Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated February 19, 2020; Posted February 27, 2020

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master uses the latest CSI MasterFormat, therefore, as of January 2012, the UFGS Working Group decided to discontinue support of MasterFormat 1995. SpecsIntact version 4.5.1 and above will support MasterFormat 2010 and will no longer support the creation of Jobs or Masters using the old MasterFormat 1995 UFGS Master. For backward compatibility, Masters or Jobs created with older versions can still be opened using the latest software versions.

As of June 2008 :Updated UFGS will be posted quarterly in February, May, August and November.

As of May 2013: The May 2013 release incorporates Automatic Paragraph Numbering. Versions of Specsintact older than 4.5.0 are not compatible with this feature. Existing jobs can be converted to the new automatic numbered format. The conversion is a one-way process. To convert, select the job or master, select process menu, choose convert Job/Master to Automatic numbering. More information about Automatic Paragraph Numbering is available on the SpecsIntact website.

For Specsintact Technical Support: 321-867-8800  |   E-mail  |   specsintact.ksc.nasa.gov

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 MasterFormat™ number. UFGS that are agency-specific have a fifth level number indicating it as an agency specific specification. A specification that has a fifth level number "10" indicates USACE, a "20" indicates NAVFAC, a "30" indicates AFCEC, and a "40" indicates NASA. Preparing agencies are indicated in the UFGS header of each specification. The user should follow this order of precedence in selecting UFGS sections:

  1. Regional UFGS specific to their Agency
  2. UFGS identified as specific to their Agency
  3. Unified UFGS if one is available
  4. UFGS identified as specific to another DoD Agency (for DoD projects only)
  5. UFGS from another agency.

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

Section templates for MasterFormat 2010 and MasterFormat 1995: These templates are provided to assist the user in creating a new section.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request. To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   Adobe Acrobat (PDF)  |   SpecsIntact (SEC) in compressed ZIP

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Datesort descending View CCR
UFGS 02 83 00 Lead Remediation   11-01-2018  PDF |  ZIP  CCR
UFGS 02 85 00 Mold Remediation   11-01-2018  PDF |  ZIP  CCR
UFGS 32 12 15.16 Stone Matrix Asphalt (SMA) for Airfield Paving   02-01-2019  PDF |  ZIP  CCR
UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines)   02-01-2019  PDF |  ZIP  CCR
UFGS 01 42 00 Sources for Reference Publications   02-01-2019  PDF |  ZIP  CCR
UFGS 03 30 00 Cast-In-Place Concrete   02-01-2019  PDF |  ZIP  CCR
UFGS 21 13 25 High-Expansion Foam System, Fire Protection   02-01-2019  PDF |  ZIP  CCR
UFGS 03 31 29 Marine Concrete with Service Life Modeling   02-01-2019  PDF |  ZIP  CCR
UFGS 23 09 00 Instrumentation and Control for HVAC   02-01-2019  PDF |  SEC  CCR
UFGS 01 91 00.15 Total Building Commissioning   02-01-2019  PDF |  ZIP  CCR
UFGS 26 56 20 Airfield and Heliport Lighting and Visual Navigation Aids   02-01-2019  PDF |  ZIP  CCR
UFGS 03 31 30 Marine Concrete   02-01-2019  PDF |  ZIP  CCR
UFGS 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other Building Control Systems   02-01-2019  PDF |  ZIP  CCR
UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems   02-01-2019  PDF |  ZIP  CCR
UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration   02-01-2019  PDF |  ZIP  CCR
UFGS 01 74 19 Construction Waste Management and Disposal   02-01-2019  PDF |  ZIP  CCR
UFGS 01 78 00 Closeout Submittals   05-01-2019  PDF |  ZIP  CCR
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks   05-01-2019  PDF |  ZIP  CCR
UFGS 08 81 00 Glazing   05-01-2019  PDF |  ZIP  CCR
UFGS 26 24 19.00 40 Motor-Control Centers   05-01-2019  PDF |  ZIP  CCR
UFGS 26 05 70.00 40 High-Voltage Overcurrent Protective Devices   05-01-2019  PDF |  ZIP  CCR
UFGS 33 71 01 Overhead Transmission and Distribution   05-01-2019  PDF |  ZIP  CCR
UFGS 08 44 00 Curtain Wall and Glazed Assemblies   05-01-2019  PDF |  ZIP  CCR
UFGS 08 51 13 Aluminum Windows   05-01-2019  PDF |  ZIP  CCR
UFGS 33 73 00.00 40 Utility Transformers   05-01-2019  PDF |  ZIP  CCR
UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers   05-01-2019  PDF |  ZIP  CCR
UFGS 01 91 00.15 10 Total Building Commissioning   05-01-2019  PDF |  ZIP  CCR
UFGS 26 60 13.00 40 Low-Voltage Motors   05-01-2019  PDF |  ZIP  CCR
UFGS 26 33 53 Static Uninterruptible Power Supply (UPS)   05-01-2019  PDF |  ZIP  CCR
UFGS 26 05 00.00 40 Common Work Results for Electrical   08-01-2019  PDF |  ZIP  CCR
UFGS 26 05 26.00 40 Grounding and Bonding for Electrical Systems   08-01-2019  PDF |  ZIP  CCR
UFGS 26 09 23.00 40 Lighting Control Devices   08-01-2019  PDF |  ZIP  CCR
UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters   08-01-2019  PDF |  ZIP  CCR
UFGS 26 20 00 Interior Distribution System   08-01-2019  PDF |  ZIP  CCR
UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements   08-01-2019  PDF |  ZIP  CCR
UFGS 26 24 16.00 40 Panelboards   08-01-2019  PDF |  ZIP  CCR
UFGS 26 35 33.00 40 Power Factor Correction Equipment   08-01-2019  PDF |  ZIP  CCR
UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness   08-01-2019  PDF |  ZIP  CCR
UFGS 07 27 10.00 10 Building Air Barrier System   08-01-2019  PDF |  ZIP  CCR
UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant)   08-01-2019  PDF |  ZIP  CCR
UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines   08-01-2019  PDF |  ZIP  CCR
UFGS 01 58 00 Project Identification   08-01-2019  PDF |  ZIP  CCR
UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations   11-01-2019  PDF |  ZIP  CCR
UFGS 32 13 73.19 Compression Concrete Paving Joint Sealant   11-01-2019  PDF |  ZIP  CCR
UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running   11-01-2019  PDF |  ZIP  CCR
UFGS 32 14 13.13 Interlocking Precast Concrete Unit Paving   11-01-2019  PDF |  ZIP  CCR
UFGS 34 73 16 Airfield Grounding   11-01-2019  PDF |  ZIP  CCR
UFGS 32 12 16.19 Cold-Mix Asphalt Paving   11-01-2019  PDF |  ZIP  CCR
UFGS 02 42 51 Carpet Removal and Reclamation   11-01-2019  PDF |  ZIP  CCR
UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.)   11-01-2019  PDF |  ZIP  CCR
UFGS 09 23 82 Fireproof Gypsum Plastering   11-01-2019  PDF |  ZIP  CCR
UFGS 05 14 00.13 Welding Structural Aluminum Framing   11-01-2019  PDF |  ZIP  CCR
UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers   11-01-2019  PDF |  ZIP  CCR
UFGS 09 67 23.13 Standard Resinous Flooring   11-01-2019  PDF |  ZIP  CCR
UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames   11-01-2019  PDF |  ZIP  CCR
UFGS 09 97 13.00 40 Steel Coatings   11-01-2019  PDF |  ZIP  CCR
UFGS 08 33 23 Overhead Coiling Doors   11-01-2019  PDF |  ZIP  CCR
UFGS 10 44 16 Fire Extinguishers   11-01-2019  PDF |  ZIP  CCR
UFGS 08 34 73 Sound Control Door Assemblies   11-01-2019  PDF |  ZIP  CCR
UFGS 40 95 00 Process Control   11-01-2019  PDF |  ZIP  CCR
UFGS 31 63 29 Drilled Concrete Piers and Shafts   11-01-2019  PDF |  ZIP  CCR
UFGS 34 73 13 Aircraft Tiedowns   11-01-2019  PDF |  ZIP  CCR
UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement   11-01-2019  PDF |  ZIP  CCR
UFGS 32 11 36.13 Lean Concrete Base Course   11-01-2019  PDF |  ZIP  CCR
UFGS 32 11 13.13 Lime Treated Subgrade   11-01-2019  PDF |  ZIP  CCR
UFGS 33 05 23.13 Utility Horizontal Directional Drilling   11-01-2019  PDF |  ZIP  CCR
UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses   11-01-2019  PDF |  ZIP  CCR
Unified Master Reference List (UMRL)   01-01-2020  PDF
Division 41 - Material Processing and Handling Equipment   02-01-2020  ZIP
UFGS 46 23 00 Grit Removal and Handling Equipment   02-01-2020  PDF |  ZIP  CCR
Division 12 - Furnishings   02-01-2020  ZIP
Division 42 - Process Heating, Cooling and Drying Equipment   02-01-2020  ZIP
UFGS 32 31 26 Wire Fences and Gates   02-01-2020  PDF |  ZIP  CCR
Division 13 - Special Construction   02-01-2020  ZIP
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment   02-01-2020  ZIP
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running   02-01-2020  PDF |  ZIP  CCR
UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates   02-01-2020  PDF |  ZIP  CCR
Division 14 - Conveying Equipment   02-01-2020  ZIP
Division 44 - Pollution and Waste Control Equipment   02-01-2020  ZIP
Division 21 - Fire Suppression   02-01-2020  ZIP
Division 46 - Water and Wastewater Equipment   02-01-2020  ZIP
UFGS Forms, Graphics, and Tables   02-01-2020
UFGS Complete   02-01-2020  PDF
Division 00 - Procurement and Contracting Requirements   02-01-2020  ZIP
UFGS 32 32 23.13 Segmental Concrete Block Retaining Wall   02-01-2020  PDF |  ZIP  CCR
Division 22 - Plumbing   02-01-2020  ZIP
Division 23 - Heating, Ventilating, and Air Conditioning   02-01-2020  ZIP
Division 48 - Electrical Power Generation   02-01-2020  ZIP
Division 01 - General Requirements   02-01-2020  ZIP
UFGS 33 01 50.31 Leak Detection For Fueling Systems   02-01-2020  PDF |  ZIP  CCR
Division 25 - Integrated Automation   02-01-2020  ZIP
Division 02 - Existing Conditions   02-01-2020  ZIP
UFGS 23 75 15 Custom-Packaged, Aircraft Pre-Conditioned Air Units   02-01-2020  PDF |  ZIP  CCR
Division 26 - Electrical   02-01-2020  ZIP
UFGS Table of Contents   02-01-2020  PDF
Division 03 - Concrete   02-01-2020  ZIP
UFGS 23 81 29 Variable Refrigerant Flow HVAC Systems   02-01-2020  PDF |  ZIP CCR
Division 27 - Communications   02-01-2020  ZIP
Division 04 - Masonry   02-01-2020  ZIP
UFGS 46 07 53 Packaged Wastewater Treatment Equipment   02-01-2020  PDF |  ZIP  CCR

Pages