History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
May-2024 | N | May-2024 | R |
Complete review and update addressing changes within the 2024 EM 385-1-1. |
|
Aug-2023 | N | Nov-2020 | C | 4 |
In response to CCR 11849, "CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN" (1.17) has been relocated to this section from UFGS-01 45 00 QUALITY CONTROL. The references and submittals have also been updated to correspond with this new Article. |
Feb-2022 | N | Nov-2020 | C | 3 |
Added "Government Designated Authority (GDA)" to Dive Safety Requirements paragraph. In response to CCR 11124, updated first sentence in Competent Person, Cranes and Rigging paragraph. |
Nov-2021 | N | Nov-2020 | C | 2 |
In response to CCR 10735, corrected CFR reference in the Competent Person for Confined Space Entry paragraph and updated the Work Around Flammable Materials paragraph. |
Aug-2021 | N | Nov-2020 | C | 1 |
In response to CCR 9981, updated Note in APP-Construction paragraph to clarify instructions for NAVFAC PAC DB and DBB project options. |
Nov-2020 | N | Nov-2020 | R |
Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs. |
|
Aug-2020 | N | Nov-2015 | C | 10 |
In response to CCR 8826, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "ACCIDENT PREVENTION PLAN (APP)" (1.8). |
May-2020 | N | Nov-2015 | C | 9 |
In response to CCR 6508, administrative changes made in Part 1 and Part 3 to coincide with industry nomenclature. |
Aug-2019 | N | Nov-2015 | C | 8 |
In response to CCR 7273, "Dive Operations Plan" has been added as a submittal item under SD-01 and in paragraph "DIVE SAFETY REQUIREMENTS" (1.19) |
May-2019 | N | Nov-2015 | C | 7 |
In response to CCR 7271, added language to state the District Dive Coordinator will submit documents for approval via the Contracting Officer. |
Feb-2018 | N | Nov-2015 | C | 6 |
In response to CCR 5966, Note in para 1.6.1 has been updated to include Hawaii; in response to CCR 6077, item "e" under para 3.7.1 "Scaffolding" has been corrected. |
Nov-2017 | N | Nov-2015 | C | 5 |
Addition of lockout/tagout requirements when the Government of Utility is involved in the electrical outage |
Feb-2017 | N | Nov-2015 | C | 4 |
Added crane requirements for Critical Lift Plan, Barge Mounted, and Base Mounted Drum Hoists from NAVFAC P-307 that were not in EM 385-1-1. For Navy, added requirement of accident investigation reporting within 5 days of mishaps and 10 days of accidents. |
Nov-2016 | N | Nov-2015 | C | 3 |
In paragraph "Fall Protection for Roofing Work", item b. Steep-Sloped Roofs, changed slope from "4:1" to "4:12". |
Aug-2016 | N | Nov-2015 | C | 2 |
Changed requirements for portable ionizing radiation equipment. |
May-2016 | N | Nov-2015 | C | 1 |
Modified OSHA Form 300 and 300A requirements under Duties of the SSHO. |
Nov-2015 | N | Nov-2015 | R |
Updated to EM 385-1-1 (NOV 2014) requirements and terms including clarifying requirements for Dive Protection, Fall Protection, Load Handling Equipment, and Electrical. Added Subcontractor Safety requirements for Navy only. |
|
Aug-2013 | N | Feb-2012 | C | 2 |
Modified subparts 1.3,1.6.1, 3.1.3, 3.4; Removed "A" for accept from Submittal Items |
Aug-2012 | N | Feb-2012 | C | 1 |
Modified subpart 1.7 |
Feb-2012 | N | Feb-2012 | R |
Major revision |
|
Feb-2010 | N | Feb-2010 | R |
Section References (SRF) update |
|
Aug-2009 | N | Aug-2009 | R |
Major revision |
|
Feb-2009 | N | Apr-2018 | R |
Added 1.6.1.2 |
|
Nov-2008 | N | Nov-2008 | R |
Added Note for NAVFAC Pacific projects |
|
Aug-2008 | N | Aug-2008 | R |
Added missing Metric measurement and English measurement tags; Added Guam requirements to para 1.6.1.1 |