UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Aug-2018 A UFGS 10 14 00.20 Interior Signage C 1 Added bracketed item to paragraph 1.4.1 in response to CCR 6638.
Aug-2018 A UFGS 10 21 13 Toilet Compartments C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 10 22 13 Wire Mesh Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 22 19 Demountable and Moveable Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 10 22 26.13 Accordion Folding Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 10 22 26.23 Coiling Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 22 39 Folding Panel Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 22 43 Sliding Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 26 00 Wall and Door Protection C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 28 13 Toilet Accessories C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 24 27 Air Stripper D Superseded by UFGS 02 62 13.00 10 AIR AND STEAM STRIPPING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2018 N UFGS 11 31 13 Electric Kitchen Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 44 00 Food Cooking Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 47 00 Ice Machines C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 11 48 00 Cleaning and Disposal Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 68 13 Playground Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 21 00 Window Blinds C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 12 22 00 Curtains and Drapes C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 24 13 Roller Window Shades C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 35 39 Commercial Kitchen Casework C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 35 70 Healthcare Casework C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 S UFGS 12 36 00 Countertops C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 59 00 Systems Furniture C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 61 13 Upholstered Audience Seating C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 93 00 Site Furnishings C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 13 21 26 Cold-Storage Rooms (Prefabricated Panel Type) C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 22 00 00 Plumbing, General Purpose C 3 Changing Tech Notes for the following from not allowing the use of press fittings/press connections for Navy projects to coordinating with the user on the use of press fittings/press connections for copper pipe and tube for Navy and Marine Corps projects: Paragraph 2.2.1-t, Pipe Joint Materials, Press Fittings for Copper Pipe and Tube; Paragraph 3.1.3.6-d, Copper Tube and Pipe, Press Connection and; Table II Item 38, Pipe and Fitting Materials for Pressure Piping Systems, Press Fittings; Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 22 00 70 Plumbing for Healthcare Facilities C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems R Complete review and update including sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 23 09 00 Instrumentation and Control for HVAC C 2 Corrected tailoring tags in response to CCR 6663.
Aug-2018 N UFGS 23 35 19.00 20 Industrial Ventilation and Exhaust C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 23 52 00 Heating Boilers C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers (Under 800,000 BTU/HR Output) C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output) C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 49.00 20 Steam Boilers and Equipment (500,000 - 18,000,000 BTU/HR) C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 52 53.00 20 Steam Boilers and Equipment (18,000,000 - 60,000,000 BTU/HR) C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 54 19 Building Heating Systems, Warm Air C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 64 00 Packaged Water Chillers, Absorption Type C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 64 10 Water Chillers, Vapor Compression Type C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 69 00.00 20 Refrigeration Equipment for Cold Storage C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 76 00.00 20 Evaporative Cooling System C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 81 23.00 20 Computer Room Air Conditioning Units C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 23 82 00.00 20 Terminal Heating Units C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 26 11 13.00 20 Primary Unit Substation C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 F UFGS 26 27 13.10 30 Electric Meters C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 26 32 13.00 20 Single Operation Generator Sets R Revised to incorporate environmental updates to meet 40 CFR 112 requirements and to update spec format.
Aug-2018 N UFGS 26 33 53.00 20 Uninterruptible Power Supply (UPS) C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 26 55 80 Surgical, Procedure and Exam Lighting Fixtures C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 26 56 00 Exterior Lighting C 1 Statements added to specify LED compatible photocell when used with LED light fixtures; Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 32 17 23 Pavement Markings C 4 Incorporated changes based on directions of the NDAA.
Aug-2018 A UFGS 33 01 50.01 Cleaning Fuel Storage Tanks D Cancelled and replaced by existing UFGS 33 65 00 CLEANING PETROLEUM STORAGE TANKS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2018 N UFGS 33 05 16 Concrete Poles D Concrete poles are covered in UFGS 03 45 33 PRECAST[ PRESTRESSED] STRUCTURAL CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2018 A UFGS 33 08 53 Aviation Fuel Distribution System Start-Up R Complete review and update.
Aug-2018 A UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) R Complete review and update.
Aug-2018 A UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) R Complete review and update.
Aug-2018 A UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks) R Complete review and update.
Aug-2018 A UFGS 33 31 23.00 10 Sanitary Sewer Force Main Piping N Superseding UFGS 33 34 00 FORCE MAINS AND INVERTED SIPHONS; SEWER. Complete review and update including section number and title changes.
Aug-2018 A UFGS 33 34 00 Force Mains and Inverted Siphons; Sewer D Superseded by UFGS 33 31 23.00 10 SANITARY SEWER FORCE MAIN PIPING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2018 A UFGS 33 34 13 Siphons, Dosing D Superseded by UFGS 33 34 56.00 10 DRAINAGE FIELD DOSING CHAMBERS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2018 A UFGS 33 34 56.00 10 Drainage Field Dosing Chambers N Superseding UFGS 33 34 13 SIPHONS, DOSING. Complete review and update including section number and title changes.
Aug-2018 A UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment R Complete review and update.
Aug-2018 A UFGS 33 52 43.12 Aviation Fuel Pantographs R Complete review and update.
Aug-2018 A UFGS 33 52 43.13 Aviation Fuel Piping R Complete review and update.
Aug-2018 A UFGS 33 52 43.14 Aviation Fuel Control Valves R Complete review and update.
Aug-2018 A UFGS 33 52 43.23 Aviation Fuel Pumps R Complete review and update.
Aug-2018 A UFGS 33 52 43.28 Filter Separator, Aviation Fueling System R Complete review and update.
Aug-2018 N UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method R This specification was updated and revised to current industry best practices, standards, guidelines, codes, and specifications.
Aug-2018 A UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures N New UFGS section.
Aug-2018 A UFGS 43 31 13.13 10 Activated Carbon-Gas and Liquid Purification Filters N Superseding UFGS 43 31 13.14 DOWNFLOW LIQUID ACTIVATED CARBON ADSORPTION UNITS. Complete review and update including section number and title changes.
Aug-2018 A UFGS 43 31 13.14 Downflow Liquid Activated Carbon Adsorption Units D Superseded by UFGS 43 31 13.13 10 ACTIVATED CARBON-GAS AND LIQUID PURIFICATION FILTERS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 2 Incorporation of eCMS Transmittal function into Table 1.
May-2018 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Combined with Design-Build Section 01 32 17.05 20. Updated Activity Identification and Organization, Design Activities, and Time Impact Analysis. Added Commissioning Activities.
May-2018 A UFGS 01 35 45.00 10 Chemical Data Quality Control D Section is outdated and no longer used. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Complete review and update.
May-2018 A UFGS 01 78 24.00 10 Facility Data Requirements R Complete review and update to incorporate feedback received from previous project.
May-2018 N UFGS 03 01 30.71 Concrete Rehabilitation D Superseded by Section 03 01 00 REHABILITATION OF CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 A UFGS 05 59 13 Fabrication of Hydraulic Steel Structures C 1 Changes were made in order to ensure proper reference to updated ASTM Standards including ASTM A709 and ASTM F3125. Additionally the new AISC HYD certification for the fabrication of Hydraulic Steel Structures was added.
May-2018 S UFGS 05 72 00 Decorative Metal Specialties R Tri-Annual Database Maintenance (TADM) completed
May-2018 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Tri-Annual Database Maintenance (TADM) completed
May-2018 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating R Tri-Annual Database Maintenance (TADM) completed
May-2018 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Tri-Annual Database Maintenance (TADM) completed
May-2018 A UFGS 13 48 00 [Seismic ]Bracing for Miscellaneous Equipment R Complete review and update including section title, was SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT.
May-2018 A UFGS 13 48 00.00 10 Seismic Protection for Mechanical Equipment D Superseded by UFGS 23 05 48.19 [SEISMIC] BRACING FOR HVAC. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2018 N UFGS 14 21 13 Electric Traction Freight Elevators C 1 Specification changed to allow for machine room elevators and machine room less elevators.
May-2018 N UFGS 14 21 23 Electric Traction Passenger Elevators C 1 Specification changed to allow for machine room elevators and machine room less elevators.
May-2018 N UFGS 14 24 13 Hydraulic Freight Elevators C 1 Specification changed to allow for machine room elevators and machine room less elevators.
May-2018 N UFGS 14 24 23 Hydraulic Passenger Elevators C 1 Specification changed to allow for machine room elevators and machine room less elevators.
May-2018 A UFGS 23 05 48.19 [Seismic] Bracing for HVAC N Superseding UFGS 13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT. Complete review and update including section number and title changes.
May-2018 A UFGS 23 71 19 Thermal Energy Storage System: Ice-On-Coil R Complete review and update.

Pages