Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023.
Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023.
History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
May-2020 | A | Aug-2018 | D |
Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023. |
|
Feb-2020 | A | Aug-2018 | C | 2 |
Updated table in paragraph 2.10.5.2.1 in response to CCR 3229. Changed reference to Energy Star to PL-109-58 in response to CCR 3488. Added paragraph 1.4. d. in response to CCR 3489. Updated paragraphs 2.1 and 2.2c in response to CCRs 3490 and 3491. Updated paragraph 2.10.1 in response to CCR 7068. Changed section reference from Section 05 50 13 to Section 08 31 00 in response to CCR 8150. |
Nov-2019 | A | Aug-2018 | C | 1 |
Added bracketed statement to paragraph 2.11.2 in response to CCR 7108. Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. |
Aug-2018 | A | Aug-2018 | R |
Complete review and update including sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
|
Feb-2018 | A | Aug-2010 | C | 6 |
Added pressure test requirements for coils to paragraph 2.12.2. |
Aug-2017 | A | Aug-2010 | C | 5 |
Updated to coordinate archiving of Navy Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities. |
Aug-2015 | A | Aug-2010 | C | 4 |
UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements". |
Aug-2014 | A | Aug-2010 | C | 3 |
Added Energy Star requirements |
Feb-2014 | A | Aug-2010 | C | 2 |
Minimum frame length when Duct Height Greater than 300 mm (12 inches) revised to 127 mm (5 inches) |
May-2013 | A | Aug-2010 | C | 1 |
Added the option for pneumatic or electric damper operator |
Aug-2010 | A | Aug-2010 | R |
Added GEI or SCS certification; allow flexible elastomeric duct liner |
|
Nov-2009 | A | Nov-2009 | R |
Revised Duct Test Holes and Cleaning and Adjusting in response to CCR's |
|
Aug-2009 | A | Aug-2009 | R |
Corrections and revision throughout, plus addition of Navy tailoring |
|
Nov-2008 | A | Nov-2008 | R |
Complete revision of section |
|
Apr-2008 | A | Apr-2008 | R |
Compliance with CSI SectionFormat |
|
Jan-2008 | A | Jan-2008 | R |
Incorporated EPAct05 requirements |
|
Jul-2007 | A | Jul-2007 | R |
Revised seal class A ductwork, registers, outdoor units, filters |
|
Oct-2006 | A | Oct-2006 | R |
Revised in response to CCR's 228, 231 and 232 |
|
Apr-2006 | A | Apr-2006 | R |
Removed information on extractors and fibrous glass ductwork |