UFGS 32 93 00 Exterior Plants |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 11 06 40.13 Foodservice Equipment Schedule |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 12 59 00 Systems Furniture |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 32 96 00 Transplanting Exterior Plants |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 12 50 00.13 10 Furniture and Furniture Installation |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 11 31 13 Electric Kitchen Equipment |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 11 41 11 Refrigerated and Frozen Food Storage Equipment |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 10 14 00.10 Exterior Signage |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 11 42 00 Food Preparation Equipment |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 11 44 00 Food Cooking Equipment |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 33 11 13 Potable Water Supply Wells |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 32 05 33 Landscape Establishment |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 23 21 23 Hydronic Pumps |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 11 47 00 Ice Machines |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 10 22 19 Demountable and Moveable Partitions |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 11 48 00 Cleaning and Disposal Equipment |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 11 68 13 Playground Equipment |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 46 30 00 Water and Wastewater Chemical Feed Systems |
08-01-2017 |
PDF | ZIP |
CCR |
UFGS 04 03 00 Conservation Treatment for Period Masonry |
11-01-2017 |
PDF | ZIP |
CCR |
UFGS 09 68 00 Carpeting |
11-01-2017 |
PDF | ZIP |
CCR |
UFGS 32 13 13.43 High Temperature Concrete Paving for Airfields Using Lightweight and Traprock Aggregates |
02-01-2018 |
PDF | ZIP |
CCR |
UFGS 35 59 13.14 20 Polymeric Piles |
02-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 11 00 Water Utility Distribution Piping |
02-01-2018 |
PDF | ZIP |
CCR |
UFGS 03 01 00 Rehabilitation of Concrete |
02-01-2018 |
PDF | ZIP |
CCR |
UFGS 03 37 13 Shotcrete |
02-01-2018 |
PDF | ZIP |
CCR |
UFGS 23 84 19.00 Desiccant Cooling Systems |
02-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 46 16 Subdrainage Piping |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 23 05 48.19 [Seismic] Bracing for HVAC |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 23 81 00 Decentralized Unitary HVAC Equipment |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 32 01 16.70 Cold-Mix Reused Asphalt Paving |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 32 01 16.74 In Place Hot Reused Asphalt Paving |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 32 16 19 Concrete Curbs, Gutters and Sidewalks |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 46 53 22 Trickling Filter |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 23 71 19 Thermal Energy Storage System: Ice-On-Coil |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 30 00 Sanitary Sewerage |
05-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 34 56.00 10 Drainage Field Dosing Chambers |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 05 12 00 Structural Steel |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 43 31 13.13 10 Activated Carbon-Gas and Liquid Purification Filters |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 05 50 14 Structural Metal Fabrications |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.12 Aviation Fuel Pantographs |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 08 53 Aviation Fuel Distribution System Start-Up |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.13 Aviation Fuel Piping |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 01 32 16.00 20 Small Project Construction Progress Schedules |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.14 Aviation Fuel Control Valves |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks) |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 01 33 00 Submittal Procedures |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.23 Aviation Fuel Pumps |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 09 97 23 Metallic Type Conductive/Spark Resistant Concrete Floor Finish |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 02 62 13.00 10 Air and Steam Stripping |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 02 62 16.13 10 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 02 62 16.16 10 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 05 50 15 Civil Works Fabrications |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 31 23.00 10 Sanitary Sewer Force Main Piping |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 05 05 23.16 Structural Welding |
08-01-2018 |
PDF | ZIP |
CCR |
UFGS 35 41 00 Levee Construction |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 31 11 00 Clearing and Grubbing |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 02 82 00 Asbestos Remediation |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 02 81 00 Transportation and Disposal of Hazardous Materials |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 31 21 13 Radon Mitigation |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 10 Fuel Systems Piping (Service Station) |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 02 83 00 Lead Remediation |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 02 85 00 Mold Remediation |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 35 73 13 Embankment for Earth and Rockfill Dams |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 11 11 37 Electric Vehicle Supply Equipment |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 09 52 Fuel Pump Control and Annunciation System (Non-Hydrant) |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 23.15 POL Service Piping Welding |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 32 01 29.62 Concrete Pavement Raising |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 02 42 91 Removal and Salvage of Historic Construction Materials |
11-01-2018 |
PDF | ZIP |
CCR |
UFGS 03 31 30 Marine Concrete |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 01 74 19 Construction Waste Management and Disposal |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other Building Control Systems |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 01 42 00 Sources for Reference Publications |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines) |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 03 31 29 Marine Concrete with Service Life Modeling |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 03 30 00 Cast-In-Place Concrete |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 32 12 15.16 Stone Matrix Asphalt (SMA) for Airfield Paving |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 23 09 00 Instrumentation and Control for HVAC |
02-01-2019 |
PDF | SEC |
CCR |
UFGS 21 13 25 High-Expansion Foam System, Fire Protection |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 26 56 20 Airfield and Heliport Lighting and Visual Navigation Aids |
02-01-2019 |
PDF | ZIP |
CCR |
UFGS 26 33 53 Static Uninterruptible Power Supply (UPS) |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 01 78 00 Closeout Submittals |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 08 81 00 Glazing |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 33 71 01 Overhead Transmission and Distribution |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 08 44 00 Curtain Wall and Glazed Assemblies |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 08 51 13 Aluminum Windows |
05-01-2019 |
PDF | ZIP |
CCR |
UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines |
08-01-2019 |
PDF | ZIP |
CCR |
UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant) |
08-01-2019 |
PDF | ZIP |
CCR |
UFGS 01 58 00 Project Identification |
08-01-2019 |
PDF | ZIP |
CCR |
UFGS 32 11 13.13 Lime Treated Subgrade |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 34 73 13 Aircraft Tiedowns |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 02 42 51 Carpet Removal and Reclamation |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 32 11 36.13 Lean Concrete Base Course |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 32 13 73.19 Compression Concrete Paving Joint Sealant |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 10 44 16 Fire Extinguishers |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 32 14 13.13 Interlocking Precast Concrete Unit Paving |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 05 14 00.13 Welding Structural Aluminum Framing |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 34 73 16 Airfield Grounding |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 08 34 73 Sound Control Door Assemblies |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 32 12 16.19 Cold-Mix Asphalt Paving |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.) |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 09 23 82 Fireproof Gypsum Plastering |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 31 63 29 Drilled Concrete Piers and Shafts |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 09 67 23.13 Standard Resinous Flooring |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement |
11-01-2019 |
PDF | ZIP |
CCR |
UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers |
11-01-2019 |
PDF | ZIP |
CCR |