water Heating Equipment |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 11 73 Sliding Fire Doors |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 08 32 13 Aluminum Sliding Glass Doors |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 10 21 13 Toilet Compartments |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 12 16.16 Road-Mix Asphalt Paving |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 12 15.13 Asphalt Paving for Airfields |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 62 13.24 Concrete Cylinder Piles |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 12 17.19 Fuel Resistant Asphalt Paving For Airfields - Surface Course |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 01 50 00 Temporary Construction Facilities and Controls |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 33 16 15 Water Storage Steel Tanks |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 62 16.16 Steel H-Piles |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 12 36.26 Polymer Concrete Micro-Overlay (PCMO) For Fuel And Abrasion Resistant Wearing Surfaces |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 62 19 Timber Piles |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 32 13 13.17 Roller Compacted Concrete Paving |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 01 45 35 Special Inspections |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 13 49 10 X-Ray Shielding |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 01 20 00 Price and Payment Procedures |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 26 55 80 Surgical, Procedure and Exam Lighting Fixtures |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 23 81 23 Computer Room Air Conditioning Units |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 27 52 24 Nurse Call System |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 25 08 11.00 20 Risk Management Framework for Facility-Related Control Systems |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 41 16 Metal Sheet Piling |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 62 16.13 Steel Pipe Piles |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 62 13.26 Pressure-Injected Footings |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 62 50 Densified Aggregate Piers |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 01 30 00 Administrative Requirements |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 63 16 Augered Cast-In-Place Piles |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 63 26.60 [Grouted] Helical Piles |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 68 13 Soil and Rock Anchors |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 01 35 26 Governmental Safety Requirements |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 13 49 21 Radio Frequency (RF) Shielding: Magnetic Resonance Imaging (MRI) |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 62 23 Piling: Composite, Wood And Cast In-Place Concrete |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 01 35 13 Special Project Procedures |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 31 62 13.20 Precast/Prestressed Concrete Piles |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 01 33 29 Sustainability Requirements and Reporting |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 51 19 Solidification and Stabilization Decontamination |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 56 13.13 Geomembrane Waste Containment |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 56 13.16 Clay Waste Containment |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 32 84 23 Underground Sprinklers |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 66 16 Test Fill |
02-01-2021 |
PDF | ZIP |
CCR |