Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

Title Datesort descending View CCR
UFGS 32 32 23.13 Segmental Concrete Block Retaining Wall   02-01-2020  PDF |  ZIP  CCR
UFGS 33 01 50.31 Leak Detection For Fueling Systems   02-01-2020  PDF |  ZIP  CCR
UFGS 23 75 15 Custom-Packaged, Aircraft Pre-Conditioned Air Units   02-01-2020  PDF |  ZIP  CCR
UFGS 23 81 29 Variable Refrigerant Flow HVAC Systems   02-01-2020  PDF |  ZIP  CCR
UFGS 46 07 53 Packaged Wastewater Treatment Equipment   02-01-2020  PDF |  ZIP  CCR
UFGS 09 97 02 Painting: Hydraulic Structures   02-01-2020  PDF |  ZIP  CCR
UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts   02-01-2020  PDF |  ZIP  CCR
UFGS 46 43 21 Circular Clarifier Equipment   02-01-2020  PDF |  ZIP  CCR
UFGS 46 23 00 Grit Removal and Handling Equipment   02-01-2020  PDF |  ZIP  CCR
UFGS 27 53 19.13 First Responder Distributed Antennae Systems (DAS)   05-01-2020  PDF |  ZIP  CCR
UFGS 11 72 13 Medical Equipment, Miscellaneous   05-01-2020  PDF |  ZIP  CCR
UFGS 41 22 23.19 Monorail Hoists   05-01-2020  PDF |  ZIP  CCR
UFGS 32 13 43 Pervious Concrete Paving   05-01-2020  PDF |  ZIP  CCR
UFGS 32 11 13.16 Bituminous-Stabilized Subgrade   05-01-2020  PDF |  ZIP  CCR
UFGS 11 71 00 Sterilizers and Associated Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 11 82 19 Packaged Incinerators   05-01-2020  PDF |  ZIP  CCR
UFGS 33 46 13 Foundation Drainage   05-01-2020  PDF |  ZIP  CCR
UFGS 32 11 26.19 Bituminous-Stabilized Base and Subbase Courses   05-01-2020  PDF |  ZIP  CCR
UFGS 33 56 53 Compressed Gases Storage Tanks   05-01-2020  PDF |  ZIP  CCR
UFGS 32 11 33.13 Portland Cement-Stabilized Base Courses   05-01-2020  PDF |  ZIP  CCR
UFGS 13 17 43 Hydrotherapy Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 40 60 00 Process Control   05-01-2020  PDF |  ZIP  CCR
UFGS 32 11 26 Hot-Mix Bituminous Base Course for Roads and Streets   05-01-2020  PDF |  ZIP  CCR
UFGS 26 51 00 Interior Lighting   05-01-2020  PDF |  ZIP  CCR
UFGS 22 00 70 Plumbing for Healthcare Facilities   05-01-2020  PDF |  ZIP  CCR
UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps   05-01-2020  PDF |  ZIP  CCR
UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units   05-01-2020  PDF |  ZIP  CCR
UFGS 32 01 17.62 Paving Fabric Interlayer   05-01-2020  PDF |  ZIP  CCR
UFGS 23 11 20 Facility Gas Piping   05-01-2020  PDF |  ZIP  CCR
UFGS 44 13 51 Thermal Oxidation Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 27 51 16 Public Address Systems   05-01-2020  PDF |  ZIP  CCR
UFGS 23 30 00 HVAC Air Distribution   05-01-2020  PDF |  ZIP  CCR
UFGS 27 05 13.43 Television Distribution System   05-01-2020  PDF |  ZIP  CCR
UFGS 11 74 00 Dental Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 23 35 16.17 10 Mechanical Engine [and Welding Fume] Exhaust Systems   05-01-2020  PDF |  ZIP  CCR
UFGS 23 52 30.00 10 Heat Recovery Boilers   05-01-2020  PDF |  ZIP  CCR
UFGS 23 52 30.01 10 Central Coal-Fired Steam-Generating System   05-01-2020  PDF |  ZIP  CCR
UFGS 23 52 30.02 10 Central Steam Generating System - Combination Gas and Oil Fired   05-01-2020  PDF |  ZIP  CCR
UFGS 23 58 00.00 10 Central Steam Heating and Utilities Systems   05-01-2020  PDF |  ZIP  CCR
UFGS 23 80 20.00 10 Gas-Fired Heating Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 26 32 15.00 Engine-Generator Set Stationary 15-2500 kW, with Auxiliaries   05-01-2020  PDF |  ZIP  CCR
UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities   05-01-2020  PDF |  ZIP  CCR
UFGS 26 36 23 Automatic Transfer Switches and By-Pass/Isolation Switch   05-01-2020  PDF |  ZIP  CCR
UFGS 11 70 00 General Requirements for Medical and Dental Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities   05-01-2020  PDF |  ZIP  CCR
UFGS 22 33 30.00 10 Solar Water Heating Equipment   08-01-2020  PDF |  ZIP  CCR
UFGS 08 11 13 Steel Doors and Frames   08-01-2020  PDF |  ZIP  CCR
UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment   08-01-2020  PDF |  ZIP  CCR
UFGS 08 11 73 Sliding Fire Doors   08-01-2020  PDF |  ZIP  CCR
UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams   08-01-2020  PDF |  ZIP  CCR
UFGS 08 32 13 Aluminum Sliding Glass Doors   08-01-2020  PDF |  ZIP  CCR
UFGS 10 21 13 Toilet Compartments   08-01-2020  PDF |  ZIP  CCR
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly   08-01-2020  PDF |  ZIP  CCR
UFGS 08 33 23 Overhead Coiling Doors   08-01-2020  PDF |  ZIP  CCR
UFGS 10 22 39 Folding Panel Partitions   08-01-2020  PDF |  ZIP  CCR
UFGS 35 20 23 Dredging   08-01-2020  PDF |  ZIP  CCR
UFGS 08 36 13 Sectional Overhead Doors   08-01-2020  PDF |  ZIP  CCR
UFGS 10 26 00 Wall and Door Protection   08-01-2020  PDF |  ZIP  CCR
UFGS 35 42 34 Reinforced Soil Slope   08-01-2020  PDF |  ZIP  CCR
UFGS 08 36 19 Vertical Lift Doors   08-01-2020  PDF |  ZIP  CCR
UFGS 10 28 13 Toilet Accessories   08-01-2020  PDF |  ZIP  CCR
UFGS 13 34 19 Metal Building Systems   08-01-2020  PDF |  ZIP  CCR
UFGS 08 51 23 Steel Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 12 24 13 Roller Window Shades   08-01-2020  PDF |  ZIP  CCR
UFGS 08 51 69.10 Aluminum Storm Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 12 61 13 Upholstered Audience Seating   08-01-2020  PDF |  ZIP  CCR
UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling   08-01-2020  PDF |  ZIP  CCR
UFGS 08 52 00 Wood Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 09 51 00 Acoustical Ceilings   08-01-2020  PDF |  ZIP  CCR
UFGS 28 31 76 Interior Fire Alarm and Mass Notification System, Addressable   08-01-2020  PDF |  ZIP  CCR
UFGS 21 13 13 Wet Pipe Sprinkler Systems, Fire Protection   08-01-2020  PDF |  ZIP  CCR
UFGS 08 53 00 Plastic Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 10 11 00 Visual Display Units   08-01-2020  PDF |  ZIP  CCR
UFGS 21 13 16 Dry Pipe Sprinkler Systems, Fire Protection   08-01-2020  PDF |  ZIP  CCR
UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels]   08-01-2020  PDF |  ZIP  CCR
UFGS 10 14 00.20 Interior Signage   08-01-2020  PDF |  ZIP  CCR
UFGS 21 13 18 Preaction Sprinkler Systems, Fire Protection   08-01-2020  PDF |  ZIP  CCR
UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers   08-01-2020  PDF |  ZIP  CCR
UFGS 21 13 19 Deluge Sprinkler Systems, Fire Protection   08-01-2020  PDF |  ZIP  CCR
UFGS 28 31 60 Interior Fire Alarm System, Non-Addressable   08-01-2020  PDF |  ZIP  CCR
UFGS 28 31 66 Interior Fire Alarm And Mass Notification System, Non-Addressable   08-01-2020  PDF |  ZIP  CCR
UFGS 08 56 53 Blast Resistant Tempered Glass Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 28 31 70 Interior Fire Alarm System, Addressable   08-01-2020  PDF |  ZIP  CCR
UFGS 06 61 16 Solid Surfacing Fabrications   08-01-2020  PDF |  ZIP  CCR
UFGS 13 49 21 Radio Frequency (RF) Shielding: Magnetic Resonance Imaging (MRI)   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 13.20 Precast/Prestressed Concrete Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 23 Piling: Composite, Wood And Cast In-Place Concrete   11-01-2020  PDF |  ZIP  CCR
UFGS 01 35 13 Special Project Procedures   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 13.24 Concrete Cylinder Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 32 12 16.16 Road-Mix Asphalt Paving   11-01-2020  PDF |  ZIP  CCR
UFGS 32 12 15.13 Asphalt Paving for Airfields   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 16.16 Steel H-Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 32 12 17.19 Fuel Resistant Asphalt Paving For Airfields - Surface Course   11-01-2020  PDF |  ZIP  CCR
UFGS 01 50 00 Temporary Construction Facilities and Controls   11-01-2020  PDF |  ZIP  CCR
UFGS 33 16 15 Water Storage Steel Tanks   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 19 Timber Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 32 12 36.26 Polymer Concrete Micro-Overlay (PCMO) For Fuel And Abrasion Resistant Wearing Surfaces   11-01-2020  PDF |  ZIP  CCR
UFGS 32 13 13.17 Roller Compacted Concrete Paving   11-01-2020  PDF |  ZIP  CCR
UFGS 01 45 35 Special Inspections   11-01-2020  PDF |  ZIP  CCR
UFGS 13 49 10 X-Ray Shielding   11-01-2020  PDF |  ZIP  CCR
UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type   11-01-2020  PDF |  ZIP  CCR
UFGS 01 20 00 Price and Payment Procedures   11-01-2020  PDF |  ZIP  CCR
UFGS 26 55 80 Surgical, Procedure and Exam Lighting Fixtures   11-01-2020  PDF |  ZIP  CCR
UFGS 23 81 23 Computer Room Air Conditioning Units   11-01-2020  PDF |  ZIP  CCR
UFGS 27 52 24 Nurse Call System   11-01-2020  PDF |  ZIP  CCR
UFGS 25 08 11.00 20 Risk Management Framework for Facility-Related Control Systems   11-01-2020  PDF |  ZIP  CCR
UFGS 31 41 16 Metal Sheet Piling   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 16.13 Steel Pipe Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 13.26 Pressure-Injected Footings   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 50 Densified Aggregate Piers   11-01-2020  PDF |  ZIP  CCR
UFGS 01 30 00 Administrative Requirements   11-01-2020  PDF |  ZIP  CCR
UFGS 31 63 16 Augered Cast-In-Place Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 31 63 26.60 [Grouted] Helical Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 31 68 13 Soil and Rock Anchors   11-01-2020  PDF |  ZIP  CCR
UFGS 01 35 26 Governmental Safety Requirements   11-01-2020  PDF |  ZIP  CCR
UFGS 02 53 16.13 Remediation of Contaminated Soils by Thermal Desorption   02-01-2021  PDF |  ZIP  CCR
UFGS 31 73 19 Tunnel and Shaft Grouting   02-01-2021  PDF |  ZIP  CCR
UFGS 09 97 13.27 High Performance Coating for Steel Structures   02-01-2021  PDF |  ZIP  CCR
UFGS 31 36 00 Gabions   02-01-2021  PDF |  ZIP  CCR
UFGS 31 62 23.13 Concrete-Filled Steel Piles   02-01-2021  PDF |  ZIP  CCR
UFGS 02 54 19.13 Bioremediation Using Landfarming   02-01-2021  PDF |  ZIP  CCR
UFGS 31 23 01 Underwater Blasting   02-01-2021  PDF |  ZIP  CCR
UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks   02-01-2021  PDF |  ZIP  CCR
UFGS 02 54 19.16 Bioremediation of Soils Using Windrow Composting   02-01-2021  PDF |  ZIP  CCR
UFGS 31 23 06.00 Blasting - Surface   02-01-2021  PDF |  ZIP  CCR

Pages