UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PAsort descending UFGS Section Action Change # Nature of Change or Revision
May-2011 N UFGS 07 41 13 Metal Roof Panels R Reference update: modified General Note and subparts 1.2.1 and 2.2
May-2011 N UFGS 07 42 13 Metal Wall Panels R Reference update: modified subparts 2.2.3.6 and 2.5.4.2
Feb-2016 N UFGS 05 51 33 Metal Ladders R Revised to incorporate the addition of ladder safety device requirement and editorial changes.
Feb-2016 N UFGS 06 20 00 Finish Carpentry R Complete revision; revised throughout to incorporate ccrs 2803, 1484,and 2424; update format and editorial changes.
Feb-2018 N UFGS 23 84 16.00 20 Desiccant Dehumidification Equipment D Superseded by new UFGS Section 23 84 19.00 DESICCANT COOLING SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2018 N UFGS 33 11 00 Water Utility Distribution Piping R Complete revision of this section
Feb-2018 N UFGS 35 59 13.14 20 Polymeric Piles R Section revised to address rapid changes and advancements in the composite industry. Title changed from POLYMERIC FENDER PILES.
Feb-2018 N UFGS 01 35 26 Governmental Safety Requirements C 6 In response to CCR 5966, Note in para 1.6.1 has been updated to include Hawaii; in response to CCR 6077, item "e" under para 3.7.1 "Scaffolding" has been corrected.
Feb-2018 N UFGS 05 51 33 Metal Ladders C 2 Incorporated the changes from the final rule 29 CFR 1910 (Nov 2016) affecting phasing out cages installed on fixed ladders
Feb-2018 N UFGS 07 14 00 Fluid-Applied Waterproofing C 2 In response to CCR 5945
Feb-2018 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 3 In response to CCR 2219 reference for recycled materials added.
Feb-2018 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 3 In response to CCRs 2225, 2226, 2227, and 2228
Feb-2018 N UFGS 07 42 13 Metal Wall Panels C 2 In response to CCR 3731
Feb-2018 N UFGS 07 42 63 Fabricated Wall Panel Assemblies C 3 In response to CCRs 1529 and 3187
Feb-2018 N UFGS 08 56 46.20 20 Radio Frequency Shielded Enclosures, Welded Type C 1 In response to CCR 1700
Feb-2018 N UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers C 1 In response to CCRs 2409 and 3191
Feb-2018 N UFGS 11 05 40 Common Work Results for Foodservice Equipment C 2 In response to CCR 3364
Feb-2018 N UFGS 13 34 19 Metal Building Systems C 2 In response to CCRs 1904 and 4945
Feb-2018 N UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter C 2 Changes were made to align with manufacturers standard products.
Feb-2016 N UFGS 07 12 00 Built-Up Bituminous Waterproofing R Complete revision; revised throughout to incorporate CCR 3686 ; update format and editorial changes.
Feb-2016 N UFGS 07 13 53 Elastomeric Sheet Waterproofing R Complete revision; revised throughout to incorporate CCRs 3687, 3463; update format and editorial changes.
Feb-2016 N UFGS 07 17 00 Bentonite Waterproofing R Complete revision; revised throughout to incorporate CCRs 2803, 1484,and 2424; update format and editorial changes.
Feb-2016 N UFGS 07 21 13 Board and Block Insulation R Complete revision; revised throughout to incorporate CCRs 2820, 3234; update format and editorial changes.
Feb-2016 N UFGS 07 22 00 Roof and Deck Insulation R Complete revision; revised throughout to incorporate CCRs 4254, 2807; update format and editorial changes.
Feb-2016 N UFGS 07 92 00 Joint Sealants R Complete revision; revised throughout to incorporate CCRs 2376 and 3692 update format and editorial changes
Feb-2016 N UFGS 08 71 00 Door Hardware R Complete revision; revised throughout to incorporate CCRs 4818, 1613, 3999, 2450, 2451, 2762, 1612, 3384, and 3386; update format and editorial changes
Feb-2016 N UFGS 09 97 13.27 High Performance Coating for Steel Structures R This spec is a complete revision to reflect a new and different product. The spec was modified to move from Epoxy/ Polyurethane MIL Spec products to low VOC polysulfide modified novolac epoxy. Updates to QA/QC procedures and reporting requirements were also added.
Feb-2016 N UFGS 11 41 11 Refrigerated and Frozen Food Storage Equipment R Complete revision; updated format and editorial changes.
Feb-2016 N UFGS 11 42 00 Food Preparation Equipment R Complete revision; updated format and editorial changes.
Feb-2016 N UFGS 13 21 26 Cold-Storage Rooms (Prefabricated Panel Type) R Complete revision; updated format and editorial changes
Feb-2016 N UFGS 23 82 00.00 20 Terminal Heating Units R Revised throughout to incorporate CCRs 1734, 4179, 4406 and 4716. Title changed from TERMINAL HEATING AND COOLING UNITS. Modifications included, references, infrared heaters and electrical work.
Feb-2016 N UFGS 31 31 16.19 Termite Control Barriers R Section and title revised to combine UFGS 31 31 16.19 (was) MESH TERMITE CONTROL BARRIER SYSTEM and UFGS 31 31 16.20 BASALTIC TERMITE BARRIER and UFGS 31 31 16.21 MESH TERMITE BARRIER (deleted February 2015) to reduce specifications containing similar content and updated to reflect current criteria format.
Feb-2016 N UFGS 31 31 16.20 Basaltic Termite Barrier D Superseded by UFGS 31 31 16.19 Termite Control Barriers Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2016 N UFGS 32 01 13.63 Gilsonite Modified Asphalt Emulsion Seal Coats N New UFGS Section
Feb-2016 N UFGS 01 14 00 Work Restrictions C 3 Added requirement for utility cutover and connection to existing sanitary sewer line.
Feb-2016 N UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System C 1 Change to clarify that vendor products named are pretested for specification compliance. These and additional vendors and products may be submitted for review of compliance with test results in accordance with this specification; editorial updates.
Nov-2015 N UFGS 01 35 26 Governmental Safety Requirements R Updated to EM 385-1-1 (NOV 2014) requirements and terms including clarifying requirements for Dive Protection, Fall Protection, Load Handling Equipment, and Electrical. Added Subcontractor Safety requirements for Navy only.
Nov-2015 N UFGS 01 57 19 Temporary Environmental Controls N Unification of the following sections and update to current requirements: 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS, 01 57 20.00 10 ENVIRONMENTAL PROTECTION, 01 57 23 TEMPORARY STORMWATER POLLUTION CONTROL, and 01 57 16 TEMPORARY PEST CONTROL
Nov-2015 N UFGS 01 57 19.00 20 Temporary Environmental Controls D Superseded by UFGS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2015 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls R Unification with UFGS 01 57 19.02 TEMPORARY ENVIRONMENTAL CONTROLS (GTMO), coordination with UFGS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS, and update of regional requirements.
Nov-2015 N UFGS 01 57 19.02 Temporary Environmental Controls (GTMO) D Superseded by UFGS 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2015 N UFGS 22 00 00 Plumbing, General Purpose R Revised throughout to incorporate CCRs 1605, 2764, 2765, 2832, 3301, 3391, 3891, 4118, 4159, 4209, 4411, and 4437. Modifications included references, plumbing system testing, performance of gas storage-type water heaters and requirements for the following products: drinking-water coolers and floor sinks.
Nov-2015 N UFGS 23 05 93 Testing, Adjusting, and Balancing for HVAC R Revised throughout to incorporate CCRs 290, 840, 1224, 2713, 3697, 4315, 4416, 4426, 4430, 4433 and 4480. Modifications included administrative changes to correct tailoring option and submittal register, submittals, quality assurance, instrument calibration certificates, DALT procedures, TAB procedures, work descriptions of participants, and DALT and TAB reports.
Feb-2018 N UFGS 26 35 44.00 20 270 VDC Solid State Ground Power Unit N New UFGS required for supporting new aircraft types.
Feb-2018 N UFGS 32 13 13.43 High Temperature Concrete Paving for Airfields Using Lightweight and Traprock Aggregates N New UFGS Section
Nov-2015 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC R Revised throughout to incorporate numerous modifications. Modifications included references, definitions, control system components list, BACnet communication architecture schematic, submittals, DDC system, BACnet building controller, stand-alone controllers, internal clock, communications ports, digital controller cabinet, programming, trending, device management, BACnet operator workstation, notebook computer, software, BACnet discovery tool, energy metering, actuators, power line surge protection, variable frequency (motor) drives, BACnet naming and addressing, BACnet routers and protocol gateways, and performance verification testing plan.
Nov-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays.
Nov-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays
Nov-2015 N UFGS 01 33 29 Sustainability Requirements and Reporting C 1 Alignment with sustainable policies.
Nov-2015 N UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System C 1 Deleted paragraph 2.1.3 MECHANICAL PIPE COUPLING SYSTEM and subparagraphs 2.1.3.1, 2.1.3.2, 2.1.3.3
Nov-2015 N UFGS 33 05 23 Trenchless Utility Installation C 1 Removed reference to UFGS Section 33 01 30.16 in subpart 3.5.3, as this section is not yet published
Nov-2015 N UFGS 33 47 13 Pond and Reservoir Liners C 2 Recommended changes from NAVFAC SE regarding revised notes, to use of imperative language and miscellaneous items as submitted via CCR 4563.
Aug-2015 N UFGS 01 11 00 Summary of Work R Revised throughout. Removed Project Environmental Goals covered under UFGS 01 33 29 Sustainability Reporting.
Aug-2015 N UFGS 01 30 00 Administrative Requirements R Revised throughout.
Aug-2015 N UFGS 01 78 23 Operation and Maintenance Data R Revised throughout. Coordinated thoroughly with UFGS 01 78 24.00 20 Facility eOMSI and UFGS 01 78 00 Closeout Submittals. Updated training requirements and O&M Manual electronic format.
Aug-2015 N UFGS 08 01 52 Operation and Maintenance of Wood Windows R Superseding UFGS 08 52 70 Wood Windows - Repair and Rehabilitation; Nontechnical number and title revision; Did not change Section date.
Feb-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules R Title changed from CONSTRUCTION PROGRESS DOCUMENTATION; thoroughly revised Schedule Format, Schedule Monthly Updates, and Contract Modification.
Feb-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Title changed from NETWORK ANALYSIS SCHEDULES (NAS); thoroughly revised to Primavera P6, Updated WBS & Activity Codes and Settings.
Feb-2015 N UFGS 01 33 29 Sustainability Requirements and Reporting R Title changed from SUSTAINABILITY REQUIREMENTS to comply with CSI MasterFormat; Coordination with criteria and corrections throughout section.
Feb-2015 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) R Deleted eOMSI manual for Primary Systems; incorporated requirements into other manuals. Coordinated FACILITY INFORMATION in this section with Section 01 78 23. Updated Record Drawing.
Feb-2015 N UFGS 33 71 02 Underground Electrical Distribution R The UFGS has been revised through-out. Modifications include updates to references and clarifications of requirements and applications of materials and methods relating to: conduits, conductors, certificates, faulted circuit indicators, fireproofing, handholes, grounding, and duct-banks.
Feb-2015 N UFGS 01 45 00.00 20 Quality Control C 1 Updated to conform to the DOD Special Inspection requirements defined in spec 01 45 35; Added Special Inspections requirements and removed references to LEED.
Feb-2015 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 2 Modified subpart 3.1.1.3
Feb-2015 N UFGS 01 78 23 Operation and Maintenance Data C 3 Added Safety Hazards, Operating Log, Extended Warranty and Field Test Reports to O&M DATA PACKAGES. Coordinated with UFGS 01 78 24.00 20 Facility eOMSI .
Feb-2015 N UFGS 03 30 00 Cast-In-Place Concrete C 1 Completion of Criteria Change Request.
Feb-2015 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC C 1 Completion of Criteria Change Request.
Feb-2015 N UFGS 23 82 00.00 20 Terminal Heating Units C 1 Completion of Criteria Change Request .
Feb-2015 N UFGS 26 08 00 Apparatus Inspection and Testing C 1 Modified subpart 3.1 e.
Feb-2015 N UFGS 33 47 13 Pond and Reservoir Liners C 1 Reference update; added subparts 2.1.3, 2.1.4, 2.1.5, and 2.1.6; technical updates to subparts 3.3, 3.6, 3.7.1.2.1, and 3.7.1.2.2
Nov-2014 N UFGS 01 33 29 Sustainability Requirements and Reporting N New section superseding previous UFGS 01 33 29 titled LEED Documentation and superseding UFGS 01 33 29.00 20 Sustainable Requirements
Nov-2014 N UFGS 01 33 29.00 20 Sustainable Requirements D Superseded by UFGS 01 33 29 Sustainability Requirements. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 N UFGS 01 35 40.00 20 Environmental Management D Superseded by UFGS 01 57 19.00 20 Temporary Environmental Controls. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 N UFGS 26 13 00 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear N Superseding UGFS 26 13 00.00 20 SF6/High- Firepoint Fluids Insulated Pad-Mounted Switchgear
Nov-2014 N UFGS 26 13 00.00 20 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear D Superseded by UFGS 26 13 00 with no title change. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 2 Incorporation of eCMS Transmittal function into Table 1.
May-2018 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 1 Change incorporates minor corrections and coordinates the use of Non-mineral insulating oil.
May-2018 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Combined with Design-Build Section 01 32 17.05 20. Updated Activity Identification and Organization, Design Activities, and Time Impact Analysis. Added Commissioning Activities.
May-2018 N UFGS 03 01 30.71 Concrete Rehabilitation D Superseded by Section 03 01 00 REHABILITATION OF CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 N UFGS 32 11 16.13 Sand-Clay [Base] [Subbase] Course D Outdated specification; No longer used. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 N UFGS 32 11 16.16 [Base Course for Rigid] [and Subbase Course for Flexible] [Subbase Course for Pervious] Paving D Superseded by Section 32 11 20 [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 N UFGS 32 11 24 Graded Crushed Aggregate Base Course for [Pervious] [Flexible] Pavement D Superseded by Section 32 11 20 [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 N UFGS 32 11 26.16 Bituminous Concrete Base Course D Outdated specification; No longer used. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 N UFGS 32 12 17 Hot Mix Bituminous Pavement D Superseded by Section 32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 N UFGS 26 32 26 Motor-Generator Sets, 400 Hertz (HZ) D Retired; Section technology is outdated. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 N UFGS 26 35 46.00 20 Radio Frequency Interference Power Line Filters D Out of date, rarely used, can't keep up with technology changes. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 N UFGS 28 26 23 Duress Signal System (for Brig Facilities) D Out of date, rarely used, can't keep up with technology changes. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 N UFGS 28 40 01 Watchtour System (for Brig Facilities) D Out of date, rarely used, can't keep up with technology changes. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 N UFGS 33 47 13 Pond and Reservoir Liners R Added and updated references in Subpart 1.1 References, added section on warranties (1.5.1), Revised text and deleted table in in Section 2.1.3, revised text in sections 3.7.1 and 3.7.2
Nov-2014 N UFGS 33 81 27 Pier Telephone Distribution Systems D Out of date, rarely used, can't keep up with technology changes. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 N UFGS 40 95 33.23 20 Fiber Optic (FO) Outside Plant (OSP) Media D Previously incorporated into UFGS 33 82 00 Telecommunications Outside Plant (OSP). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2010 N UFGS 01 20 00.00 20 Price and Payment Procedures R 1.3.2 Title change and paragraph change
Feb-2010 N UFGS 01 30 00 Administrative Requirements R Minor revision to paragraphs 1.10 and 1.11
Feb-2010 N UFGS 01 33 29 Sustainability Requirements and Reporting R Section References (SRF) update and other minor revisions.
Feb-2010 N UFGS 01 35 26 Governmental Safety Requirements R Section References (SRF) update
Feb-2010 N UFGS 01 35 40.00 20 Environmental Management R Section References (SRF) update
Feb-2010 N UFGS 01 45 00.00 20 Quality Control N New section; Supersedes UFGS 01 45 02 NAVFAC Quality Control
Feb-2010 N UFGS 01 45 00.10 20 Quality Control for Minor Construction N New section; Supersedes UFGS 01 45 02.10 NAVFAC Quality Control for Minor Construction
Feb-2010 N UFGS 01 45 02 NAVFAC Quality Control D Superseded by UFGS 01 45 00.00 20 Quality Control Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2010 N UFGS 01 45 02.10 NAVFAC Quality Control for Minor Construction D Superseded by UFGS 01 45 00.10 20 Quality Control for Minor Construction Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2010 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Section References (SRF) update; fixed General Note; minor revisions