UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Sectionsort descending Action Change # Nature of Change or Revision
Feb-2010 S UFGS 01 45 04 NASA Quality Control D Section renamed; Superseded by UFGS 01 45 00.00 40 Quality Control Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2008 S UFGS 01 45 04 NASA Quality Control N Superseding 01 45 00.00 40 Quality Control
Aug-2008 S UFGS 01 45 04 NASA Quality Control R Notification of CCR Filing
Jan-2008 A UFGS 01 45 04.00 10 Contractor Quality Control D Superseded by UFGS 01 45 01 USACE Quality Control Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2015 A UFGS 01 45 35 Special Inspections R Complete Section review and refresh.
Nov-2012 A UFGS 01 45 35 Special Inspections C 1 Section title change only; formerly SPECIAL INSPECTION FOR SEISMIC- RESISTING SYSTEMS
Aug-2008 A UFGS 01 45 35 Special Inspections R Compliance with CSI SectionFormat
Oct-2007 A UFGS 01 45 35 Special Inspections R Updated seismic criteria
Feb-2020 N UFGS 01 45 35 Special Inspections R Section has been unified and merged with Navy DB RFP Division 1 Specifications to ensure that the Division 1 specs for DB and DBB are aligned, current, and compatible with USACE and NAVFAC. PA changed from Army to NAVFAC.
Nov-2020 N UFGS 01 45 35 Special Inspections R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Feb-2016 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 3 Added provision for dumpsters tailored to NAVFAC SE
Aug-2009 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Revised USACE Project Sign requirements
May-2018 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Complete review and update.
Aug-2014 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Moved execution requirements to Part 3 as noted in CCR 3562
May-2015 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 CCR 4158: Updated Fencing Paragraph a. to height requirements in EM 385-1-1.
Oct-2007 A UFGS 01 50 00 Temporary Construction Facilities and Controls N Superseding UFGS 01 50 00.00 20 Temporary Facilities and Controls, UFGS 01 50 00.00 40 Temporary Facilities and Controls, and UFGS 01 50 02.00 10 Temporary Construction Facilities
Feb-2019 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Corrected spelling errors in paragraphs 2.3.1 and 2.3.2 and deleted out of place measurements below paragraph 2.3.3 in response to CCR 7090.
Aug-2019 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 Added tailoring option and editor's note to paragraph 3.6 in response to CCR 7602. Added reference tags and corrected character spacing in paragraph 1.5 in response to CCR 7624.
May-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 3 Added cybersecurity requirements during construction, paragraph 1.6, in response to CCR 7450.
Aug-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 4 Added notes for NAVFAC PAC requirements to paragraphs 1.2 and 2.2.1 in response to CCR 8831.
Nov-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Revised to include NAVFAC Design-Build Division 01 tailoring options and CCRs.
Aug-2021 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Added Note to Submittal Article with instructions for Navy Design-Build projects.
Aug-2022 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 Incorporated CCRs 10035, 10883, and 10885.
Oct-2007 N UFGS 01 50 00.00 20 Temporary Facilities and Controls D Superseded by UFGS 01 50 00 Temporary Construction Facilities and Controls. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Oct-2007 S UFGS 01 50 00.00 40 Temporary Facilities and Controls D Superseded by UFGS 01 50 00 Temporary Construction Facilities and Controls. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Oct-2007 A UFGS 01 50 02.00 10 Temporary Construction Facilities D Superseded by UFGS 01 50 00 Temporary Construction Facilities and Controls. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2015 A UFGS 01 57 16 Temporary Pest Control D Superseded by UFGS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2008 A UFGS 01 57 16 Temporary Pest Control N New section
Apr-2008 A UFGS 01 57 16 Temporary Pest Control R Compliance with CSI SectionFormat
Aug-2016 N UFGS 01 57 19 Temporary Environmental Controls C 1 Fixed bracketed items and tailoring.
Nov-2015 N UFGS 01 57 19 Temporary Environmental Controls N Unification of the following sections and update to current requirements: 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS, 01 57 20.00 10 ENVIRONMENTAL PROTECTION, 01 57 23 TEMPORARY STORMWATER POLLUTION CONTROL, and 01 57 16 TEMPORARY PEST CONTROL
May-2019 N UFGS 01 57 19 Temporary Environmental Controls C 2 In response to CCR 7194, FAR clause 52.242-14 Suspension of Work was added to the paragraph "Non-Compliance Notifications"; updated links per CCRs 7375 and 7376
Aug-2019 N UFGS 01 57 19 Temporary Environmental Controls C 3 In response to the following CCRs: #5233 - revised language in paragraph "Dust Control" (3.5.7) to reflect the Crystalline Silica hazard associated with cement and concrete products per the new OSHA Standard of Crystalline Silica; #5733 - "Stormwater Pollution Prevention Plan" has been added as a submittal item under SD-01 and in paragraph "Stormwater Pollution Prevention Plan" (3.2.1.1); #7178 - revision to clarify submittal item "Solid Waste Management Report", updated as "Monthly Solid Waste Disposal Report" in Part 1 (1.11.1) and "Project Solid Waste Disposal Documentation Report" in Part 3 (3.7.2.1) and in the Submittal Article under SD-06 and SD-11 respectively; #7179 - added a new row "C&D Debris Composted" to table under paragraph Nonhazardous Solid Waste Diversion Report (3.6.2)
Aug-2020 N UFGS 01 57 19 Temporary Environmental Controls C 4 In response to CCR 8832, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and paragraph "ENVIRONMENTAL PROTECTION PLAN" (1.7); under paragraphs "Stormwater Pollution Prevention Plan" (3.2.1.1) and "Stormwater Notice of Intent for Construction Activities" (3.2.1.2) added note and text.
Aug-2021 N UFGS 01 57 19 Temporary Environmental Controls C 5 Added Note to Submittal Article with instructions for Navy Design-Build projects. In response to CCR 10213, updated requirements for NAVFAC PAC DB and DBB in Environmental Protection Plan paragraph.
Aug-2022 N UFGS 01 57 19 Temporary Environmental Controls R Revised to align with current industry standards and DoD requirements. This Section supersedes UFGS-01 57 19.00 20 Supplemental Temporary Environmental Controls as all requirements are contained within this Tri-Service, tailorable specification as reorganized paragraphs in a hierarchical presentation.
Nov-2015 N UFGS 01 57 19.00 20 Temporary Environmental Controls D Superseded by UFGS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2015 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 2 Modified subpart 3.1.1.3
Feb-2010 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Section References (SRF) update; fixed General Note; minor revisions
Feb-2009 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Revised 1.4.1
Jan-2008 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Changes made throughout; compliments UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls
Apr-2008 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Minor revisions throughout
Aug-2013 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 1 Modified throughout. Correctly classified Universal Waste and Asbestos material, removed tailoring from ECATTS paragraph, changed Environmental Management Plan to Environmental Protection Plan throughout and moved to Part 1.
Aug-2008 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Corrected hyperlink to NAVFAC Drawings
Nov-2008 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Revised requirements for ECATTS training, para 1.41
Nov-2011 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Added note in subpart 3.4.2.1
Jul-2006 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Thoroughly revised on many issues
Aug-2016 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Changed NAVFAC NW Installation's notes, and related information, for Hazardous Waste Management.
Nov-2015 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls R Unification with UFGS 01 57 19.02 TEMPORARY ENVIRONMENTAL CONTROLS (GTMO), coordination with UFGS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS, and update of regional requirements.
Feb-2010 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls R Section References (SRF) update; fixed General Note; minor revisions
Jan-2008 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls N New section; for use with UFGS 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS on Navy projects.
May-2014 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 3 Modified subpart 3.1.1.1
Feb-2014 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 2 Modified note before Part 1, Part 1, subparts 1.3, 1.4.1, 1.4.1.2,1.4.1.2.2, 1.4.1.3, 1.4.1.4, 1.4.1.5, 1.4.1.6.1, 1.4.1.6.6, 1.4.1.7, 1.6.5.2.1 and 1.6.5.2.2
Aug-2013 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Added requirements for NAVFAC NW, including Definitions and Part 3 paragraphs.
Aug-2008 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls R Corrected Submittal (SUB) Tags
May-2020 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 2 In response to CCR 8507, Section has been updated to capture the requirements for surplus soil disposal at Camp Lejeune, NC (1.4.6.1.2).
Aug-2020 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 3 Additional change made regarding CCR 8507, the section has been updated to clarify requirements for surplus soil disposal at Camp Lejenue (1.4.6.1.2). In response to CCR 8833, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under SD-01 and in paragraph "Notice of Construction (NOC) and Notice of Completion" (1.5.3.6).
May-2021 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 4 In response to CCR 9422, subparagraph (1.4.6.1.1) Removal of Waste from Camp Lejeune has been updated to reflect the landfill waste policy at Camp Lejeune.
Aug-2021 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 5 Added Note to Submittal Article with instructions for Navy Design-Build projects.
Aug-2022 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls D Superseded by UFGS 01 5719 Temporary Environmental Controls Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2008 N UFGS 01 57 19.01 Temporary Environmental Controls (GITMO) D Renumbered to UFGS 01 57 19.02 with no title change Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2015 N UFGS 01 57 19.02 Temporary Environmental Controls (GTMO) D Superseded by UFGS 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2008 N UFGS 01 57 19.02 Temporary Environmental Controls (GTMO) N Renumbered from UFGS 01 57 19.01 with no title change
Nov-2015 A UFGS 01 57 20.00 10 Environmental Protection D Superseded by UFGS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2015 A UFGS 01 57 23 Temporary Storm Water Pollution Control D Superseded by UFGS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2008 A UFGS 01 57 23 Temporary Storm Water Pollution Control N Superseding UFGS 01 57 23.00 10 STORM WATER POLLUTION PREVENTION MEASURES
Apr-2008 A UFGS 01 57 23 Temporary Storm Water Pollution Control R Compliance with CSI SectionFormat
Jan-2008 A UFGS 01 57 23.00 10 Storm Water Pollution Prevention Measures D Superseded by UFGS 01 57 23 Temporary Storm Water Pollution Control Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2009 N UFGS 01 58 00 Project Identification R Minor revisions
Jan-2008 N UFGS 01 58 00 Project Identification R Added requirements for Facility Recognition Plaque
Apr-2008 N UFGS 01 58 00 Project Identification R Updated Project Sign requirements
Aug-2008 N UFGS 01 58 00 Project Identification R Corrected URL hyperlinks
Jan-2007 N UFGS 01 58 00 Project Identification R Revised link to NAVFAC logo
Aug-2019 N UFGS 01 58 00 Project Identification R Complete review and update
Aug-2020 N UFGS 01 58 00 Project Identification C 1 In response to CCR 8950, revised Specifier Note in paragraph Quality Control (1.3) for additional guidance.
Nov-2020 N UFGS 01 58 00 Project Identification C 2 [Update 3/18/21: per CCR# 9845, reference to ARRA has been removed from the sign details in all Related Materials.] Updated both the Specifier Note under PROJECT IDENTIFICATION SIGN (1.4) and the Related Materials (PDF/ZIP attachments)
Nov-2021 N UFGS 01 58 00 Project Identification C 3 In response to CCR 9882, instructions have been added for Air Force projects on Guam, on both Navy installation with NAVFAC execution and Army installation with USACE execution. Also, clarified Air Force instruction in the first Note in the Project Identification Signboard paragraph.
Feb-2022 N UFGS 01 58 00 Project Identification C In reference to CCR 11189, Project Sign Details (PDF and zip files) found under Related Materials have been updated. Classified as a clerical change.
May-2022 N UFGS 01 58 00 Project Identification C 4 Per CCR 11078, updated Construction Project Signs paragraph (1.4.3) tailored for ARMY and AIR FORCE to address project identification signs for Air Force projects managed by USACE.
Aug-2022 N UFGS 01 58 00 Project Identification C 5 In response to CCR 11903, corrected placement of tailoring tags and updated specifier notes throughout.
Jul-2007 S UFGS 01 60 00.00 40 Product Requirements D Redundant, section deleted. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2015 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials D Superseded by UFGS 01 33 29 SUSTAINABILITY REPORTING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials C 1 Additional biobased materials language
May-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials R Revised Section Title from RECYCLED / RECOVERED MATERIALS. Also, added Biopreferred Fed
Jul-2006 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials N New - Superseding UFGS 00 62 35 Recycled / Recovered Materials
Apr-2006 N UFGS 01 73 19 Installation of Government-Furnished Medical Equipment R To conform with CSI MasterFormat, replacing without change UFGS-11708 (August 2004)
May-2020 N UFGS 01 73 19 Installation of Government-Furnished Medical Equipment D Superseded by UFGS 11 70 00 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 A UFGS 01 74 19 Construction Waste Management and Disposal C 1 Replaced section reference 01 35 40.00 20 with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.
May-2015 A UFGS 01 74 19 Construction Waste Management and Disposal C 2 Revised required diversion to 60%
Aug-2018 A UFGS 01 74 19 Construction Waste Management and Disposal C 3 Revised submittal classifications in response to CCR 6535.
Jan-2007 A UFGS 01 74 19 Construction Waste Management and Disposal R Added sustainable design language
Jul-2006 A UFGS 01 74 19 Construction Waste Management and Disposal N New - Superseding UFGS 02 42 00 Construction and Demolition Waste Management
Feb-2019 A UFGS 01 74 19 Construction Waste Management and Disposal R Complete review and update including section title change from CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT to CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.
Aug-2020 A UFGS 01 74 19 Construction Waste Management and Disposal C 1 Updated last paragraph of designer's note and specification text in subpart 1.5 in response to CCR 9043. Added notes for NAVFAC PAC requirements in subparts 1.5 and 1.7, and updated text in first paragraph of subpart 1.7 in response to CCR 8834. Deleted tailoring options in subparts 1.3 and 1.4.3 in response to CCR 8911. Added tailoring options to submittal SD-06 in response to CCR 8912. Updated designer's note referring to Third Party Certification in subpart 1.7 in response to CCR 8913. Added tailoring options in subparts 1.6 and 1.7, and deleted first designer's note in subpart 1.7 in response to CCR 8914.
Aug-2021 A UFGS 01 74 19 Construction Waste Management and Disposal C 2 Added Note to Submittal Article with instructions for Navy Design-Build projects. Incorporated CCRs that support certain Navy Facilities Engineering Commands.
Nov-2021 A UFGS 01 74 19 Construction Waste Management and Disposal C 3 Required to align with NAVFAC regional fidelity, and to fix administrative issues, per two CCRs.
May-2015 S UFGS 01 75 00 Starting and Adjusting D NASA reclassified this as fifth level; Renumbered/ Superseded by UFGS 01 75 00.00 40 with no title change. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2012 S UFGS 01 75 00 Starting and Adjusting R Tri-Annual Database Maintenance
Aug-2012 S UFGS 01 75 00 Starting and Adjusting C 1 Updated Imperative Language and minor changes; no technical content changes have been made
Oct-2006 S UFGS 01 75 00 Starting and Adjusting N Renumbered/Superseding UFGS 01 75 00.00 40 Starting and Adjusting; Added Submittals

Pages