UFGS 06 10 00 Rough Carpentry  

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA Action Change # Nature of Change or Revision
Nov-2018 N C 2

Added notes for requirement of preservative treatment and hot-dip galvanized rough hardware in ESC C3 thru C5 and humid locations, and not to use particle board or OSB in C4 and C5 and humid locations.

Aug-2018 N C 1

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Aug-2016 N R

Alignment with Federal and DoD sustainability requirements for tracking and reporting

Feb-2012 N R

Modified subparts 1.8, 2.6 and 2.6.6

May-2011 N R

Reference updates: modified subparts 2.5.10.2 and 3.5; Removed subparts 2.6.5 and 2.6.9

Nov-2009 N R

Modified AWPA publication reference designations and other minor changes

Nov-2008 N R

Reference/organization name change from APA to AWPA

Jul-2006 N R

Added sustainable design requirements