UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment  

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA Action Change # Nature of Change or Revision
May-2022 S R

Revision: Update technical requirements, references format, and incorporate the following CCRs: 6858, 7126

Aug-2015 S R

Tri-Annual Database Maintenance (TADM) completed

Nov-2012 S C 2

Modified Submittal Article; minor changes to the heading titles in table to resolve the issues of the CCR #589; imperative language; added some TST tags

Aug-2012 S C 1

Per CCR 1798, subpart 2.1 - revised Chapter No, per CCR 589 made some changes to the "headings" in the tables due to comment in CCR in the following subparts: 2.2.1 - 2.2.6, 2.2.9 - 2.2.11

Feb-2011 S N

Renumbered to NASA fifth level; Superseding UFGS 23 05 48 with no title change

Apr-2008 S D

Renumbered/ Superseding UFGS 23 05 48 with no title change
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.

Jun-2006 S R

Title changed from VIBRATION ISOLATION FOR AIR CONDITIONING EQUIPMENT; Reference and Section References (SRF) updated