Unified Master Reference List (UMRL) |
01-01-2024 |
PDF |
|
UFGS Table of Contents |
02-01-2024 |
PDF |
|
UFGS Forms, Graphics, and Tables |
02-01-2024 |
|
|
UFGS Complete |
02-01-2024 |
PDF |
|
UFGS Changes and Revisions |
02-01-2024 |
|
|
UFGS 48 16 00 Landfill Gas Systems |
05-01-2017 |
PDF | ZIP |
CCR |
UFGS 48 15 00 Wind Generator System |
05-01-2017 |
PDF | ZIP |
CCR |
UFGS 48 14 13.00 20 Solar Liquid Flat Plate and Evacuated Tube Collectors |
05-01-2015 |
PDF | ZIP |
CCR |
UFGS 48 14 00 Solar Photovoltaic Systems |
05-01-2017 |
PDF | ZIP |
CCR |
UFGS 48 06 15 Turbine Oil |
11-01-2023 |
PDF | ZIP |
CCR |
UFGS 46 71 16 Gravity Belt Thickeners |
02-01-2011 |
PDF | ZIP |
CCR |
UFGS 46 66 56 Open-Channel Disinfection Equipment |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 61 00 Filtration Equipment |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 53 22 Trickling Filter |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 46 51 00.00 10 Air and Gas Diffusion System |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 43 21 Circular Clarifier Equipment |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 46 31 11 Chlorine Gas Feed Equipment |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 46 30 13 Advanced Oxidation Processes (AOP) |
02-01-2011 |
PDF | ZIP |
CCR |
UFGS 46 30 00 Water and Wastewater Chemical Feed Systems |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators |
02-01-2011 |
PDF | ZIP |
CCR |
UFGS 46 24 16 Comminutors |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 23 00 Grit Removal and Handling Equipment |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 07 53 Packaged Wastewater Treatment Equipment |
02-01-2020 |
PDF | ZIP |
CCR |
UFGS 46 07 13.13 Precipitation/Coagulation/Flocculation (P/C/F) Water Treatment |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 44 13 51 Thermal Oxidation Equipment |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 44 10 00 Air Pollution Control |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 43 31 13.13 10 Activated Carbon-Gas and Liquid Purification Filters |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 43 21 29 Flow Measuring Equipment (Potable Water) (Sewage Treatment Plant) |
04-01-2006 |
PDF | ZIP |
CCR |
UFGS 43 15 00.00 20 Low Pressure Compressed Air Piping (Non-Breathing Air Type) |
04-01-2006 |
PDF | ZIP |
CCR |
UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 41 65 10.00 10 [Diesel] [Natural Gas] Fueled Engine Pump Drives |
05-01-2009 |
PDF | ZIP |
CCR |
UFGS 41 36 30.00 10 Ultrasonic Inspection of Plates |
01-01-2008 |
PDF | ZIP |
CCR |
UFGS 41 22 23.19 Monorail Hoists |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 41 22 13.33 Portal Crane Track Installation |
05-01-2010 |
PDF | ZIP |
CCR |
UFGS 41 22 13.16 Gantry Cranes |
04-01-2008 |
PDF | ZIP |
CCR |
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 40 60 00 Process Control |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 40 17 26.00 20 Welding Pressure Piping |
04-01-2006 |
PDF | ZIP |
CCR |
UFGS 40 05 13.96 Welding Process Piping |
05-01-2010 |
PDF | ZIP |
CCR |
UFGS 40 05 13 Pipelines, Liquid Process Piping |
10-01-2007 |
PDF | ZIP |
CCR |
UFGS 35 73 13 Embankment for Earth and Rockfill Dams |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 35 59 13.18 Pneumatic and Hydro-Pneumatic Marine Fenders |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 59 13.17 Foam-Filled Marine Fenders |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 59 13.16 Extruded and Molded Marine Fenders |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 59 13.14 20 Polymeric Piles |
02-01-2018 |
PDF | ZIP |
CCR |
UFGS 35 59 13.13 Prestressed Concrete Fender Piling |
08-01-2009 |
PDF | ZIP |
CCR |
UFGS 35 51 13.00 20 Concrete Floating Pier for Small Craft |
04-01-2006 |
PDF | ZIP |
CCR |
UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type |
11-01-2020 |
PDF | ZIP |
CCR |
UFGS 35 45 03.00 10 Speed Reducers for Storm Water Pumps |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 42 34 Reinforced Soil Slope |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 35 41 00 Levee Construction |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 35 31 19.20 Articulating Concrete Block Revetments |
11-01-2023 |
PDF | ZIP |
CCR |
UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures |
11-01-2023 |
PDF | ZIP |
CCR |
UFGS 35 20 23.33 National Dredging Quality Management Program - Pipeline Hydraulic Dredge |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 23.23 National Dredging Quality Management Program - Hopper Dredge |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 23.13 National Dredging Quality Management Program - Scow [Monitoring][ and ][Ullage] Profile |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 23 Dredging |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 35 20 20 Electrical Equipment for Gate Hoist |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.59 Closure Gates |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.54 Slide Gates and Actuators |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 20 16.53 Hydraulic Vertical Lift Gates |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.46 Hydraulic Tainter Gates and Anchorages |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.39 Hydraulic Sector Gates |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.33 Hydraulic Miter Gates |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 35 20 14 Stoplogs |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures |
11-01-2023 |
PDF | ZIP |
CCR |
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams |
08-01-2020 |
PDF | ZIP |
CCR |
UFGS 34 75 13.13 Crash Rated Active Vehicle Barriers And Controls |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 34 73 16 Airfield Grounding |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 34 73 13 Aircraft Tiedowns |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 34 71 13.16 Vehicle Crash Barriers |
02-01-2015 |
PDF | ZIP |
CCR |
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 34 11 00 Railroad Track and Accessories |
04-01-2008 |
PDF | ZIP |
CCR |
UFGS 33 82 00 Telecommunications Outside Plant (OSP) |
04-01-2006 |
PDF | ZIP |
CCR |
UFGS 33 71 02 Underground Electrical Distribution |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 71 01 Overhead Transmission and Distribution |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 33 63 23 Exterior Aboveground Steam Distribution |
04-01-2006 |
PDF | ZIP |
CCR |
UFGS 33 63 16 Exterior Shallow Trench Steam Distribution |
07-01-2006 |
PDF | ZIP |
CCR |
UFGS 33 63 14 Exterior Buried Pumped Condensate Return |
04-01-2006 |
PDF | ZIP |
CCR |
UFGS 33 63 13.19 Concrete Trench Hydronic and Steam Energy Distribution |
02-01-2016 |
PDF | ZIP |
CCR |
UFGS 33 63 13 Exterior Underground Steam Distribution System |
04-01-2006 |
PDF | ZIP |
CCR |
UFGS 33 61 14 Exterior Buried Preinsulated Water Piping |
02-01-2010 |
PDF | ZIP |
CCR |
UFGS 33 61 13.19 Valves, Piping, and Equipment in Valve Manholes |
02-01-2016 |
PDF | ZIP |
CCR |
UFGS 33 61 13.13 Prefabricated Underground Hydronic Energy Distribution |
02-01-2016 |
PDF | ZIP |
CCR |
UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System |
08-01-2010 |
PDF | ZIP |
CCR |
UFGS 33 60 02 Aboveground Heat Distribution System |
04-01-2008 |
PDF | ZIP |
CCR |
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 56 53 Compressed Gases Storage Tanks |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 56 19 Fuel Impermeable Liner System |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.23 Aviation Fuel Pumps |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.14 Aviation Fuel Control Valves |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.13 Aviation Fuel Piping |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.12 Aviation Fuel Pantographs |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 23.15 POL Service Piping Welding |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 10 Fuel Systems Piping (Service Station) |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 51 43 Instrumentation and Performance Monitoring of Structures |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 33 51 39 Monitoring Wells |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines |
08-01-2019 |
PDF | ZIP |
CCR |
UFGS 33 51 13.00 30 Natural-Gas Metering |
05-01-2010 |
PDF | ZIP |
CCR |
UFGS 33 47 13 Pond and Reservoir Liners |
11-01-2014 |
PDF | ZIP |
CCR |
UFGS 33 46 16 Subdrainage Piping |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 46 13 Foundation Drainage |
05-01-2020 |
PDF | ZIP |
CCR |
UFGS 33 40 00 Stormwater Utilities |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 34 56.00 10 Drainage Field Dosing Chambers |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 33 31 23.00 10 Sanitary Sewer Force Main Piping |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 30 00 Sanitary Sewerage |
05-01-2018 |
PDF | ZIP |
CCR |