USACE ECB 2024-3 Technical Lead for Engineering and Construction Deliverables  

Date: 
05-09-2024
Category: 
Directive & Policy
Status: 
Active

The purpose of this Engineering and Construction Bulletin (ECB) is to reiterate the importance of the Technical Lead (TL) and clarify and reaffirm the roles and responsibilities of the TL.

Note: Attachments A and B are included in the PDF when downloaded.

Final Incorporation: 

ER 1110-2-1150 New Revision (Target Publication Date: TBD)

Page(s): 
6