NAVFAC Design-Build RFP Format  

The diagram below represents the NAVFAC Six-Part format. This is the basic format for all NAVFAC Request for Proposals (RFP) and provides a logical separation of the information needed to describe the requirements of a project. Care must be taken to divide the information into the appropriate location among the Six-Part Format. The following is a description of the information that applies to each RFP Part (click on a folder below to jump to additional information about that particular part):

RFP Part 1 – Proposal Forms and Documents

Part 1 includes the Proposal Forms and other submittal documents which are prepared by the NAVFAC Contracting Officer using the Standard Procurement System (SPS), sometimes called PDD. These documents include the legal clauses of the contract and inform the contractor on how to do business with NAVFAC.

PART 1

Proposal Forms & Documents

Part 1 of the RFP Package is prepared by the Contract Specialist using PDD (Standard Procurement System). Samples in this site are for informational purposes only.

  00001: Title Page
  00010: Table of Contents
  00100: Solicitation Form 1442
  00101: Price Schedule
  00201: Instructions to Proposers
  00210: Evaluation Factors to Award
  00600: Representations and Certifications
  00710: Contract Clauses FAR 52.202-52.252 (full text)
  00720: Contract Clauses FAR 52.202-52.252 (by reference)
  00740: Contract Clauses for Foreign Projects
  00830: Davis-Bacon Wage Rates

RFP Part 2 – General Requirements

Part 2 includes the traditional "Division 01" documents that address the administrative, safety, design processes, construction processes, and project closeout instructions for the project. These documents inform the contractor on how to do business with the local Base where the project is located and the NAVFAC Component creating the project.

PART 2

General Requirements

Part 2 of the RFP Package is prepared by the Specifications Engineer using standard UFGS and special design-build UFGS using SpecsIntact.

  01 14 00 Work Restrictions
  01 20 00 Price and Payment Procedures
  01 30 00 Administrative Requirements
  01 31 19.05 20 Concept Design Workshop (CDW)
  01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS)
  01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS)
  01 33 00.05 20 Construction Submittal Procedures
  01 33 10.05 20 Design Submittal Procedures
  01 33 29 Sustainability Requirements and Reporting
  01 35 13 Special Project Procedures
  01 35 26 Governmental Safety Requirements
  01 45 00 Quality Control
  01 45 35 Special Inspections
  01 50 00 Temporary Construction Facilities and Controls
  01 57 19 Temporary Environmental Controls
  01 74 19 Construction Waste Management and Disposal
  01 78 00 Closeout Submittals
  01 78 23 Operation & Maintenance Data
  01 78 24.00 20 Facility Data Wordbook (FDW)
  01 91 00.15 Building Commissioning
  01 91 19 Building Enclosure Commissioning

RFP Part 3 – Project Program

Part 3 provides the functional project requirements. This is the heart of the RFP and describes what the user of the facility needs and what NAVFAC wants to receive in the completed project. RFP Part 3 is divided into six chapters. RFP Part 3, Chapters 1-3 are in paragraph format describing design and site requirements; Chapters 4 and 5 are mostly tabular descriptions of the building and each room or space within the building; and Chapter 6 describes the engineering choices that are made by the RFP editor. Chapter 6 utilizes the Uniformat/ Workbreakdown Structure to allow systems descriptions of the facility and parallel the information structure and requirements of RFP Part 4.

PART 3

Project Program

Part 3 of the RFP Package is prepared by the Project Technical Team.

  1. Project Description
  2. Project Objectives
         2.1. Mission Statement
         2.2. Facility Function
         2.3. Project Specific Priorities
         2.4. Appropriate Design
         2.5. Workflow Process
         2.6. Special Design Challenges
         2.7. Adaptability and Flexibility
  3. Site Analysis
         3.1. Existing Site Conditions
         3.2. Site Development Requirements
  4. Space Tabulation Form
         4.1. Space Tabulation
         4.2. Space Relationships
         4.3. Exterior Character
  5. Room Requirements
  6. Engineering Systems Requirements
         A10 Foundations
         A20 Basement Construction
         B10 Superstructure
         B20 Exterior Enclosure
         B30 Roofing
         C10 Interior Construction
         C20 Stairs
         C30 Interior Finishes
         D10 Conveying
         D20 Plumbing
         D30 HVAC
         D40 Fire Protection
         D50 Electrical
         E10 Equipment
         E20 Furnishings
         F10 Special Construction
         F20 Select BLDG Demolition
         G10 Site Preparations
         G20 Site Improvements
         G30 Site Mechanical Utilities
         G40 Site Electrical Utilities
         H10 Waterproof Structures
         H20 Graving Drydocks
         H30 Coastal Protection
         H40 Navigation Dredging and Reclamation
         H50 Waterfront Utilities
         H60 Waterfront Demolition
         H70 Waterfront ATFP

RFP Part 4 – Performance Technical Specifications

Part 4 describes the performance and level of quality of the materials and systems of the facility. This RFP Part utilizes the Uniformat/ Workbreakdown Structure to allow systems performance requirements to be used. The RFP Editor must add materials and systems that are required for the facility but are not present in the DB template chosen but is not required to further edit this RFP Part. The Performance Technical Specifications used will depend on the Project requirements. Technical Team members edit the PTS guides for requirements within their design discipline.

PART 4

Performance Technical Specifications

Part 4 of the RFP Package is prepared by the Project Technical Team. The Performance Technical Specifications used will depend on the Project requirements. Technical Team members edit the PTS guides for requirements within their design discipline.

  A10 Foundations
  A20 Basement Construction
  B10 Superstructure
  B20 Exterior Enclosure
  B30 Roofing
  C10 Interior Construction
  C20 Stairs
  C30 Interior Finishes
  D10 Conveying
  D20 Plumbing
  D30 HVAC
  D40 Fire Protection
  D50 Electrical
  E10 Equipment
  E20 Furnishings
  F10 Special Construction
  F20 Select BLDG Demolition
  G10 Site Preparations
  G20 Site Improvements
  G30 Site Mechanical Utilities
  G40 Site Electrical Utilities
  H10 Waterproof Structures
  H30 Coastal Protection
  H40 Navigation Dredging and Reclamation
  H50 Waterfront Utilities
  H60 Waterfront Demolition
  Z10 General Performance Technical Specification

RFP Part 5 – Prescriptive Specifications

Part 5 is a place holder for UFGS Specifications in the situation that a facility has a prescriptive requirement. This Part is used judiciously in a situation that a facility has specific Navy or Marine Corps requirements that are not routinely used in the commercial market.

PART 5

Prescriptive Specifications

Part 5 of the RFP Package is prepared by the Project Technical Team. Prescriptive specifications should only be used when performance specifications will not meet the particular project requirements.

Prescriptive specifications are prepared from UFGS's edited for the requirements of the project. The number and type used will vary based on the project requirements.

                                                                                     
                                                                                     

RFP Part 6 – Attachments

Includes related information that supports the project, for example, surveys, studies, soils reports, environmental documentation, as-built drawings, existing conditions, forms, etc.

PART 6

Attachments

Part 6 of teh RFP Package is prepared by the Project Technical Team. The attachments used will depend on the project requirements but generally include the ones shown. Each Technical Team Member prepares attachments required for their discipline. Attachments may be in 8-1/2" x 11", 11" x 17" or D-size drawing format.

  Permits Record of Decision (PROD) Form
  Geotechnical Report
  Site Survey
  . . .
Federal Facility Criteria: 