UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
Aug-2012 N UFGS 05 40 00 Cold-Formed Metal Framing C 1 Modified subparts 1.2 (SD-07), 1.3, 1.6, 2.1, 2.1.1, 2.1.2, 3.2; removed 2.4 "Paint"
Aug-2012 S UFGS 05 52 00 Metal Railings C 1 Updated Imperative Language; no technical content changes have been made
Aug-2012 S UFGS 26 60 13.00 40 Low-Voltage Motors C 1 Minor changes; no technical content changes have been made
Aug-2012 A UFGS 33 30 00 Sanitary Sewerage C 1 Added provisions to allow polypropylene pipe
Aug-2012 A UFGS 33 40 00 Stormwater Utilities C 1 Per CCR 1438, changed AASHTO M 198 to ASTM C990
Aug-2017 S UFGS 01 33 00 Submittal Procedures C 10 Updated to coordinate archiving of Navy Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a "Department-wide, Open Protocol, Energy Monitoring and Utility Control System Specification" for use in military construction and military family housing activities.: Changed MSDS to SDS
Aug-2017 N UFGS 01 33 29 Sustainability Requirements and Reporting C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Aug-2017 N UFGS 09 97 13.25 Maintenance, Repair, and Coating of Tall Antenna Towers C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Nov-2016 S UFGS 01 33 00 Submittal Procedures C 9 Replaced 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) with 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) in Subpart 1.9 SUBMITTAL REGISTER AND DATABASE.
Nov-2016 N UFGS 01 35 26 Governmental Safety Requirements C 3 In paragraph "Fall Protection for Roofing Work", item b. Steep-Sloped Roofs, changed slope from "4:1" to "4:12".
Nov-2016 N UFGS 07 31 13 Asphalt Shingles C 1 In response to CCR #5002, added reference to ASTM D7158/D7158M for Class H roof in paragraph 2.2.1 "Shingles."
Nov-2016 A UFGS 09 65 00 Resilient Flooring C 2 In response to CCR 4916, Luxury Vinyl Tile added.
Nov-2016 N UFGS 09 97 23.17 Corrosion Inhibitor Coating of Concrete Structures C 1 Paragraphs "Penetrating Vapor Phase Corrosion Inhibitor" and "Surface Sealant' were revised to correct the product technical descriptions.
Nov-2016 S UFGS 12 31 00 Manufactured Metal Casework C 2 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.8 COLOR, TEXTURE, AND PATTERN.
Nov-2016 S UFGS 12 34 00 Manufactured Plastic Casework C 2 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern.
Nov-2016 S UFGS 12 36 00 Countertops C 1 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern.
Nov-2016 S UFGS 12 48 13 Entrance Floor Mats and Frames C 3 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.4 COLOR AND SIZE.
Nov-2016 N UFGS 26 51 00 Interior Lighting C 1 Changed LED light fixtures, light sources and drivers to a 5 year warranty to meet current industry standards.
Nov-2016 A UFGS 31 11 00 Clearing and Grubbing C 1 Added herbicide requirements.
Nov-2016 A UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements C 1 Clarified sandblasting requirements.
May-2016 N UFGS 05 30 00 Steel Decks C 1 Revised text in subpart 3.9.3 and relocated applicable Specifier Note below subpart 3.9.3 title.
Aug-2015 A UFGS 01 78 00 Closeout Submittals C 2 Adjusted Operation and Maintenance Manual requirements. Deleted Preventive Maintenance and list of installed equipment requirements.
Aug-2015 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 Changes coordinated with section 01 78 23 revision. Moved training and O&M Manual format to 01 78 23. Added resolutions in event of discrepancies in provided FDW, and unsuccessful Field Verification.
Aug-2015 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 07 21 23 Loose Fill Thermal Insulation C 3 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 S UFGS 08 34 73 Sound Control Door Assemblies C 1 CCR #4297, Subpart 3.3, changed FSTC to ASTC
Aug-2015 N UFGS 08 44 00 Curtain Wall and Glazed Assemblies C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 51 13 Aluminum Windows C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 51 23 Steel Windows C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 52 00 Wood Windows C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 53 00 Plastic Windows C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 81 00 Glazing C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 11 72 13 Medical Equipment, Miscellaneous C 1 CCR 4172: removed reference ASTM A167, withdrawn with no replacement
Aug-2015 N UFGS 11 74 00 Dental Equipment C 1 CCR 4173: removed reference ASTM A167, withdrawn with no replacement
Aug-2015 N UFGS 13 17 43 Hydrotherapy Equipment C 1 CCR 4174: removed reference ASTM A167, withdrawn with no replacement
Aug-2015 N UFGS 22 00 00 Plumbing, General Purpose C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 4 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 09 53.00 20 Space Temperature Control Systems C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 23 52 00 Heating Boilers C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers (Under 800,000 BTU/HR Output) C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output) C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 49.00 20 Steam Boilers and Equipment (500,000 - 18,000,000 BTU/HR) C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 53.00 20 Steam Boilers and Equipment (18,000,000 - 60,000,000 BTU/HR) C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 54 19 Building Heating Systems, Warm Air C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 64 00 Packaged Water Chillers, Absorption Type C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 64 10 Water Chillers, Vapor Compression Type C 3 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 3 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 69 00.00 20 Refrigeration Equipment for Cold Storage C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 23 71 19 Thermal Energy Storage System: Ice-On-Coil C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 76 00.00 20 Evaporative Cooling System C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 81 23.00 20 Computer Room Air Conditioning Units C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 82 00.00 20 Terminal Heating Units C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 31 23 00.00 20 Excavation and Fill C 2 In response to CCR 4371: reference update
Nov-2014 N UFGS 31 62 19 Timber Piles C 2 Changed Section Reference 00 41 00 BID SCHEDULES to Section Reference 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
Feb-2014 A UFGS 23 09 23 LonWorks Direct Digital Control for HVAC and Other Building Control Systems C 1 QC Checklist in APPENDIX A made available in electronic format for use with this section at: http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf
May-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 1 Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.
May-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.
May-2015 S UFGS 01 33 00 Submittal Procedures C 6 Subpart 1.2.1, under SD-11, deleted the mention of DD Form 1354; Subpart 1.4.7, corrected typo, changed tittle to Sustainability Reporting Submittals (S), revised the 1st and 2nd paragraph ; added Sub[art 1.6.10, 1.6.10.1 and 1.6.11; Subpart 1.11.1, revised paragraph; added paragraph "j." to Subpart 1.11.3; Subpart 1.13, added the word "Contract" prior to the word clause, entitled "Changes.".
May-2015 A UFGS 01 45 00.00 10 Quality Control C 1 Add requirements to coordinate with Section 01 45 35 SPECIAL INSPECTIONS
May-2015 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 CCR 4158: Updated Fencing Paragraph a. to height requirements in EM 385-1-1.
May-2015 A UFGS 01 74 19 Construction Waste Management and Disposal C 2 Revised required diversion to 60%
May-2015 A UFGS 01 78 00 Closeout Submittals C 1 Incorporates multiple approved CCRs.
May-2015 N UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control C 1 CCR 985 and CCR 2715: Revised technical note in subpart 1.4.5 by deleting UFC 3-450-02 and replacing P-355 with UFC 3-310-04. Revised technical note in subparts 1.4.6, 1.4.6.2, and Part 2 by replacing DM 3.10 with UFC 3-450-01.
May-2015 N UFGS 23 22 26.00 20 Steam System and Terminal Units C 1 CCR 2840 - removed technical note in subpart 2.6
May-2015 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 2 Modified subparts 2.2.2, 2.2.2.4, 2.6.3, and 3.1.4.4 to show grooved connections are not used on NAVFAC projects.
May-2013 N UFGS 05 21 23 Steel Joist Girder Framing C 1 modified subpart 2.2.1
Nov-2012 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC C 2 Submittal Article compliance; minor revisions
Aug-2012 S UFGS 01 75 00 Starting and Adjusting C 1 Updated Imperative Language and minor changes; no technical content changes have been made
Aug-2012 A UFGS 08 33 13 Coiling Counter Doors C 1 Updated paragraph LOCKS
Aug-2012 N UFGS 08 34 16.20 Vertical Lift Fabric Doors C 1 Modified subparts 1.4.1, 1.5.1, 1.5.3; document was released 7/12
Aug-2012 N UFGS 08 81 00 Glazing C 1 Modified subpart 2.4.8
Aug-2012 S UFGS 12 36 00 Countertops C 1 Updated Imperative Language and minor changes; no technical content changes have been made
Aug-2012 S UFGS 12 48 13.13 Entrance Floor Mats C 1 Updated Imperative Language and minor changes; no technical content changes have been made
Aug-2012 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC C 1 Updated Imperative Language, cleaning up the Submittal Article; and minor changes; no technical content changes have been made
Aug-2012 S UFGS 23 22 23.00 40 Steam Condensate Pumps C 1 Updated Imperative Language, cleaning up the Submittal Article; and minor changes; no technical content changes have been made
Aug-2012 S UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment C 1 Per CCR 1798, subpart 2.1 - revised Chapter No, per CCR 589 made some changes to the "headings" in the tables due to comment in CCR in the following subparts: 2.2.1 - 2.2.6, 2.2.9 - 2.2.11
Aug-2012 A UFGS 26 41 01.00 10 Lightning Protection System C 1 Per CCR 1748, changed "counterpoise" to "ground ring"
Aug-2012 N UFGS 35 59 13.14 20 Polymeric Piles C 1 Modified subparts: 1.3, 2.1, 2.4, 2.4.1 and 2.4.2
Aug-2012 N UFGS 35 59 13.16 Extruded and Molded Marine Fenders C 1 Modified subparts 2.3.1, 2.3.3, 2.3.3.1, 2.3.4.2, 2.3.4.3, 2.3.6, 2.3.6.4, 3.3
Aug-2018 A UFGS 01 91 00.15 Building Commissioning C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 01 74 19 Construction Waste Management and Disposal C 3 Revised submittal classifications in response to CCR 6535.
Aug-2018 A UFGS 03 23 00 Stressed Tendon Reinforcing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 06 61 16 Solid Surfacing Fabrications C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 07 54 19 Polyvinyl Chloride Roofing C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 24 23 Cement Stucco C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 35 16 Chemical-Resistant Quarry Tiling C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 51 00 Acoustical Ceilings C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 62 38 Static-Control Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Pages