Building Metered Data Analysis |
Continuing Education |
Electrical - New Hospitals / Replacement Hospitals / Ambulatory Care / Clinical Additions / Energy Centers / Outpatient Clinics/ Animal Research Facilities / Laboratory Buildings |
Federal Facility Criteria (FFC) |
GS-31 Electric Chillers |
Federal Facility Criteria (FFC) |
Metering Benefits and Federal Drivers |
Continuing Education |
TSEWG TP-16 Impressed Current Anode Material Selection and Design Considerations |
Federal Facility Criteria (FFC) |
TSEWG TP-17 Galvanic (Sacrificial) Anode Material Selection, Design Considerations |
Federal Facility Criteria (FFC) |
TSEWG TP-18 Frequently Asked Questions About Cathodic Protection System Equipment Testing |
Federal Facility Criteria (FFC) |
TSEWG TP-19 Static Uninterruptible Power Supply (UPS) |
Federal Facility Criteria (FFC) |
UFC 3-570-01 Cathodic Protection, with Change 1 |
Federal Facility Criteria (FFC) |
UFC 3-580-10 Navy And Marine Corps Intranet (NMCI) Standard Construction Practices, Replaced by UFC 3-580-01 |
Federal Facility Criteria (FFC) |
Using Metered Data to Improve Energy and Water Efficiency |
Continuing Education |