Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated November 4, 2022; Posted November 17, 2022

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master complies with UFC 1-300-02. SpecsIntact supports the UFGS format. SpecsIntact can still open Masters or Jobs created with older versions of the UFGS format.

Updated UFGS are posted quarterly in February, May, August, and November.

SpecsIntact version 4.5.0 and above incorporates Automatic Paragraph Numbering. Versions of Specsintact older than 4.5.0 are not compatible with this feature. Existing jobs can be converted to the new automatic numbered format. The conversion is a one-way process. To convert, select the job or master, select process menu, choose convert Job/Master to Automatic numbering. More information about Automatic Paragraph Numbering is available on the SpecsIntact website.

For Specsintact Technical Support: 321-867-8800  |   E-mail  |   specsintact.ksc.nasa.gov

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, "30" by AFCEC, and "40" by NASA. The order of precedence for selecting UFGS sections for a project is generally:

  1. Regional UFGS if required by the contract or published on WBDG
  2. Single-agency UFGS for whom project is being developed
  3. Unified UFGS
  4. UFGS identified as specific to another DoD Service (for DoD projects only)

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

Section templates for UFGS: These templates are provided to assist the user in creating a new section and available in SpecsIntact.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request (CCR). To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   Adobe Acrobat (PDF)  |   SpecsIntact (SEC) in compressed ZIP

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Datesort descending View CCR
UFGS 23 37 13.00 40 Diffusers, Registers, and Grills   08-01-2022  PDF |  ZIP  CCR
UFGS 01 57 19 Temporary Environmental Controls   08-01-2022  PDF |  ZIP  CCR
UFGS 31 31 16.13 Chemical Termite Control   08-01-2022  PDF |  ZIP  CCR
UFGS 31 31 16.19 Termite Control Barriers   08-01-2022  PDF |  ZIP  CCR
UFGS 23 82 16.00 40 Air Coils   08-01-2022  PDF |  ZIP  CCR
UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems   08-01-2022  PDF |  ZIP  CCR
UFGS 26 28 00.00 10 Motor Control Centers, Switchboards and Panelboards   08-01-2022  PDF |  ZIP  CCR
UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications   08-01-2022  PDF |  ZIP  CCR
Unified Master Reference List (UMRL)   10-01-2022  PDF
Division 33 - Utilities   11-01-2022  ZIP
Division 08 - Openings   11-01-2022  ZIP
Division 34 - Transportation   11-01-2022  ZIP
Division 09 - Finishes   11-01-2022  ZIP
Division 35 - Waterway and Marine Construction   11-01-2022  ZIP
UFGS 02 65 00 Underground Storage Tank Removal   11-01-2022  PDF |  ZIP  CCR
Division 10 - Specialties   11-01-2022  ZIP
Division 40 - Process Integration   11-01-2022  ZIP
UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury   11-01-2022  PDF |  ZIP  CCR
Division 11 - Equipment   11-01-2022  ZIP
Division 41 - Material Processing and Handling Equipment   11-01-2022  ZIP
UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs)   11-01-2022  PDF |  ZIP  CCR
Division 12 - Furnishings   11-01-2022  ZIP
Division 42 - Process Heating, Cooling and Drying Equipment   11-01-2022  ZIP
Division 13 - Special Construction   11-01-2022  ZIP
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment   11-01-2022  ZIP
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley   11-01-2022  PDF |  ZIP  CCR
Division 14 - Conveying Equipment   11-01-2022  ZIP
UFGS 31 71 19 Tunnel and Shaft Excavation in Rock - Mechanical   11-01-2022  PDF |  ZIP  CCR
Division 44 - Pollution and Waste Control Equipment   11-01-2022  ZIP
UFGS 44 10 00 Air Pollution Control   11-01-2022  PDF |  ZIP  CCR
Division 21 - Fire Suppression   11-01-2022  ZIP
Division 22 - Plumbing   11-01-2022  ZIP
Division 46 - Water and Wastewater Equipment   11-01-2022  ZIP
UFGS Forms, Graphics, and Tables   11-01-2022
Division 00 - Procurement and Contracting Requirements   11-01-2022  ZIP
Division 23 - Heating, Ventilating, and Air Conditioning   11-01-2022  ZIP
Division 48 - Electrical Power Generation   11-01-2022  ZIP
UFGS 08 34 49.00 20 Hemp Shielded Door   11-01-2022  PDF |  ZIP  CCR
Division 01 - General Requirements   11-01-2022  ZIP
UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults   11-01-2022  PDF |  ZIP  CCR
Division 25 - Integrated Automation   11-01-2022  ZIP
UFGS 08 71 63.10 Electrical Locking Control for Brigs   11-01-2022  PDF |  ZIP  CCR
UFGS 01 14 00 Work Restrictions   11-01-2022  PDF |  ZIP  CCR
Division 02 - Existing Conditions   11-01-2022  ZIP
Division 26 - Electrical   11-01-2022  ZIP
UFGS 32 01 16.71 Cold Milling Asphalt Paving   11-01-2022  PDF |  ZIP  CCR
UFGS Table of Contents   11-01-2022  PDF
UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements   11-01-2022  PDF |  ZIP  CCR
UFGS Complete   11-01-2022  PDF
Division 03 - Concrete   11-01-2022  ZIP
Division 27 - Communications   11-01-2022  ZIP
UFGS 26 08 00 Apparatus Inspection and Testing   11-01-2022  PDF |  ZIP  CCR
Division 04 - Masonry   11-01-2022  ZIP
UFGS 33 56 19 Fuel Impermeable Liner System   11-01-2022  PDF |  ZIP  CCR
Division 28 - Electronic Safety and Security   11-01-2022  ZIP
UFGS Changes and Revisions   11-01-2022
UFGS 26 12 21 Single-Phase Pad-Mounted Transformers   11-01-2022  PDF |  ZIP  CCR
UFGS 26 05 19.00 10 Insulated Wire and Cable   11-01-2022  PDF |  ZIP  CCR
Division 05 - Metals   11-01-2022  ZIP
Division 31 - Earthwork   11-01-2022  ZIP
UFGS 26 29 01.00 10 Electric Motors, 3-Phase Vertical Induction Type   11-01-2022  PDF |  ZIP  CCR
Division 06 - Wood, Plastics and Composites   11-01-2022  ZIP
Division 32 - Exterior Improvements   11-01-2022  ZIP
UFGS 26 29 02.00 10 Electric Motors, 3-Phase Vertical Synchronous Type   11-01-2022  PDF |  ZIP  CCR
Division 07 - Thermal and Moisture Protection   11-01-2022  ZIP
UFGS 32 13 15.20 Concrete Pavement for Fuel Storage Containment Dikes   11-02-2022  PDF |  ZIP  CCR
UFGS MASTER   11-17-2022  ZIP

Pages