UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Sectionsort ascending Action Change # Nature of Change or Revision
May-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.
Jan-2007 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Deleted [DESIGN BUILD] from the title and Design-Build requirements from the section.
Nov-2018 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Corrected notes and paragraphs, for DB and DBB, on Baseline NAS submittals and requirements.
Aug-2019 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Updated section to include the required Oracle Primavera P6 software settings to be utilized in preparation and maintenance of the construction schedule and the tabular reports required to be submitted with each monthly invoice.
Aug-2020 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 3 In response to the following CCRs: CCR 8739, paragraph "Construction Activities" (1.10.2.5.6) has been updated to clarify federal holidays; CCR 8891, clarified schedule deliverables due from the contractor and added checklists for the KTR as attachments (found under Related Materials) ; CCR 8971, revised Note in Submittals Article regarding Design-Build Requirements; and CCR 8823, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: updated paragraphs "Project Baseline Schedule" (1.2.2), Submittal Article SD-01, and "DESIGNATED PROJECT SCHEDULER" (1.9).
Nov-2023 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Complete review and update. Added new Related Materials: "Contractor Baseline Schedule General Commissioning/HVAC Review Checklist"
Nov-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays.
Feb-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules R Title changed from CONSTRUCTION PROGRESS DOCUMENTATION; thoroughly revised Schedule Format, Schedule Monthly Updates, and Contract Modification.
Nov-2009 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules R Major revision
May-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 1 Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.
Aug-2018 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules R Updated Scheduling software settings and requirements and tailoring.  Added Design-Build Requirements.
Aug-2020 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 1 In response to the following CCRs: CCR 8738, clarified adverse weather requirements and schedule modifications required due to non-work days in paragraph "Anticipated Weather Lost Work Days" (1.3.1.2); CCRs 8822 and 9013, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "PRE-CONSTRUCTION SCHEDULE REQUIREMENT" (1.2).
Feb-2015 A UFGS 01 32 01.00 10 Project Schedule R Complete Section review and refresh
Aug-2013 A UFGS 01 32 01.00 10 Project Schedule C 1 Require use of Primavera P6
Aug-2008 A UFGS 01 32 01.00 10 Project Schedule R Minor corrections throughout
Jul-2007 A UFGS 01 32 01.00 10 Project Schedule R Revised in response to CCRs 1117 and 1120; submittal paragraph added
Jan-2007 A UFGS 01 32 01.00 10 Project Schedule R Added Design-Build tailoring option
Oct-2006 A UFGS 01 32 01.00 10 Project Schedule R Digital media and design-build added
Aug-2023 A UFGS 01 32 01.00 10 Project Schedule R Complete review and update.
Aug-2017 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 1 Changed submittal period of Personnel List, personnel roles, and removed Certified Payrolls, Invoice, and Routine Correspondence from Table 1; Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
May-2018 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 2 Incorporation of eCMS Transmittal function into Table 1.
May-2017 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) N New Section
Nov-2019 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 3 In response to CCR 7497, brackets were added to the paragraph Field Administration (1.4.3) and the text was updated to clarify the disposition of the tablet computer.
Feb-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 4 In response to CCR 7810, paragraphs CONTRACT ADMINISTRATION (1.1), Information Security Classification/Identification (1.6.1), and Table 1 revised to clarify the procedure when documentation exists outside of the eCMS environment and a request is made to the contractor to provide as final project documentation.
Aug-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 5 In response to CCR 8821, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01
Feb-2021 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 6 In response to CCRs 9429 and 9621, removed reference to DoD Manual 5200.01-V4 and all FOUO designations; replaced "FOUO - For Official Use Only" with "CUI Controlled Unclassified Information" throughout; and changed CLASS heading in Table 1 to "DESIG" (designation).
Nov-2021 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 7 In response to CCR 11022, updated requirements for jobsite computer tablet in the Field Administration paragraph, and CCR 11023, updated the Contract Administration paragraph to clarify eCMS file storage structure. Also added minimum download and upload speeds to paragraph 1.4.1 General.
Feb-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 8 In response to CCR 12594, updated ECMS UTILIZATION paragraph (1.6) to clarify when contractors must utilize eCMS for transferring submittals.
Aug-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) R Complete refresh of the Section to coincide with the 15.2 update of the system; added "(eCMS)" to Section title
Aug-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 1 Updated language in Loss of Privilege (1.2.3) and RFIs Module (1.6.3) paragraphs
Jan-2008 N UFGS 01 31 23 Web-Based Construction Management (WEBCM) D No longer a requirement to use. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2022 A UFGS 01 31 20 Project Technical Data Management and Visualization N New UFGS
Oct-2007 S UFGS 01 31 19.00 40 D Redundant, section deleted. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2011 N UFGS 01 30 00 Administrative Requirements R Modified subparts 1.2, 1.7, 1.9, 1.15 and 1.16
Aug-2015 N UFGS 01 30 00 Administrative Requirements R Revised throughout.
Feb-2010 N UFGS 01 30 00 Administrative Requirements R Minor revision to paragraphs 1.10 and 1.11
Nov-2009 N UFGS 01 30 00 Administrative Requirements R Deleted paragraph 1.15
Aug-2014 N UFGS 01 30 00 Administrative Requirements C 2 Deleted 35 mm slides as picture media
Aug-2012 S UFGS 01 30 00 Administrative Requirements C 1 Modified subpart 1.10
Aug-2008 N UFGS 01 30 00 Administrative Requirements R Added requirements for NAVFAC Red Zone, revised section references from MF95 to MF2004, and added missing Section References (SRF) tags
Nov-2011 N UFGS 01 30 00 Administrative Requirements R Modified note in subpart 1.6, deleted subpart 1.12 "Fair Labor Standards Act for Puerto Rico", modified note in subpart 1.14
Apr-2007 N UFGS 01 30 00 Administrative Requirements R Deleted insurance requirements for NAVFAC Pacific.
Oct-2006 N UFGS 01 30 00 Administrative Requirements R Added NAVFAC SW Tailoring Option
Jul-2006 N UFGS 01 30 00 Administrative Requirements R Added sustainable design requirements
Apr-2006 N UFGS 01 30 00 Administrative Requirements R Various changes to incorporate Navy Regional requirements
Nov-2019 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 6757, paragraph FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS (1.7) was deleted as it is repetitive of requirements already noted in Section 02 82 00 ASBESTOS REMEDIATION; per CCR 6658, Air Force tailoring has been added to the paragraphs "Duties" (1.7.2.1) and FACILITY TURNOVER PLANNING MEETINGS (NAVFAC Red Zone - NRZ) (1.9) since AFCEC/CF utilizes the Red Zone processes.
Feb-2020 N UFGS 01 30 00 Administrative Requirements C 2 In response to CCR 7879, updated language in subpart (1.12.1) Formal Partnering Specifier Note to ensure the facilitator is independent of both agencies involved in the project.
May-2020 N UFGS 01 30 00 Administrative Requirements C 3 In response to CCR 8484, updated paragraph Formal Partnering (1.12.1) to ensure the facilitator is independent of both agencies involved in the project.
Aug-2020 N UFGS 01 30 00 Administrative Requirements C 4 In response to CCRS 8820 and 9015, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01, updated paragraph "Formal Partnering" (1.12.1), and added paragraph "MOBILIZATION" (1.14).
Nov-2020 N UFGS 01 30 00 Administrative Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Aug-2021 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 10208, updated requirements for NAVFAC PAC DB and DBB in Partnering and Mobilization paragraphs.
May-2022 N UFGS 01 30 00 Administrative Requirements C 2 Per CCR 9893, updated the Note in paragraph COLOR BOARDS FOR AIR FORCE PROJECTS (1.3) tailored for AIR FORCE to include AFI citation.
Aug-2023 N UFGS 01 30 00 Administrative Requirements C 3 Revised benchmarks for NAVFAC partnering based on 11013.40B
Aug-2015 A UFGS 01 22 00.00 10 Price and Payment Procedures R Scheduled maintenance update of section; Superseding UFGS 01 22 00.00 10 Measurement and Payment to comply with CSI MasterFormat.
Nov-2020 A UFGS 01 22 00.00 10 Price and Payment Procedures D Superseded by new unified section UFGS 01 20 00 PRICE AND PAYMENT PROCEDURES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2015 A UFGS 01 20 01.00 10 Cost and Performance Report D Superseded by UFGS 01 35 13.43 10 Special Project Procedures for Contaminated Sites; Scheduled maintenance update of section. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2016 N UFGS 01 20 00.00 20 Price and Payment Procedures C 1 Updated invoice form numbers and DFARS clause for submission of Invoices.
Feb-2010 N UFGS 01 20 00.00 20 Price and Payment Procedures R 1.3.2 Title change and paragraph change
Aug-2009 N UFGS 01 20 00.00 20 Price and Payment Procedures R Updated the last criteria NOTE (Costloaded NAS) in the introduction; updated paras 1.3, 1.5,1.6, 1.7.2.
Aug-2011 N UFGS 01 20 00.00 20 Price and Payment Procedures R Modified subpart 1.5.1
Feb-2011 N UFGS 01 20 00.00 20 Price and Payment Procedures R Major revision
Nov-2011 N UFGS 01 20 00.00 20 Price and Payment Procedures R Modified note in subpart 1.5.g
Jul-2006 N UFGS 01 20 00.00 20 Price and Payment Procedures R Added requirements relating to precast/prestressed concrete piles
Feb-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 2 In response to CCRs 8045 and 8049 subparts (1.3.1) Data Required and (1.3.2) Schedule Instructions updated to distinguish the requirements between schedule of prices and earned value reports.
Aug-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 3 In response to CCR 8819, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and in paragraph "Data Required" (1.3.1)
Nov-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures D Superseded by new unified section, UFGS 01 20 00 PRICE AND PAYMENT PROCEDURES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 N UFGS 01 20 00 Price and Payment Procedures N New Unified Section; Superseding UFGS 01 20 00.00 20 and UFGS 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
Feb-2021 N UFGS 01 20 00 Price and Payment Procedures C 1 In response to CCR 9618, reference to FAR 32.503-6 has been replaced with "FAR 32.103 Progress payments under construction contracts" in paragraph (1.7.1) "Obligation of Government Payments" .
Aug-2021 N UFGS 01 20 00 Price and Payment Procedures C 2 In response to CCR 9972, included timeline requirements for both Schedule of Prices and Earned Value Report and corrected typo in Note in Data Required paragraph.
Feb-2023 N UFGS 01 20 00 Price and Payment Procedures C 3 In response to CCR 12177, replaced "lump sum" with "Job" in second Note for Army projects, removed "lump sum" from DREDGING paragraph (1.11).
Aug-2017 N UFGS 01 14 00 Work Restrictions C 4 Incorporation of DBIDS procedures for access to NAVY Installations.
May-2011 N UFGS 01 14 00 Work Restrictions R Modified subparts 1.4.1.2, 1.4.1.3, 1.4.10 and 1.5.7
Feb-2016 N UFGS 01 14 00 Work Restrictions C 3 Added requirement for utility cutover and connection to existing sanitary sewer line.
Aug-2014 N UFGS 01 14 00 Work Restrictions C 2 Fixed tailoring and bracket issue throughout. Revised Employment Restrictions for Bremerton, WA
Aug-2013 N UFGS 01 14 00 Work Restrictions C 1 Tailoring and changes for NAVFAC NW throughout
Nov-2011 N UFGS 01 14 00 Work Restrictions R Deleted subpart 1.5.18: "Commonwealth of Puerto Rico"; modified subparts 1.5.7 and 1.5.9
Aug-2018 N UFGS 01 14 00 Work Restrictions C 5 Removal of reference in para 1.6 to cancelled FAC.
Jul-2007 N UFGS 01 14 00 Work Restrictions R Added paragraph on smoking policy.
Jul-2006 N UFGS 01 14 00 Work Restrictions R Added NAVFAC Pacific color restrictions
Apr-2006 N UFGS 01 14 00 Work Restrictions R Various changes to incorporate Navy Regional requirements
Nov-2018 N UFGS 01 14 00 Work Restrictions C 6 Changed tailoring tags from NAVFAC PAC to NAVFAC HI based on CCRs, removed outdated information for Naval Shipyard Pearl Harbor, HI, and added personnel security requirements for use in secure or controlled areas.
May-2019 N UFGS 01 14 00 Work Restrictions C 7 In response to CCR 7479, the location and phone number for SWFPAC Pass and ID office has been updated in paragraph 1.16.1.1 Vehicle Access
Feb-2020 N UFGS 01 14 00 Work Restrictions C 8 In response to CCR 7400, Specifier Note in paragraph (1.5.8) Occupied (and Existing) Building[s] updated to clarify the Government’s responsibility to remove or relocate equipment and direct users on how to modify this section; per CCR 7849, Saturday working hours were updated to reflect an 8-1/2 hour work period in paragraph (1.5.5) Working Hours.
May-2020 N UFGS 01 14 00 Work Restrictions C 9 Incorporates requirements of UFGS 00 73 01 SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY and cancels UFGS 00 73 01; In response to CCR 7820, refinement of electronic security system equipment categories within paragraph Electronic Security Systems Equipment (1.5.1.2.3)
Aug-2020 N UFGS 01 14 00 Work Restrictions C 10 Incorporate EURAFCENT requirements from, and supersede UFGS 00 74 00 SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA. Also, incorporate the following CCRs: CCR 8681, revised requirements to ensure adherence to all appropriate PPE in paragraphs "Activity Regulations" (1.5.1) and "Shipyard Regulations" (1.5.3); CCR 8683, updated Specifier Note and paragraph "Working Hours" (1.5.5) to reflect the work schedules for various regions.
Nov-2020 N UFGS 01 14 00 Work Restrictions C 11 Updated Additional Personnel Requirements (1.5.1.2) and subparagraph to clarify work restrictions for secure facilities. Incorporated the following CCRs: CCR 9027, revised General Note in relation to tailoring options included in the section; CCR 9028, corrected tailoring in Part 1; and CCR 9029, corrected subpart hierarchy by moving "Unarmed Escort Services" paragraph into "CONTRACTED SERVICES FOR NBK BANGOR, SILVERDALE, WA. (1.16).
May-2021 N UFGS 01 14 00 Work Restrictions C 12 In response to CCR 9908, paragraph Shipyard Area Work Clearance Request (1.5.10) has been tailored for Navy.
Aug-2021 N UFGS 01 14 00 Work Restrictions C 13 In response to the following CCRs: 9044, added Note to Submittal Article with instructions for Navy Design-Build projects; 9826, updated last sentence in Activity Regulations paragraph (1.5.1) to clarify identifying Contractor equipment; 3976, replaced "must" with "will" or "may" throughout Part 1 as appropriate.
Feb-2022 N UFGS 01 14 00 Work Restrictions C 14 In response to CCR 11282, "Naval Base, Norfolk VA" and "Naval Air Station, Norfolk, VA" changed to "Naval Station Norfolk, Norfolk, VA".
Nov-2022 N UFGS 01 14 00 Work Restrictions R Complete review to reset section date; address CCRs 12149 & 12150, added "U.S. persons" to General Construction and Finish Work note and paragraph.
Feb-2023 N UFGS 01 14 00 Work Restrictions C 1 In response to CCR 12429, updated work requirements at Naval Base Kitsap.
Jul-2006 S UFGS 01 11 10.00 40 Summary of Work D Superseded by UFGS 01 11 00.00 40 Summary of Work Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2008 S UFGS 01 11 00.00 40 Summary of Work D Superseded by UFGS 01 11 00 Summary of Work (Preparing Activity: NAVFAC) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jun-2006 S UFGS 01 11 00.00 40 Summary of Work N New - Superseding UFGS 01 11 10.00 40 Summary of Work
Aug-2015 N UFGS 01 11 00 Summary of Work R Revised throughout. Removed Project Environmental Goals covered under UFGS 01 33 29 Sustainability Reporting.
Nov-2014 N UFGS 01 11 00 Summary of Work C 1 SRF Update: Replaces 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.
Jan-2008 N UFGS 01 11 00 Summary of Work R Added NASA requirements; this section supersedes UFGS 01 11 00.00 40
Aug-2011 N UFGS 01 11 00 Summary of Work R Modifed note before PART 1; modified note in subpart 1.14.1; added note in part 1.5; removed all notes in PART 3
Jul-2007 N UFGS 01 11 00 Summary of Work R Corrected hyperlink to CCB.
Jul-2006 N UFGS 01 11 00 Summary of Work R Added sustainable design requirements