History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
Feb-2021 | N | Aug-2020 | C | 1 |
In response to CCR 9491, updated paragraph (3.14) WARRANTY by removing Army tailoring and Specifier Note as well as requirements for future contracts and arbitration. |
Aug-2020 | N | Aug-2020 | R |
This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals. |
|
Feb-2018 | N | Nov-2011 | C | 2 |
In response to CCRs 1904 and 4945 |
Aug-2014 | N | Nov-2011 | C | 1 |
Fixed spacing in manufacturers data |
Nov-2011 | N | Nov-2011 | R |
Modified subparts 1.2.1.4 and 1.2.1.5 |
|
May-2011 | N | May-2011 | R |
Reference update: modified subparts 2.4.5 and 3.1.3 |
|
Jan-2008 | N | Jan-2008 | R |
Titled changed from Preengineered Metal Buildings; Added USACE and NASA requirements. Superseding UFGS 13 34 00.00 40 Fabricated Engineered Structures, and UFGS 13 34 20 Metal Building Systems (Minor Requirements) |