Related Materials: Policy on UFGS Changes and Revisions
Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.
To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.
To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.
After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.
To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|---|
Jun-2006 | S | UFGS 01 35 13.00 40 Special Project Procedures | Jun-2006 | R | Reference Update | |
Jun-2006 | S | UFGS 01 35 23.00 40 Owner Safety Requirements | Jun-2006 | R | Title changed from GENERAL SAFETY REQUIREMENTS | |
Jul-2006 | A | UFGS 01 42 00 Sources for Reference Publications | Jul-2006 | R | Update contact information | |
Jul-2006 | N | UFGS 01 45 00.00 20 Quality Control | Jul-2006 | R | Added sustainable design requirements | |
Jul-2006 | N | UFGS 01 57 19.00 20 Temporary Environmental Controls | Jul-2006 | R | Thoroughly revised on many issues | |
Jul-2006 | N | UFGS 01 77 00.00 20 Closeout Procedures | Jul-2006 | R | Added sustainable design requirements | |
Jul-2006 | N | UFGS 01 78 23 Operation and Maintenance Data | Jul-2006 | R | Added sustainable design requirements | |
Jul-2006 | A | UFGS 02 41 00 [Demolition] [and] [Deconstruction] | Jul-2006 | R | Title changed from DEMOLITION; Added sustainable design requirements | |
Jun-2006 | S | UFGS 02 41 00.00 40 Demolition | Jun-2006 | R | Reference Update | |
Jul-2006 | N | UFGS 03 30 00.00 20 Cast-in-Place Concrete | Jul-2006 | R | Added sustainable design requirements | |
Jun-2006 | S | UFGS 03 30 53.00 40 Miscellaneous Cast-in-Place Concrete | Jun-2006 | R | Revised Banner; Section References (SRF) update | |
Jun-2006 | S | UFGS 03 41 33.00 40 Precast Structural Pretensioned Concrete | Jun-2006 | R | Title changed from STRUCTURAL PRECAST, PRETENSIONED CONCRETE-PLANT CAST; Revised Banner, Reference and Section References (SRF) updated | |
Jun-2006 | S | UFGS 03 45 00.00 40 Precast Architectural Concrete | Jun-2006 | R | Title changed from PRECAST CONCRETE WALL PANELS; Section References (SRF) updated | |
Jun-2006 | S | UFGS 03 47 00.00 40 Site-Cast Concrete | Jun-2006 | R | Titled changed from TILT-UP PRECAST CONCRETE; Section References (SRF) updated | |
Jun-2006 | S | UFGS 03 50 00.00 40 Cast Decks and Underlayments | Jun-2006 | R | Titled changed from PRECAST CONCRETE DECK; Section References (SRF) updated | |
Jul-2006 | A | UFGS 04 20 00 Unit Masonry | Jul-2006 | R | Combined adding NASA requirements and sustainable design requirements | |
Jun-2006 | S | UFGS 04 20 00.00 40 Unit Masonry | Jun-2006 | R | Title changed from MASONRY UNIT; References and Section References (SRF) updated | |
Jun-2006 | S | UFGS 04 22 00.00 40 Concrete Unit Masonry | Jun-2006 | R | Title changed from CONCRETE MASONRY UNITS; Section References (SRF) updated | |
Jul-2006 | N | UFGS 05 12 00 Structural Steel | Jul-2006 | R | Added NASA requirements | |
Jun-2006 | S | UFGS 05 12 00.00 40 Structural Steel Framing | Jun-2006 | R | Title changed from STRUCTURAL STEEL; Section References (SRF) updated | |
Jun-2006 | S | UFGS 05 21 00.00 40 Steel Joist Framing | Jun-2006 | R | Title changed from STEEL JOISTS; Section References (SRF) updated | |
Jul-2006 | N | UFGS 05 30 00 Steel Decks | Jul-2006 | R | Added NASA requirements | |
Jun-2006 | S | UFGS 05 30 00.00 40 Steel Decks | Jun-2006 | R | At Subpart 3.2.6 w/note, Replaced Section number 03 40 00.00 40 with 03 30 00.00 40; Updated References | |
Jun-2006 | S | UFGS 05 50 00.00 40 Metal Fabrications | Jun-2006 | R | Section References (SRF) updated | |
Jun-2006 | S | UFGS 05 51 00.00 40 Metal Stairs | Jun-2006 | R | Section References (SRF) updated | |
Jun-2006 | S | UFGS 05 70 00.00 40 Decorative Metals | Jun-2006 | R | Title changed from ORNAMENTAL METAL; Section References (SRF) updated | |
Jul-2006 | N | UFGS 06 10 00 Rough Carpentry | Jul-2006 | R | Added sustainable design requirements | |
Jun-2006 | S | UFGS 07 22 00.00 40 Roof and Deck Insulation | Jun-2006 | R | Section References (SRF) updated | |
Jul-2006 | N | UFGS 07 24 00 Exterior Insulation and Finish Systems | Jul-2006 | R | Change in fiber reinforced cement sheathing board | |
Jun-2006 | S | UFGS 07 51 13.13 40 Cold Applied Built-Up Asphalt Roofing | Jun-2006 | R | Title changed from BUILT-UP ASPHALT ROOFING; References updated | |
Jun-2006 | S | UFGS 07 52 00.00 40 Modified Bituminous Membrane Protection | Jun-2006 | R | Reference Update | |
Jun-2006 | S | UFGS 07 53 00.00 40 Elastomeric Membrane Roofing | Jun-2006 | R | Title changed from SINGLE PLY MEMBRANE ROOFING; References updated | |
Jul-2006 | N | UFGS 07 55 23 Ethylene Propylene Diene Monomer (EPDM) Roofing Membrane | Jul-2006 | R | Added NASA requirements | |
Jun-2006 | S | UFGS 07 60 00.00 40 Flashing and Sheet Metal | Jun-2006 | R | Reference Update | |
Jul-2006 | N | UFGS 07 92 00 Joint Sealants | Jul-2006 | R | Added NASA requirements and sustainable design requirements | |
Jun-2006 | S | UFGS 08 11 00.00 40 Metal Doors and Frames | Jun-2006 | R | Title changed from STEEL DOORS AND FRAMES; References Updated | |
Jul-2006 | N | UFGS 08 11 13 Steel Doors and Frames | Jul-2006 | R | Added NASA requirements | |
Jul-2006 | N | UFGS 08 11 16 Aluminum Doors and Frames | Jul-2006 | R | Added NASA requirements | |
Jun-2006 | S | UFGS 08 13 73.00 40 Sliding Metal Doors | Jun-2006 | R | Revised Banner; Section References (SRF) updated | |
Jul-2006 | N | UFGS 08 14 00 Wood Doors | Jul-2006 | R | Added NASA requirements | |
Jun-2006 | S | UFGS 08 14 00.00 40 Wood Doors | Jun-2006 | R | Reference Update | |
Jun-2006 | S | UFGS 08 33 23.00 40 Overhead Coiling Doors | Jun-2006 | R | Revised Banner; Reference and Section References (SRF) updated | |
Jun-2006 | S | UFGS 08 34 53.00 40 Security Doors and Frames | Jun-2006 | R | Title changed from FIRE INSULATED, RECORD VAULT DOORS | |
Jul-2006 | N | UFGS 08 36 13 Sectional Overhead Doors | Jul-2006 | R | Added NASA requirements | |
Jun-2006 | S | UFGS 08 36 13.00 40 Sectional Doors | Jun-2006 | R | Title changed from SECTIONAL OVERHEAD DOORS; Reference Update | |
Jun-2006 | S | UFGS 08 44 00.00 40 Curtain Wall and Glazed Assemblies | Jun-2006 | R | Title changed from GLAZED CURTAIN WALLS; Section References (SRF) updated | |
Jul-2006 | N | UFGS 08 51 13.00 20 Aluminum Windows | Jul-2006 | R | Added sustainable design requirements | |
Jun-2006 | S | UFGS 08 51 13.00 40 Aluminum Windows | Jun-2006 | R | Reference and Section References (SRF) updated | |
Jul-2006 | N | UFGS 08 51 23 Steel Windows | Jul-2006 | R | Added NASA requirements and sustainable design requirements | |
Jun-2006 | S | UFGS 08 51 23.00 40 Steel Windows | Jun-2006 | R | Reference Update | |
Jul-2006 | N | UFGS 08 52 00 Wood Windows | Jul-2006 | R | Added sustainable design requirements | |
Jul-2006 | N | UFGS 08 53 00 Plastic Windows | Jul-2006 | R | Added sustainable design requirements | |
Jul-2006 | N | UFGS 08 71 00 Door Hardware | Jul-2006 | R | Added NASA requirements | |
Jun-2006 | S | UFGS 08 71 00.00 40 Door Hardware | Jun-2006 | R | Revised Banner; Reference and Section References (SRF) updated | |
Jul-2006 | N | UFGS 08 81 00 Glazing | Jul-2006 | R | Added sustainable design requirements | |
Jul-2006 | N | UFGS 09 23 00 Gypsum Plastering | Jul-2006 | R | Added NASA requirements | |
Jun-2006 | S | UFGS 09 23 00.00 40 Gypsum Plastering | Jun-2006 | R | Title changed from GYPSUM PLASTER; Reference Update | |
Jun-2006 | S | UFGS 09 23 82.00 40 Fireproof Gypsum Plastering | Jun-2006 | R | Title changed from FIREPROOFING PLASTER | |
Jul-2006 | N | UFGS 09 29 00 Gypsum Board | Jul-2006 | R | Added NASA requirements and sustainable design requirements | |
Jul-2006 | A | UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile | Jul-2006 | R | Combined adding NASA requirements | |
Jul-2006 | A | UFGS 09 51 00 Acoustical Ceilings | Jul-2006 | R | Added sustainable design requirements | |
Jul-2006 | A | UFGS 09 64 29 Wood Strip and Plank Flooring | Jul-2006 | R | Added sustainable design requirements | |
Jul-2006 | A | UFGS 09 65 00 Resilient Flooring | Jul-2006 | R | Combined adding NASA requirements | |
Jun-2006 | S | UFGS 09 67 00.00 40 Fluid-Applied Flooring | Jun-2006 | R | Title changed from HEAVY DUTY EPOXY FLOORING | |
Jul-2006 | A | UFGS 09 68 00 Carpeting | Jul-2006 | R | Combined adding NASA requirements | |
Jun-2006 | S | UFGS 09 68 00.00 40 Carpeting | Jun-2006 | R | Title changed from CARPET; Reference Update | |
Jun-2006 | S | UFGS 09 69 00.00 40 Access Flooring | Jun-2006 | R | Title changed from ELEVATED FLOOR SYSTEM | |
Jul-2006 | A | UFGS 09 72 00 Wallcoverings | Jul-2006 | R | Combined adding NASA requirements | |
Jun-2006 | S | UFGS 09 90 00.00 40 Painting and Coating | Jun-2006 | R | Title changed from ARCHITECTURAL PAINTING | |
Jun-2006 | S | UFGS 09 97 13.00 40 Steel Coatings | Jun-2006 | R | Title changed from COATINGS FOR STEEL | |
Jul-2006 | N | UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks | Jul-2006 | R | Minor corrections | |
Jul-2006 | N | UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks | Jul-2006 | R | Minor corrections | |
Jul-2006 | N | UFGS 09 97 13.27 High Performance Coating for Steel Structures | Jul-2006 | R | Minor corrections | |
Jul-2006 | A | UFGS 10 21 13 Toilet Compartments | Jul-2006 | R | Title changed from TOILET PARTITIONS; Combined adding NASA requirements | |
Jun-2006 | S | UFGS 10 21 13.00 40 Toilet Compartments | Jun-2006 | R | Revised Banner; Reference Update | |
Jun-2006 | S | UFGS 10 21 13.16 40 Plastic-Laminate-Clad Toilet Compartments | Jun-2006 | R | Title changed from PLASTIC LAMINATE TOILET COMPARTMENTS; Reference Update | |
Jun-2006 | S | UFGS 10 22 00.00 40 Partitions | Jun-2006 | R | Reference Update | |
Jun-2006 | S | UFGS 10 22 19.53 40 Demountable Gypsum Partitions | Jun-2006 | R | Title changed from DEMOUNTABLE GYPSUM BOARD PARTITIONS | |
Jun-2006 | S | UFGS 10 22 26.13 40 Accordion-Folding Partitions | Jun-2006 | R | Section revised. | |
Jun-2006 | S | UFGS 10 28 00.00 40 Toilet, Bath, and Laundry Acessories | Jun-2006 | R | Title changed from TOILET ACCESSORIES; Section References (SRF) updated | |
Jul-2006 | A | UFGS 10 28 13 Toilet Accessories | Jul-2006 | R | Combined adding NASA requirements | |
Jun-2006 | S | UFGS 11 13 19.13 40 Loading Dock Levelers | Jun-2006 | R | Title changed from DOCK LEVELERS; Reference Update | |
Jul-2006 | A | UFGS 12 20 00 Window Treatment | Jul-2006 | R | Combined adding NASA requirements | |
Jun-2006 | S | UFGS 12 20 00.00 40 Window Treatment | Jun-2006 | R | Added information from UFGS 12 21 13.00 40 Horizontal Louver Blinds | |
Jun-2006 | S | UFGS 12 30 00.00 40 Casework | Jun-2006 | R | Title changed from CABINETS, STEEL AND WOOD; Reference Update | |
Jun-2006 | S | UFGS 13 34 00.00 40 Fabricated Engineered Structures | Jun-2006 | R | Title changed from PRE-ENGINEERED BUILDINGS | |
Jun-2006 | S | UFGS 13 50 00.00 40 Special Instrumentation | Jun-2006 | R | Title changed from INSTRUMENTATION; Reference Update | |
Jun-2006 | S | UFGS 14 21 00.00 40 Electric Traction Elevators | Jun-2006 | R | Reference and Section References (SRF) updated | |
Jun-2006 | S | UFGS 14 24 00.00 40 Hydraulic Elevators | Jun-2006 | R | Reference Update | |
Jun-2006 | S | UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems | Jun-2006 | R | Title changed from FIRE SPRINKLER SYSTEMS; Reference Update | |
Jun-2006 | S | UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems | Jun-2006 | R | Title changed from DELUGE SPRINKLER SYSTEMS; Reference and Section References (SRF) updated | |
Jun-2006 | S | UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems | Jun-2006 | R | Title changed from CARBON DIOXIDE EXTINGUISHING SYSTEMS; Reference and Section References (SRF) updated | |
Jul-2006 | N | UFGS 22 00 00 Plumbing, General Purpose | Jul-2006 | R | Added sustainable design requirements and Army and Navy options for No-water vs Non-water urinals | |
Jun-2006 | S | UFGS 22 00 00.00 40 Plumbing | Jun-2006 | R | Reference and Section References (SRF) updated | |
Jul-2006 | A | UFGS 22 04 00.00 10 Plumbing, Hospital | Jul-2006 | R | Various revisions to include CCR 1010 | |
Jun-2006 | S | UFGS 22 07 19.00 40 Plumbing Piping Insulation | Jun-2006 | R | Title changed from PIPING INSULATION; Section References (SRF) updated | |
Jun-2006 | S | UFGS 22 10 00.00 40 Plumbing Piping and Pumps | Jun-2006 | R | Title changed from PLASTIC PIPE AND FITTINGS; Section References (SRF) updated | |
Jun-2006 | S | UFGS 22 14 29.00 Sump Pumps | Jun-2006 | R | Reference and Section References (SRF) updated | |
Jun-2006 | S | UFGS 22 41 00.00 40 Residential Plumbing Fixtures | Jun-2006 | R | Title changed from PLUMBING FIXTURES; Section References (SRF) updated | |
Jun-2006 | S | UFGS 22 66 83.00 40 Chemical-Waste Tanks | Jun-2006 | R | Title changed from CHEMICAL-WASTE DRAINAGE SYSTEMS; Section References (SRF) updated |