UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
Aug-2018 A UFGS 09 51 00 Acoustical Ceilings C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 62 38 Static-Control Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 64 23 Wood Parquet Flooring C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 64 29 Wood Strip and Plank Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 65 00 Resilient Flooring C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 65 66 Resilient Athletic Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 66 13 Portland Cement Terrazzo Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 66 16 Terrazzo Floor Tile C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 66 23 Resinous Matrix Terrazzo Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 67 23.14 Chemical Resistant Resinous Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 68 00 Carpeting C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 69 13 Rigid Grid Access Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 69 19 Stringerless Access Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 72 00 Wallcoverings C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 84 20 Acoustical Wall Panels C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 11 00 Visual Display Units C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 14 00.20 Interior Signage C 1 Added bracketed item to paragraph 1.4.1 in response to CCR 6638.
Aug-2018 A UFGS 10 21 13 Toilet Compartments C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 22 19 Demountable and Moveable Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 22 39 Folding Panel Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 22 43 Sliding Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 26 00 Wall and Door Protection C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 28 13 Toilet Accessories C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 44 00 Food Cooking Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 47 00 Ice Machines C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 68 13 Playground Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 21 00 Window Blinds C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 24 13 Roller Window Shades C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 35 39 Commercial Kitchen Casework C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 35 70 Healthcare Casework C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 59 00 Systems Furniture C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 61 13 Upholstered Audience Seating C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 93 00 Site Furnishings C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 22 00 70 Plumbing for Healthcare Facilities C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 23 09 00 Instrumentation and Control for HVAC C 2 Corrected tailoring tags in response to CCR 6663.
Aug-2018 A UFGS 23 52 00 Heating Boilers C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 32 17 23 Pavement Markings C 4 Incorporated changes based on directions of the NDAA.
Aug-2018 F UFGS 26 27 13.10 30 Electric Meters C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 01 14 00 Work Restrictions C 5 Removal of reference in para 1.6 to cancelled FAC.
Aug-2018 N UFGS 01 33 29 Sustainability Requirements and Reporting C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 03 30 00 Cast-In-Place Concrete C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 05 30 00 Steel Decks C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 05 40 00 Cold-Formed Metal Framing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 05 50 13 Miscellaneous Metal Fabrications C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 06 10 00 Rough Carpentry C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 06 20 00 Finish Carpentry C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 21 13 Board and Block Insulation C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 21 23 Loose Fill Thermal Insulation C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 22 00 Roof and Deck Insulation C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 27 19.01 Self-Adhering Air Barriers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 27 26 Fluid-Applied Membrane Barriers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 27 36 Spray Foam Air Barriers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 31 13 Asphalt Shingles C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 41 13 Metal Roof Panels C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 51 13 Built-Up Asphalt Roofing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 60 00 Flashing and Sheet Metal C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 61 14.00 20 Steel Standing Seam Roofing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 61 15.00 20 Aluminum Standing Seam Roofing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 92 00 Joint Sealants C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 11 13 Steel Doors and Frames C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 11 16 Aluminum Doors and Frames C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 14 00 Wood Doors C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 31 00 Access Doors and Panels C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 44 00 Curtain Wall and Glazed Assemblies C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 51 13 Aluminum Windows C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 51 23 Steel Windows C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 52 00 Wood Windows C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 53 00 Plastic Windows C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 81 00 Glazing C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 22 00 Supports for Plaster and Gypsum Board C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 22 36 Lath C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 26 00 Veneer Plaster C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 29 00 Gypsum Board C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 64 00 Portable (Demountable) Wood Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 64 66 Wood Athletic Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 90 00 Paints and Coatings C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 10 22 13 Wire Mesh Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 10 22 26.13 Accordion Folding Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 10 22 26.23 Coiling Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 11 31 13 Electric Kitchen Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 11 48 00 Cleaning and Disposal Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 12 22 00 Curtains and Drapes C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 13 21 26 Cold-Storage Rooms (Prefabricated Panel Type) C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 22 00 00 Plumbing, General Purpose C 3 Changing Tech Notes for the following from not allowing the use of press fittings/press connections for Navy projects to coordinating with the user on the use of press fittings/press connections for copper pipe and tube for Navy and Marine Corps projects: Paragraph 2.2.1-t, Pipe Joint Materials, Press Fittings for Copper Pipe and Tube; Paragraph 3.1.3.6-d, Copper Tube and Pipe, Press Connection and; Table II Item 38, Pipe and Fitting Materials for Pressure Piping Systems, Press Fittings; Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 35 19.00 20 Industrial Ventilation and Exhaust C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers (Under 800,000 BTU/HR Output) C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output) C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 49.00 20 Steam Boilers and Equipment (500,000 - 18,000,000 BTU/HR) C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 53.00 20 Steam Boilers and Equipment (18,000,000 - 60,000,000 BTU/HR) C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 54 19 Building Heating Systems, Warm Air C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.