UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
Nov-2019 S UFGS 02 42 51 Carpet Removal and Reclamation R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.) R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 08 33 23 Overhead Coiling Doors R Superseding section 08 34 19.10 20 - ROLLING SERVICE [AND FIRE] DOORS Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 08 34 73 Sound Control Door Assemblies R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 09 23 82 Fireproof Gypsum Plastering R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 09 67 23.13 Standard Resinous Flooring R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 09 97 13.00 40 Steel Coatings R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 10 44 16 Fire Extinguishers R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 31 63 29 Drilled Concrete Piers and Shafts R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations R Revised to combine Section 33 32 16 Packaged Utility Wastewater Pumping Stations with Section 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type. Preparing Activity changed from NAVFAC to NASA.
Nov-2019 A UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers R Complete review and update.
Nov-2019 A UFGS 34 73 13 Aircraft Tiedowns R Complete review and update to meet MF2016 and UFC 1-300-02 including section title change from MOORING AND GROUNDING POINTS FOR AIRCRAFT to AIRCRAFT TIEDOWNS.
Nov-2019 A UFGS 40 95 00 Process Control R Complete review and update.
Nov-2019 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement R Complete review and update to meet MF2016 and UFC 1-300-02; title changed from RESEALING OF JOINTS IN RIGID PAVEMENT. Revision supersedes previous version and UFGS 32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS.
Nov-2019 N UFGS 32 11 36.13 Lean Concrete Base Course R Complete review and update to meet MF2016 and UFC 1-300-02.
Nov-2019 N UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running R Complete review and update. Incorporates latest crane test and certification requirements.
Nov-2019 S UFGS 26 05 26.00 40 Grounding and Bonding for Electrical Systems R This section supersedes UFGS 28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY. The Section title and number were changed to align with the Electrical Systems.
Nov-2019 S UFGS 05 14 00.13 Welding Structural Aluminum Framing R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Feb-2020 N UFGS 01 45 35 Special Inspections R Section has been unified and merged with Navy DB RFP Division 1 Specifications to ensure that the Division 1 specs for DB and DBB are aligned, current, and compatible with USACE and NAVFAC. PA changed from Army to NAVFAC.
Feb-2020 A UFGS 09 97 02 Painting: Hydraulic Structures R Complete review and update.
Feb-2020 A UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates R Complete review and update including section title change from HIGH-SECURITY CHAIN LINK FENCES AND GATES to HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES.
Feb-2020 N UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts R Complete review and update, including Section Title change (was VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS)
Feb-2020 A UFGS 32 31 26 Wire Fences and Gates R Complete review and update.
Feb-2020 N UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley R Complete review and update. Incorporates latest crane test and certification requirements.
Feb-2020 N UFGS 46 23 00 Grit Removal and Handling Equipment R Complete review and update.
Feb-2020 N UFGS 46 43 21 Circular Clarifier Equipment R Complete review and update.
Feb-2020 A UFGS 34 71 13.19 Crash Rated Active Vehicle Barriers and Controls R Complete review and update including section title change from ACTIVE VEHICLE BARRIERS to CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS. Superseding UFGS 34 41 26.00 10 ACCESS CONTROL POINT CONTROL SYSTEM.
May-2020 N UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury R Complete review and update.
May-2020 N UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) R Complete review and update.
May-2020 N UFGS 11 70 00 General Requirements for Medical and Dental Equipment R Complete review and update; Revision includes merging contents of UFGS 01 73 19 INSTALLATION OF GOVERNMENT-FURNISHED MEDICAL EQUIPMENT into this Section.
May-2020 N UFGS 11 72 13 Medical Equipment, Miscellaneous R Complete review and update.
May-2020 N UFGS 11 74 00 Dental Equipment R Complete review and update.
May-2020 N UFGS 13 17 43 Hydrotherapy Equipment R Complete review and update.
May-2020 N UFGS 26 51 00 Interior Lighting R Complete review and update. This includes the Lighting Plates found in both Related Materials and UFGS Forms, Graphics, and Tables.
May-2020 N UFGS 26 56 00 Exterior Lighting R Complete review and update. This includes the Lighting Plates found in both Related Materials and UFGS Forms, Graphics, and Tables.
May-2020 N UFGS 32 01 17.62 Paving Fabric Interlayer R Complete review and update. Section title has been changed from STRESS-ABSORBING MEMBRANE INTERLAYER to PAVING FABRIC INTERLAYER to match the revised content of this section.
May-2020 N UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities R Complete review and update.
May-2020 N UFGS 32 13 43 Pervious Concrete Paving R Complete review and update.
May-2020 N UFGS 41 22 23.19 Monorail Hoists R Complete review and update. Incorporates latest test and certification requirements.
May-2020 A UFGS 11 71 00 Sterilizers and Associated Equipment R Complete review and update including section title change from WARMING CABINETS, STERILIZERS, AND ASSOCIATED EQUIPMENT to STERILIZERS AND ASSOCIATED EQUIPMENT.
May-2020 A UFGS 22 00 70 Plumbing for Healthcare Facilities R Complete review and update.
May-2020 A UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities R Complete review and update.
May-2020 A UFGS 27 51 16 Public Address Systems R Complete review and update including section title change from RADIO AND PUBLIC ADDRESS SYSTEMS to PUBLIC ADDRESS SYSTEMS.
May-2020 A UFGS 33 46 13 Foundation Drainage R Superseding UFGS 33 46 13 FOUNDATION DRAINAGE SYSTEM without revision to comply with MF 2011 in response to CCR 2146. Nontechnical title change.
May-2020 A UFGS 33 56 53 Compressed Gases Storage Tanks R Superseding UFGS 33 56 53 PRESSURE VESSELS FOR STORAGE OF COMPRESSED GASES without revision to comply with MF 2011 in response to CCR 2155. Nontechnical title change.
May-2020 A UFGS 41 24 26 Hydraulic Power Systems R Superseding UFGS 41 24 46 HYDRAULIC FLUID POWER SYSTEMS without revision to comply with MF 2011 in response to CCR 2184. Nontechnical title change.
May-2020 S UFGS 26 05 13.00 10 Medium-Voltage Cables R Performed Tri-Annual Maintenance. CCRs #6382 & 6784 Incorporated
May-2020 S UFGS 26 56 19.00 40 Roadway Lighting R Performed Tri-Annual Maintenance.CCR #4861 Incorporated
May-2020 S UFGS 26 56 36.00 40 Flood Lighting R Performed Tri-Annual Maintenance.
May-2020 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System R Performed Tri-Annual Maintenance.
Aug-2020 A UFGS 06 61 16 Solid Surfacing Fabrications R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRS as well as correcting formatting, references, and submittals.
Aug-2020 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 09 51 00 Acoustical Ceilings R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 11 00 Visual Display Units R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 14 00.20 Interior Signage R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 21 13 Toilet Compartments R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 22 39 Folding Panel Partitions R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 26 00 Wall and Door Protection R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 28 13 Toilet Accessories R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 12 24 13 Roller Window Shades R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 12 61 13 Upholstered Audience Seating R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 22 33 30.00 10 Solar Water Heating Equipment R Complete review and update.
Aug-2020 A UFGS 28 31 76 Interior Fire Alarm and Mass Notification System, Addressable R Completely new section replacing/consolidating (previous) UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP, UFGS 28 31 49 CARBON MONOXIDE DETECTORS, UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM, and UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE.
Aug-2020 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams R Complete review and update.
Aug-2020 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures R Complete review and update.
Aug-2020 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly R Complete review and update.
Aug-2020 A UFGS 35 20 23 Dredging R Complete review and update. PA changed from NAVFAC to USACE.
Aug-2020 A UFGS 35 42 34 Reinforced Soil Slope R Complete review and update.
Aug-2020 A UFGS 48 06 15 Turbine Oil R Complete review and update.
Aug-2020 N UFGS 08 11 13 Steel Doors and Frames R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 11 73 Sliding Fire Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 32 13 Aluminum Sliding Glass Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 36 13 Sectional Overhead Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 36 19 Vertical Lift Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 51 23 Steel Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 51 69.10 Aluminum Storm Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 52 00 Wood Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 53 00 Plastic Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 56 53 Blast Resistant Tempered Glass Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 13 34 19 Metal Building Systems R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 S UFGS 08 33 23 Overhead Coiling Doors R Periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and Submittals. Superseding UFGS 08 34 19.10 20 Rolling Service [and Fire] Doors. Revision incorporates information from UFGS 08 34 19.10 20 and CCR 3405.
Nov-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Revised to include NAVFAC Design-Build Division 01 tailoring options and CCRs.
Nov-2020 A UFGS 13 49 10 X-Ray Shielding R Complete review and update.
Nov-2020 A UFGS 27 52 24 Nurse Call System R Complete review and update.
Nov-2020 A UFGS 31 41 16 Metal Sheet Piling R Complete review and update.
Nov-2020 A UFGS 31 63 16 Augered Cast-In-Place Piles R Complete review and update including section title change from AUGER CAST GROUT PILES to AUGERED CAST-IN-PLACE PILES.
Nov-2020 A UFGS 31 68 13 Soil and Rock Anchors R Complete review and update.
Nov-2020 A UFGS 32 12 15.13 Asphalt Paving for Airfields R Complete review and update.
Nov-2020 A UFGS 33 16 15 Water Storage Steel Tanks R Complete review and update.
Nov-2020 N UFGS 31 62 13.26 Pressure-Injected Footings R Major revision to align with current industry practice.
Nov-2020 N UFGS 01 30 00 Administrative Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 35 13 Special Project Procedures R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 35 26 Governmental Safety Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 45 35 Special Inspections R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 31 62 13.24 Concrete Cylinder Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 16.16 Steel H-Piles R Major revision to align with current industry practice.

Pages