Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

Title Date View CCR
UFGS 33 52 43.12 Aviation Fuel Pantographs   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.13 Aviation Fuel Piping   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.14 Aviation Fuel Control Valves   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.23 Aviation Fuel Pumps   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems   08-01-2022  PDF |  ZIP  CCR
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks   05-01-2019  PDF |  ZIP  CCR
UFGS 33 56 19 Fuel Impermeable Liner System   11-01-2022  PDF |  ZIP  CCR
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank   11-01-2018  PDF |  ZIP  CCR
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space   11-01-2018  PDF |  ZIP  CCR
UFGS 33 56 53 Compressed Gases Storage Tanks   05-01-2020  PDF |  ZIP  CCR
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant)   11-01-2018  PDF |  ZIP  CCR
UFGS 33 60 02 Aboveground Heat Distribution System   04-01-2008  PDF |  ZIP  CCR
UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System   08-01-2010  PDF |  ZIP  CCR
UFGS 33 61 13.13 Prefabricated Underground Hydronic Energy Distribution   02-01-2016  PDF |  ZIP  CCR
UFGS 33 61 13.19 Valves, Piping, and Equipment in Valve Manholes   02-01-2016  PDF |  ZIP  CCR
UFGS 33 61 14 Exterior Buried Preinsulated Water Piping   02-01-2010  PDF |  ZIP  CCR
UFGS 33 63 13 Exterior Underground Steam Distribution System   04-01-2006  PDF |  ZIP  CCR
UFGS 33 63 13.19 Concrete Trench Hydronic and Steam Energy Distribution   02-01-2016  PDF |  ZIP  CCR
UFGS 33 63 14 Exterior Buried Pumped Condensate Return   04-01-2006  PDF |  ZIP  CCR
UFGS 33 63 16 Exterior Shallow Trench Steam Distribution   07-01-2006  PDF |  ZIP  CCR
UFGS 33 63 23 Exterior Aboveground Steam Distribution   04-01-2006  PDF |  ZIP  CCR
UFGS 33 71 01 Overhead Transmission and Distribution   05-01-2019  PDF |  ZIP  CCR
UFGS 33 71 02 Underground Electrical Distribution   08-01-2021  PDF |  ZIP  CCR
UFGS 33 82 00 Telecommunications Outside Plant (OSP)   04-01-2006  PDF |  ZIP  CCR
Division 34 - Transportation   02-01-2024  ZIP
UFGS 34 11 00 Railroad Track and Accessories   04-01-2008  PDF |  ZIP  CCR
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method   08-01-2018  PDF |  ZIP  CCR
UFGS 34 71 13.16 Vehicle Crash Barriers   02-01-2015  PDF |  ZIP  CCR
UFGS 34 73 13 Aircraft Tiedowns   11-01-2019  PDF |  ZIP  CCR
UFGS 34 73 16 Airfield Grounding   11-01-2019  PDF |  ZIP  CCR
UFGS 34 75 13.13 Crash Rated Active Vehicle Barriers And Controls   02-01-2022  PDF |  ZIP  CCR
Division 35 - Waterway and Marine Construction   02-01-2024  ZIP
UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams   08-01-2020  PDF |  ZIP  CCR
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices   05-01-2021  PDF |  ZIP  CCR
UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures   11-01-2023  PDF |  ZIP  CCR
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly   08-01-2020  PDF |  ZIP  CCR
UFGS 35 20 14 Stoplogs   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures   08-01-2018  PDF |  ZIP  CCR
UFGS 35 20 16.33 Hydraulic Miter Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.39 Hydraulic Sector Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.46 Hydraulic Tainter Gates and Anchorages   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.53 Hydraulic Vertical Lift Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.54 Slide Gates and Actuators   05-01-2021  PDF |  ZIP  CCR
UFGS 35 20 16.59 Closure Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 20 Electrical Equipment for Gate Hoist   05-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23 Dredging   08-01-2020  PDF |  ZIP  CCR
UFGS 35 20 23.13 National Dredging Quality Management Program - Scow [Monitoring][ and ][Ullage] Profile   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.23 National Dredging Quality Management Program - Hopper Dredge   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.33 National Dredging Quality Management Program - Pipeline Hydraulic Dredge   02-01-2022  PDF |  ZIP  CCR
UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures   11-01-2023  PDF |  ZIP  CCR
UFGS 35 31 19.20 Articulating Concrete Block Revetments   11-01-2023  PDF |  ZIP  CCR
UFGS 35 41 00 Levee Construction   11-01-2018  PDF |  ZIP  CCR
UFGS 35 42 34 Reinforced Soil Slope   08-01-2020  PDF |  ZIP  CCR
UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type   02-01-2021  PDF |  ZIP  CCR
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type   05-01-2021  PDF |  ZIP  CCR
UFGS 35 45 03.00 10 Speed Reducers for Storm Water Pumps   05-01-2022  PDF |  ZIP  CCR
UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type   11-01-2020  PDF |  ZIP  CCR
UFGS 35 51 13.00 20 Concrete Floating Pier for Small Craft   04-01-2006  PDF |  ZIP  CCR
UFGS 35 59 13.13 Prestressed Concrete Fender Piling   08-01-2009  PDF |  ZIP  CCR
UFGS 35 59 13.14 20 Polymeric Piles   02-01-2018  PDF |  ZIP  CCR
UFGS 35 59 13.16 Extruded and Molded Marine Fenders   11-01-2021  PDF |  ZIP  CCR
UFGS 35 59 13.17 Foam-Filled Marine Fenders   11-01-2021  PDF |  ZIP  CCR
UFGS 35 59 13.18 Pneumatic and Hydro-Pneumatic Marine Fenders   11-01-2021  PDF |  ZIP  CCR
UFGS 35 73 13 Embankment for Earth and Rockfill Dams   11-01-2018  PDF |  ZIP  CCR
Division 40 - Process Integration   02-01-2024  ZIP
UFGS 40 05 13 Pipelines, Liquid Process Piping   10-01-2007  PDF |  ZIP  CCR
UFGS 40 05 13.96 Welding Process Piping   05-01-2010  PDF |  ZIP  CCR
UFGS 40 17 26.00 20 Welding Pressure Piping   04-01-2006  PDF |  ZIP  CCR
UFGS 40 60 00 Process Control   05-01-2020  PDF |  ZIP  CCR
Division 41 - Material Processing and Handling Equipment   02-01-2024  ZIP
UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running   11-01-2019  PDF |  ZIP  CCR
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley   11-01-2022  PDF |  ZIP  CCR
UFGS 41 22 13.16 Gantry Cranes   04-01-2008  PDF |  ZIP  CCR
UFGS 41 22 13.33 Portal Crane Track Installation   05-01-2010  PDF |  ZIP  CCR
UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar   02-01-2022  PDF |  ZIP  CCR
UFGS 41 22 23.19 Monorail Hoists   05-01-2020  PDF |  ZIP  CCR
UFGS 41 36 30.00 10 Ultrasonic Inspection of Plates   01-01-2008  PDF |  ZIP  CCR
UFGS 41 65 10.00 10 [Diesel] [Natural Gas] Fueled Engine Pump Drives   05-01-2009  PDF |  ZIP  CCR
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment   02-01-2024  ZIP
UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps   05-01-2020  PDF |  ZIP  CCR
UFGS 43 15 00.00 20 Low Pressure Compressed Air Piping (Non-Breathing Air Type)   04-01-2006  PDF |  ZIP  CCR
UFGS 43 21 29 Flow Measuring Equipment (Potable Water) (Sewage Treatment Plant)   04-01-2006  PDF |  ZIP  CCR
UFGS 43 31 13.13 10 Activated Carbon-Gas and Liquid Purification Filters   08-01-2018  PDF |  ZIP  CCR
Division 44 - Pollution and Waste Control Equipment   02-01-2024  ZIP
UFGS 44 10 00 Air Pollution Control   11-01-2022  PDF |  ZIP  CCR
UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units   05-01-2020  PDF |  ZIP  CCR
UFGS 44 13 51 Thermal Oxidation Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment   08-01-2020  PDF |  ZIP  CCR
Division 46 - Water and Wastewater Equipment   02-01-2024  ZIP
UFGS 46 07 13.13 Precipitation/Coagulation/Flocculation (P/C/F) Water Treatment   05-01-2021  PDF |  ZIP  CCR
UFGS 46 07 53 Packaged Wastewater Treatment Equipment   02-01-2020  PDF |  ZIP  CCR
UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder   05-01-2021  PDF |  ZIP  CCR
UFGS 46 23 00 Grit Removal and Handling Equipment   02-01-2020  PDF |  ZIP  CCR
UFGS 46 24 16 Comminutors   05-01-2021  PDF |  ZIP  CCR
UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators   02-01-2011  PDF |  ZIP  CCR
UFGS 46 30 00 Water and Wastewater Chemical Feed Systems   08-01-2017  PDF |  ZIP  CCR
UFGS 46 30 13 Advanced Oxidation Processes (AOP)   02-01-2011  PDF |  ZIP  CCR
UFGS 46 31 11 Chlorine Gas Feed Equipment   08-01-2017  PDF |  ZIP  CCR
UFGS 46 43 21 Circular Clarifier Equipment   02-01-2020  PDF |  ZIP  CCR
UFGS 46 51 00.00 10 Air and Gas Diffusion System   05-01-2021  PDF |  ZIP  CCR
UFGS 46 53 22 Trickling Filter   05-01-2018  PDF |  ZIP  CCR
UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System   05-01-2021  PDF |  ZIP  CCR
UFGS 46 61 00 Filtration Equipment   05-01-2021  PDF |  ZIP  CCR
UFGS 46 66 56 Open-Channel Disinfection Equipment   05-01-2021  PDF |  ZIP  CCR
UFGS 46 71 16 Gravity Belt Thickeners   02-01-2011  PDF |  ZIP  CCR
Division 48 - Electrical Power Generation   02-01-2024  ZIP
UFGS 48 06 15 Turbine Oil   11-01-2023  PDF |  ZIP  CCR
UFGS 48 14 00 Solar Photovoltaic Systems   05-01-2017  PDF |  ZIP  CCR
UFGS 48 14 13.00 20 Solar Liquid Flat Plate and Evacuated Tube Collectors   05-01-2015  PDF |  ZIP  CCR
UFGS 48 15 00 Wind Generator System   05-01-2017  PDF |  ZIP  CCR
UFGS 48 16 00 Landfill Gas Systems   05-01-2017  PDF |  ZIP  CCR

Pages