NASA UFGS Master Specifications (Archived)  

NASA UFGS Master - Posted November 30, 2023

On September 30, 2023, NASA officially withdrew from the Unified Facilities Guide Specifications (UFGS) program. All NASA-specific UFGS sections have been removed from the UFGS Master. The final NASA UFGS Master and individual "40" Sections will remain available on the WBDG.

Please note, a Criteria Change Request (CCR) can no longer be submitted for NASA-specific UFGS Sections.

These documents are available in the following formats:   SpecsIntact (SEC) in compressed ZIP  |   Adobe Acrobat (PDF)  

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Date View
NASA UFGS MASTER   11-01-2023  ZIP
NASA UFGS Table of Contents   11-01-2023  PDF
UFGS 01 45 00.00 40 Quality Control   08-01-2023  PDF |  ZIP
UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells   02-01-2018  PDF |  ZIP
UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements   02-01-2018  PDF |  ZIP
UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems   02-01-2018  PDF |  ZIP
UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems   02-01-2018  PDF |  ZIP
UFGS 09 97 13.00 40 Steel Coatings   11-01-2019  PDF |  ZIP
UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems   08-01-2013  PDF |  ZIP
UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems   11-01-2023  PDF |  ZIP
UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems   11-01-2023  PDF |  ZIP
UFGS 21 22 00.00 40 Clean Agent Fire Extinguishing Systems   11-01-2023  PDF |  ZIP
UFGS 22 07 19.00 40 Plumbing Piping Insulation   02-01-2023  PDF |  ZIP
UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures   05-01-2022  PDF |  ZIP
UFGS 22 15 13.16 40 High-Pressure Compressed-Air Piping and Valves, Stainless   11-01-2017  PDF |  ZIP
UFGS 22 15 14.00 40 General Service Compressed-Air Systems, Low Pressure   11-01-2017  PDF |  ZIP
UFGS 22 66 53.00 40 Laboratory Chemical-Waste and Vent Piping   02-01-2023  PDF |  ZIP
UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment   05-01-2022  PDF |  ZIP
UFGS 23 09 13.34 40 Control Valves, Self-Contained   11-01-2023  PDF |  ZIP
UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC   11-01-2020  PDF |  ZIP
UFGS 23 22 13.35 40 Steam Traps   02-01-2017  PDF |  ZIP
UFGS 23 22 23.00 40 Steam Condensate Pumps   02-01-2023  PDF |  ZIP
UFGS 23 22 25.00 40 Steam Valves   11-01-2017  PDF |  ZIP
UFGS 23 31 13.00 40 Metal Ducts   08-01-2022  PDF |  ZIP
UFGS 23 34 23.00 40 HVAC Power Ventilators   11-01-2023  PDF |  ZIP
UFGS 23 36 00.00 40 Air Terminal Units   08-01-2022  PDF |  ZIP
UFGS 23 37 13.00 40 Diffusers, Registers, and Grills   08-01-2022  PDF |  ZIP
UFGS 23 41 13.00 40 Panel Filters   02-01-2023  PDF |  ZIP
UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units   11-01-2023  PDF |  ZIP
UFGS 23 74 33 Packaged, Outdoor, Heating and Cooling Makeup Air-Conditioners   11-01-2009
UFGS 23 74 33.00 40 Small HVAC Units, Cooling-Only, Recirculating, Split and Unitary for Window and Floor Mounting   11-01-2023  PDF |  ZIP
UFGS 23 82 16.00 40 Air Coils   08-01-2022  PDF |  ZIP
UFGS 23 82 19.00 40 Fan Coil Units   11-01-2023  PDF |  ZIP
UFGS 23 82 23.00 40 Unit Ventilators   05-01-2017  PDF |  ZIP
UFGS 23 82 43.00 40 Electric Duct Heaters   05-01-2017  PDF |  ZIP
UFGS 23 82 46.00 40 Electric Unit Heaters   05-01-2017  PDF |  ZIP
UFGS 26 05 00.00 40 Common Work Results for Electrical   11-01-2020  PDF |  ZIP
UFGS 26 05 26.00 40 Grounding and Bonding for Electrical Systems   08-01-2019  PDF |  ZIP
UFGS 26 05 70.00 40 High-Voltage Overcurrent Protective Devices   05-01-2019  PDF |  ZIP
UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices   08-01-2023  PDF |  ZIP
UFGS 26 09 23.00 40 Lighting Control Devices   08-01-2019  PDF |  ZIP
UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers   05-01-2023  PDF |  ZIP
UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters   08-01-2019  PDF |  ZIP
UFGS 26 23 00.00 40 Switchboards and Switchgear   11-01-2017  PDF |  ZIP
UFGS 26 24 16.00 40 Panelboards   08-01-2019  PDF |  ZIP
UFGS 26 24 19.00 40 Motor-Control Centers   05-01-2019  PDF |  ZIP
UFGS 26 28 21.00 40 Automatic Transfer Switches   08-01-2023  PDF |  ZIP
UFGS 26 35 33.00 40 Power Factor Correction Equipment   08-01-2019  PDF |  ZIP
UFGS 26 52 00.00 40 Emergency Lighting   08-01-2023  PDF |  ZIP
UFGS 26 53 00.00 40 Exit Signs   08-01-2023  PDF |  ZIP
UFGS 26 56 13.00 40 Lighting Poles and Standards   05-01-2023  PDF |  SEC
UFGS 26 56 19.00 40 Roadway Lighting   05-01-2020  PDF |  SEC
UFGS 26 56 36.00 40 Flood Lighting   05-01-2020  PDF |  SEC
UFGS 26 60 13.00 40 Low-Voltage Motors   05-01-2019  PDF |  ZIP
UFGS 27 05 28.36 40 Cable Trays for Communications Systems   08-01-2023  PDF |  ZIP
UFGS 27 13 23.00 40 Communications Optical Backbone Cabling   02-01-2023  PDF |  ZIP
UFGS 27 21 10.00 40 Fiber Optic Data Transmission System   11-01-2020  PDF |  ZIP
UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems   02-01-2017  PDF |  ZIP
UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm   02-01-2023  PDF |  ZIP
UFGS 33 71 01.00 40 Overhead Transmission and Distribution   02-01-2023  PDF |  ZIP
UFGS 33 73 00.00 40 Utility Transformers   05-01-2019  PDF |  ZIP
UFGS 33 77 19.00 40 Medium-Voltage Switch   08-01-2016  PDF |  ZIP
UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses   08-01-2023  PDF |  ZIP
UFGS 40 17 30.00 40 Welding General Piping   02-01-2023  PDF |  ZIP
UFGS 40 18 00.00 40 Vacuum Systems Process Piping   05-01-2017  PDF |  ZIP
UFGS 42 22 00.00 40 Process Chillers and Coolers   05-01-2017  PDF |  ZIP
UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers   08-01-2017  PDF |  ZIP
UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers   08-01-2017  PDF |  ZIP
UFGS 42 23 13.00 40 Process Condensers   08-01-2017  PDF |  ZIP
UFGS 43 41 16.16 40 Vertical Atmospheric Tanks and Vessels   08-01-2017  PDF |  ZIP