UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Sectionsort descending Action Change # Nature of Change or Revision
Jul-2006 N UFGS 32 84 24 Irrigation Sprinkler Systems R Added reference to UFGS Section 03 40 00.00 10 Plant-Precast Concrete Products for Below Grade Construction
Aug-2017 N UFGS 32 92 19 Seeding R Sustainability updates, formatting to meet UFC 1-300-02 , reference updates and general revisions.
May-2016 N UFGS 32 92 19 Seeding C 1 CCR 4742: Revised subpart 3.4.4
Oct-2006 N UFGS 32 92 19 Seeding R Corrected dihydrate percentage in paragraph entitled Gypsum (2.3.9)
Aug-2021 N UFGS 32 92 19 Seeding C 1 In response to CCR 10412, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Apr-2006 N UFGS 32 92 23 Sodding R To conform with CSI MasterFormat, replacing without change UFGS-02922 (May 2004)
Aug-2021 N UFGS 32 92 23 Sodding C 1 In response to CCR 10413, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2017 N UFGS 32 92 26 Sprigging R Sustainability updates, formatting to meet UFC 1-300-02 , reference updates and general revisions.
Aug-2021 N UFGS 32 92 26 Sprigging C 1 In response to CCR 10414, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2017 N UFGS 32 93 00 Exterior Plants R Sustainability updates, formatting to meet UFC 1-300-02 , reference updates and general revisions.
Feb-2017 N UFGS 32 93 00 Exterior Plants C 2 CCR 4981: References to ASTM D5203 and ASTM D5852 have been removed from this Section.
Feb-2010 N UFGS 32 93 00 Exterior Plants R Reference Identifier (RID) and Section References (SRF) updates
Aug-2014 N UFGS 32 93 00 Exterior Plants C 1 CCR 3597: ASTM D1527 has been withdrawn with not replacement and CCR 3602: ASTM D1972 has been withdrawn with no replacement
Jul-2006 N UFGS 32 93 00 Exterior Plants R Added sustainable design requirements
Aug-2021 N UFGS 32 93 00 Exterior Plants C 1 In response to CCR 10415, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2017 N UFGS 32 96 00 Transplanting Exterior Plants R Sustainability updates, formatting to meet UFC 1-300-02 , reference updates and general revisions.
Feb-2010 N UFGS 32 96 00 Transplanting Exterior Plants R Reference Identifier (RID) and Section References (SRF) updates
Jul-2006 N UFGS 32 96 00 Transplanting Exterior Plants R Added sustainable design requirements
Aug-2021 N UFGS 32 96 00 Transplanting Exterior Plants C 1 In response to CCR 10416, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2016 N UFGS 33 01 30.16 TV Inspection of Sewer Lines N New section
Nov-2021 N UFGS 33 01 30.16 TV Inspection of Sewer Lines R Complete review and revision including title change from TV INSPECTION OF SEWER PIPELINES.
Feb-2024 N UFGS 33 01 30.16 TV Inspection of Sewer Lines C 1 In response to CCR 11690, section was updated to include side wall scanning (panoramic) cameras.
Aug-2016 N UFGS 33 01 30.72 Relining Sewers C 1 Added section references referring to UFGS Section 33 01 30.16 TV Inspection of Sewer Pipelines
May-2016 N UFGS 33 01 30.72 Relining Sewers N Superseding 33 01 99 Slip Lining of Existing Piping (Preparing Activity NASA).
Nov-2021 N UFGS 33 01 30.72 Relining Sewers R Complete review and revision.
Feb-2010 A UFGS 33 01 50.01 Cleaning Fuel Storage Tanks N New section
Aug-2018 A UFGS 33 01 50.01 Cleaning Fuel Storage Tanks D Cancelled and replaced by existing UFGS 33 65 00 CLEANING PETROLEUM STORAGE TANKS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 33 01 50.31 Leak Detection For Fueling Systems N Superseding UFGS 33 58 00 LEAK DETECTION FOR FUELING SYSTEMS. Complete review and update including section number change from 33 58 00 to 33 01 50.31.
Nov-2018 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks R (UFGS-33 01 50.60) Complete review and update including new Section number and title; Superseding UFGS 33 65 00 CLEANING PETROLEUM STORAGE TANKS (Aug-11)
Nov-2020 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks C 1 (UFGS-33 01 50.60) In response to CCR 7720, paragraph "TANK CLEANING" (3.7) has been updated.
Feb-2021 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks R Replacing without change UFGS-33 01 50.60 / Non-technical Section Number change
Feb-2021 N UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks N New section to address the requirements for an out of service Inspection of a Field Fabricated Fuel Storage Tank.
May-2013 A UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications N New UFGS Section
Feb-2023 A UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications R Complete review and update.
May-2016 S UFGS 33 01 99 Slip Lining of Existing Piping D Superseded by UFGS Section 33 01 30.72 Relining Sewers; Preparing Activity changed from NASA to NAVFAC. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2009 S UFGS 33 01 99 Slip Lining of Existing Piping N New section
Feb-2024 A UFGS 33 05 07.13 Utility Directional Drilling N New UFGS section superseding UFGS-33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
Jul-2006 N UFGS 33 05 13 Electrical Manhole and Handhole D Content added to UFGS 33 71 02.00 20 Underground Electrical Distribution Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2008 N UFGS 33 05 16 Concrete Poles R Section References (SRF) update
Aug-2018 N UFGS 33 05 16 Concrete Poles D Concrete poles are covered in UFGS 03 45 33 PRECAST[ PRESTRESSED] STRUCTURAL CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2016 N UFGS 33 05 23 Trenchless Utility Installation C 2 Added section references referring to UFGS Section 33 01 30.16 TV Inspection of Sewer Pipelines
Nov-2015 N UFGS 33 05 23 Trenchless Utility Installation C 1 Removed reference to UFGS Section 33 01 30.16 in subpart 3.5.3, as this section is not yet published
Aug-2015 N UFGS 33 05 23 Trenchless Utility Installation N New UFGS Section; Superseding UFGS 33 05 23.19 Trenchless Excavating using Microtunneling
Feb-2016 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling C 1 Performed updating of Section Format, imperative language, formatting review, and Submittal Article clean up
Feb-2010 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling N New section
Nov-2013 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling R Tri-Annual Database Maintenance (TADM) completed
Nov-2019 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2022 F UFGS 33 05 23.13 Utility Horizontal Directional Drilling C Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2013 N UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling C 1 Revised subparts 1.2, 1.3.1, 2.4 and 3.1.1
Aug-2015 A UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling D Superseded by UFGS 33 05 23 Trenchless Utility Installation; Nontechnical number and title change Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2010 A UFGS 33 08 53 Aviation Fuel Distribution System Start-Up N New section
Aug-2018 A UFGS 33 08 53 Aviation Fuel Distribution System Start-Up R Complete review and update.
Jul-2007 N UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant) N New; Superseding UFGS 23 14 00 Commissioning of Fuel Facility Systems
Aug-2019 N UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant) R New title (formerly COMMISSIONING OF FUEL FACILITIES); Section revised and enhanced to include the requirements for Initial fuel receipt, flushing, cleaning, control valve adjustments, equipment tests and performance testing for fuel facilities that are “dead-end” type; Preparing Activity has been changed from Air Force to Navy.
Nov-2018 N UFGS 33 09 52 Fuel Pump Control and Annunciation System (Non-Hydrant) N New section
Feb-2010 A UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) N New section
Aug-2018 A UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) R Complete review and update.
Feb-2021 A UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) R Superseding UFGS 33 09 53 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM without revision to comply with MF 2011 in response to CCR 2138. Nontechnical title change.
Feb-2010 A UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) N New section
Aug-2018 A UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) R Complete review and update.
Feb-2010 A UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks) N New section
Aug-2018 A UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks) R Complete review and update.
Aug-2017 N UFGS 33 11 00 Water Utility Distribution Piping C 1 Updated to coordinate archiving of Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
May-2016 N UFGS 33 11 00 Water Utility Distribution Piping R Title changed from WATER DISTRIBUTION; revised throughout, superseding the previous section.
Feb-2018 N UFGS 33 11 00 Water Utility Distribution Piping R Complete revision of this section
Nov-2009 N UFGS 33 11 00 Water Utility Distribution Piping R Section References (SRF) update
Nov-2014 N UFGS 33 11 00 Water Utility Distribution Piping C 4 Updated Note under Subpart 2.1 Allowable Piping Materials, paragraph 4.
Feb-2014 N UFGS 33 11 00 Water Utility Distribution Piping C 3 Modified subparts 2.2.1.3, 3.1.3.2, 3.2.2, 3.2.3; added 3.2.2.1 and 3.2.2.2
Nov-2013 N UFGS 33 11 00 Water Utility Distribution Piping C 2 Revised subparts 2.1.2.7, 2.2.2.17, 3.1.2.2 and 3.2.2
Nov-2012 N UFGS 33 11 00 Water Utility Distribution Piping C 1 Modified subpart 3.1.1.1; added AWWA C515 throughout
Feb-2011 N UFGS 33 11 00 Water Utility Distribution Piping R Deleted all language referring to ABS water service pipe throughout; other minor revisions
Oct-2006 N UFGS 33 11 00 Water Utility Distribution Piping R Adjusted para. 2.1.2.4 Rubber-Seated Butterfly Valves.
Jul-2006 N UFGS 33 11 00 Water Utility Distribution Piping R Added reference to UFGS Section 03 40 00.00 10 Plant-Precast Concrete Products for Below Grade Construction
Feb-2022 N UFGS 33 11 00 Water Utility Distribution Piping C 1 Changes made to incorporate multiple CCRs, including updating lead free and PE Pipe requirements and adding PE tubing.
Nov-2023 N UFGS 33 11 00 Water Utility Distribution Piping C 2 In response to the following CCRs: 13045, updated paragraph reference in first Specifier Note of MATERIALS paragraph (2.1); and 13586, added paragraph Knife Gate Valves (2.1.2.3) and reference AWWA C520
Aug-2017 A UFGS 33 11 13 Potable Water Supply Wells N Superseding UFGS 33 20 00 Water Wells. Complete review and update including section number and and title changes.
Aug-2017 N UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping C 1 Updated to coordinate archiving of Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide , Open Protocol , Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
Nov-2009 N UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping R Removed paragraph 1.2 regarding Y2K, removed Y2K info from SD-07 Certificates and paragraphs 1.7 and 2.1 including note in between
Aug-2008 N UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping N Renumbered; Superseding UFGS 33 11 23.00 20 with same title
Aug-2008 N UFGS 33 11 23.00 20 Natural Gas and Liquid Petroleum Piping D Superseded; Renumbered as UFGS 33 11 23 with no title change
May-2016 F UFGS 33 12 33.00 30 Water Meters C 1 Section retitled from WATER UTILITY METERING
Aug-2008 F UFGS 33 12 33.00 30 Water Meters N New Section
Nov-2011 F UFGS 33 12 33.00 30 Water Meters R Section retitled from WATER METERS
Feb-2020 F UFGS 33 12 33.00 30 Water Meters D Section is no longer needed. All water meter requirements are covered in UFGS 33 11 00 WATER UTILITY DISTRIBUTION PIPING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2007 S UFGS 33 16 13.13 40 Steel Aboveground Water Utility Storage Tanks D Information already provided in UFGS 33 16 15 Water Storage Steel Tanks Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jun-2006 S UFGS 33 16 13.13 40 Steel Aboveground Water Utility Storage Tanks R Title changed from ELEVATED STEEL WATER TANK; Reference and Section References (SRF) updated
Apr-2006 N UFGS 33 16 13.16 Wire-Wound Circular Prestressed-Concrete Water Tank R To conform with CSI MasterFormat, replacing without change UFGS-13208 (August 2004)
Aug-2017 A UFGS 33 16 15 Water Storage Steel Tanks C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Apr-2008 A UFGS 33 16 15 Water Storage Steel Tanks R Compliance with CSI SectionFormat
Oct-2007 A UFGS 33 16 15 Water Storage Steel Tanks R Updated seismic criteria
Nov-2020 A UFGS 33 16 15 Water Storage Steel Tanks R Complete review and update.
Aug-2016 A UFGS 33 20 00 Water Wells C 1 Compliance with plain language requirements.
Apr-2008 A UFGS 33 20 00 Water Wells R Compliance with CSI SectionFormat
Aug-2017 A UFGS 33 20 00 Water Wells D Superseded by UFGS 33 11 13 Potable Water Supply Wells. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2013 N UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells C 1 Modified subparts 2.1.1, 2.2.2, 2.9 and 3.9
Aug-2017 N UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells D Superseded by new unified section UFGS 33 51 39 Monitoring Wells. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 A UFGS 33 24 13 Groundwater Monitoring Wells R Compliance with CSI SectionFormat
Aug-2008 A UFGS 33 24 13 Groundwater Monitoring Wells R Revisions throughout during unification/disassembly of UFGS for MF04 compliance; Title changed from Ground-Water Monitoring Wells
Aug-2017 A UFGS 33 24 13 Groundwater Monitoring Wells D Superseded by new unified section UFGS 33 51 39 Monitoring Wells. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 A UFGS 33 26 00.00 10 Relief Wells R Compliance with CSI SectionFormat

Pages