UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS)  

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2019 N C 2

Updated section to include the required Oracle Primavera P6 software settings to be utilized in preparation and maintenance of the construction schedule and the tabular reports required to be submitted with each monthly invoice.

Nov-2018 N C 1

Corrected notes and paragraphs, for DB and DBB, on Baseline NAS submittals and requirements.

May-2018 N R

Combined with Design-Build Section 01 32 17.05 20. Updated Activity Identification and Organization, Design Activities, and Time Impact Analysis. Added Commissioning Activities.

Nov-2015 N C 2

Revised the Time Impact Analysis (TIA) action for Concurrent Delays

May-2015 N C 1

Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.

Feb-2015 N R

Title changed from NETWORK ANALYSIS SCHEDULES (NAS); thoroughly revised to Primavera P6, Updated WBS & Activity Codes and Settings.

Nov-2012 S C 1

Modified subparts 1.4 and 1.4 to add Primavera P6

Aug-2010 N R

Revised first note in subpart 1.6.2.5

Dec-2009 N R

INTERIM RELEASE: Section revised

Nov-2009 N R

Major revision

Nov-2008 N R

Deleted requirements for WEBCM

Jan-2007 N R

Deleted [DESIGN BUILD] from the title and Design-Build requirements from the section.