UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
May-2017 N UFGS 31 31 16.19 Termite Control Barriers C 1 Changes made to include a note for Air Force to use Chemical Termite Control and deleting reference to ASTM C289 in response to CCR 4978.
May-2017 A UFGS 32 01 29.62 Concrete Pavement Raising C 1 In response to CCR 2107, changed section title for compliance to the MasterFormat 2011 update.
May-2017 A UFGS 32 17 23 Pavement Markings C 2 In response to CCR 5549, removed "Gradation A" from Type III beads.
May-2017 S UFGS 32 31 13 Chain Link Fences and Gates C 1 Incorporated CCR 4487, revised paragraphs 2.2.15, and 2.2.17
May-2017 N UFGS 32 84 24 Irrigation Sprinkler Systems C 1 Changes made to address CCRs 5293, 5294, 5305, 5306, and 5307
May-2017 A UFGS 33 40 00 Stormwater Utilities C 5 Added requirements for field quality control.
May-2017 A UFGS 34 71 13.16 Vehicle Crash Barriers C 1 In response to CCR 4568, updated references and incorporated minor changes.
Feb-2017 N UFGS 01 35 26 Governmental Safety Requirements C 4 Added crane requirements for Critical Lift Plan, Barge Mounted, and Base Mounted Drum Hoists from NAVFAC P-307 that were not in EM 385-1-1. For Navy, added requirement of accident investigation reporting within 5 days of mishaps and 10 days of accidents.
Feb-2017 A UFGS 01 91 00.15 Building Commissioning C 1 In response to CCR 5173, added two "S" submittals in SD-11.
Feb-2017 N UFGS 02 83 13.00 20 Lead in Construction C 1 CCR 5279: updated paragraph 1.5.2.2 Lead Compliance Plan.
Feb-2017 N UFGS 07 22 00 Roof and Deck Insulation C 1 CCR 5475: Changed terminology within this section from “Protection Board” to “Cover Board”.
Feb-2017 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC C 1 BACnet Operator Workstation (B-OWS) updated to BACnet Advanced Operator Workstation (B-AWS) in 2.1.6.2-[BACnet Operator Workstation][and][Notebook Computer] DDC Software.
Feb-2017 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 4 Updated Technical Note in 2.2.2-Fittings and End Connections (Joints)
Feb-2017 A UFGS 32 17 23 Pavement Markings C 1 In response to CCR 5270, changed "Waterborne Paint" to "Reflective Media for Airfields" in SD-07.
Feb-2017 N UFGS 32 93 00 Exterior Plants C 2 CCR 4981: References to ASTM D5203 and ASTM D5852 have been removed from this Section.
Feb-2017 S UFGS 33 71 01.00 40 Overhead Transmission and Distribution C 1 Changed 3 tailoring tags; corrected minor discrepancies
Aug-2016 N UFGS 01 35 26 Governmental Safety Requirements C 2 Changed requirements for portable ionizing radiation equipment.
Aug-2016 A UFGS 01 45 00.10 10 Quality Control System (QCS) C 1 Update minimum QCS System Requirements, compliance with plain language requirements.
Aug-2016 N UFGS 01 57 19 Temporary Environmental Controls C 1 Fixed bracketed items and tailoring.
Aug-2016 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Changed NAVFAC NW Installation's notes, and related information, for Hazardous Waste Management.
Aug-2016 N UFGS 32 01 13.63 Gilsonite Modified Asphalt Emulsion Seal Coats C 1 Proprietary language has been removed from this specification.
Aug-2016 N UFGS 33 01 30.72 Relining Sewers C 1 Added section references referring to UFGS Section 33 01 30.16 TV Inspection of Sewer Pipelines
Aug-2016 N UFGS 33 05 23 Trenchless Utility Installation C 2 Added section references referring to UFGS Section 33 01 30.16 TV Inspection of Sewer Pipelines
Aug-2016 A UFGS 33 20 00 Water Wells C 1 Compliance with plain language requirements.
May-2016 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors C 2 Administrative, revised use of "The Contractor" and "shall"
May-2016 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects C 2 Added requirement for restrictions on Radio Transmitter Equipment previously located in Section 01 57 19.02.
May-2016 N UFGS 01 20 00.00 20 Price and Payment Procedures C 1 Updated invoice form numbers and DFARS clause for submission of Invoices.
May-2016 S UFGS 01 33 00 Submittal Procedures C 8 Revised the following three subparts, 1.4.1, 1.4.3, 1.11.4, due to releasing Section 01 33 16.00 10 DESIGN DATA [DESIGN AFTER AWARDS] for use on USACE Design-Build projects only.
May-2016 N UFGS 01 35 26 Governmental Safety Requirements C 1 Modified OSHA Form 300 and 300A requirements under Duties of the SSHO.
May-2016 A UFGS 01 42 00 Sources for Reference Publications C 1 Added ONVIF and ICS
May-2016 N UFGS 08 51 13 Aluminum Windows C 2 CCR 3599: Removed ASTM D1972 reference from section and revised text in subpart 1.7
May-2016 N UFGS 08 51 23 Steel Windows C 2 CCR 4166: Removed subpart 2.2.6 and reference ASTM A167
May-2016 N UFGS 08 52 00 Wood Windows C 2 CCR 3600: Removed ASTM D1972 reference from section and revised text in subpart 1.4.1
May-2016 N UFGS 22 00 00 Plumbing, General Purpose C 1 Added Navy and Army/Air Force bracketed options to subpart 2.16
May-2016 S UFGS 23 01 30.41 HVAC System Cleaning C 1 The USACE DWG members have given their approval to delete the second paragraph regarding an Army Statement, found in the General Note.
May-2016 N UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal C 2 Administrative changes per CCR 580
May-2016 N UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output) C 2 CCR 4532: revised use of "shall" and imperative language
May-2016 A UFGS 31 31 16.13 Chemical Termite Control C 1 Update to referenced website URLs
May-2016 N UFGS 32 92 19 Seeding C 1 CCR 4742: Revised subpart 3.4.4
May-2016 F UFGS 33 12 33.00 30 Water Meters C 1 Section retitled from WATER UTILITY METERING
May-2016 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 3 CCR 4187: Removed ASTM A167 reference from section. CCR 4581: Revised subpart 2.13.8 by replacing ASTM A176 with ASTM A240/A240M.
Feb-2018 N UFGS 01 35 26 Governmental Safety Requirements C 6 In response to CCR 5966, Note in para 1.6.1 has been updated to include Hawaii; in response to CCR 6077, item "e" under para 3.7.1 "Scaffolding" has been corrected.
Feb-2018 N UFGS 05 51 33 Metal Ladders C 2 Incorporated the changes from the final rule 29 CFR 1910 (Nov 2016) affecting phasing out cages installed on fixed ladders
Feb-2018 N UFGS 07 14 00 Fluid-Applied Waterproofing C 2 In response to CCR 5945
Feb-2018 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 3 In response to CCR 2219 reference for recycled materials added.
Feb-2018 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 3 In response to CCRs 2225, 2226, 2227, and 2228
Feb-2018 N UFGS 07 42 13 Metal Wall Panels C 2 In response to CCR 3731
Feb-2018 N UFGS 07 42 63 Fabricated Wall Panel Assemblies C 3 In response to CCRs 1529 and 3187
Feb-2018 N UFGS 08 56 46.20 20 Radio Frequency Shielded Enclosures, Welded Type C 1 In response to CCR 1700
Feb-2018 N UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers C 1 In response to CCRs 2409 and 3191
Feb-2018 A UFGS 10 26 00 Wall and Door Protection C 1 In response to CCR 6149, replaced ASTM A167 references with ASTM A240/A240M
Feb-2018 N UFGS 11 05 40 Common Work Results for Foodservice Equipment C 2 In response to CCR 3364
Feb-2018 N UFGS 13 34 19 Metal Building Systems C 2 In response to CCRs 1904 and 4945
Feb-2018 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 6 Added pressure test requirements for coils to paragraph 2.12.2.
Feb-2018 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 3 In response to CCR 5445, added note to paragraph 3.2.1.6 for NAVFAC MAR Projects
Feb-2018 N UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter C 2 Changes were made to align with manufacturers standard products.
Feb-2016 N UFGS 01 14 00 Work Restrictions C 3 Added requirement for utility cutover and connection to existing sanitary sewer line.
Feb-2016 S UFGS 01 33 00 Submittal Procedures C 7 Incorporated outstanding CCR's.
Feb-2016 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 3 Added provision for dumpsters tailored to NAVFAC SE
Feb-2016 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling C 1 Corrected Section title, was CEMENT TILING, QUARRY TILING, AND PAVER TILING; corrected tailoring
Feb-2016 N UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System C 1 Change to clarify that vendor products named are pretested for specification compliance. These and additional vendors and products may be submitted for review of compliance with test results in accordance with this specification; editorial updates.
Feb-2016 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling C 1 Performed updating of Section Format, imperative language, formatting review, and Submittal Article clean up
Feb-2016 A UFGS 33 30 00 Sanitary Sewerage C 4 Additional requirements to prevent cross connection of sanitary with storm sewer
Nov-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays.
Nov-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays
Nov-2015 N UFGS 01 33 29 Sustainability Requirements and Reporting C 1 Alignment with sustainable policies.
Nov-2015 S UFGS 12 31 00 Manufactured Metal Casework C 1 Subpart 2.8, SRF 09 06 90 changed title from Color Schedule to Schedules for Painting and Coating
Nov-2015 S UFGS 12 32 00 Manufactured Wood Casework C 1 Subpart 2.3.3, SRF 09 06 90 changed title from Color Schedule to Schedules for Painting and Coating
Nov-2015 S UFGS 12 34 00 Manufactured Plastic Casework C 1 Subpart 2.3.2, SRF 09 06 90 changed title from Color Schedule to Schedules for Painting and Coating
Nov-2015 S UFGS 12 36 00 Countertops C 1 Subpart 2.2.2, Section Reference (SRF) 09 06 90 changed title from "Color Schedule" to "Schedules for Painting and Coating"
Nov-2015 S UFGS 12 48 13 Entrance Floor Mats and Frames C 2 Subpart 2.4, SRF 09 06 90 changed title from COLOR SCHEDULE to Schedules FOR PAINTING AND COATING
Nov-2015 N UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System C 1 Deleted paragraph 2.1.3 MECHANICAL PIPE COUPLING SYSTEM and subparagraphs 2.1.3.1, 2.1.3.2, 2.1.3.3
Nov-2015 A UFGS 31 00 00 Earthwork C 1 Added fill lift height and moisture requirements as recommended in approved CCR 4098
Nov-2015 N UFGS 33 05 23 Trenchless Utility Installation C 1 Removed reference to UFGS Section 33 01 30.16 in subpart 3.5.3, as this section is not yet published
Nov-2015 N UFGS 33 47 13 Pond and Reservoir Liners C 2 Recommended changes from NAVFAC SE regarding revised notes, to use of imperative language and miscellaneous items as submitted via CCR 4563.
Feb-2015 S UFGS 01 33 00 Submittal Procedures C 5 Per USACE request, adjusted the Note in the following subparts, 1.4.1, 1.4.3, 1.11.4, to let the designers know they can only use the wording in the Model RFP for guidance but can't get the file, Section 01 33 16 Design After Award is not a UFGS Section.
Feb-2015 N UFGS 01 45 00.00 20 Quality Control C 1 Updated to conform to the DOD Special Inspection requirements defined in spec 01 45 35; Added Special Inspections requirements and removed references to LEED.
Feb-2015 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 2 Modified subpart 3.1.1.3
Feb-2015 N UFGS 01 78 23 Operation and Maintenance Data C 3 Added Safety Hazards, Operating Log, Extended Warranty and Field Test Reports to O&M DATA PACKAGES. Coordinated with UFGS 01 78 24.00 20 Facility eOMSI .
Feb-2015 S UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 02 42 51 Carpet Removal and Reclamation C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 N UFGS 03 30 00 Cast-In-Place Concrete C 1 Completion of Criteria Change Request.
Feb-2015 A UFGS 03 30 00.00 10 Cast-In-Place Concrete C 1 Response to CCR 3916.
Feb-2015 S UFGS 05 72 00 Decorative Metal Specialties C 1 Consist of imperative language, spell check, QC reports, and formatting review .
Feb-2015 A UFGS 14 92 00 Pneumatic-Tube System C 1 Incorporate CCR 3970, adding Energy Star compliance .
Feb-2015 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC C 1 Completion of Criteria Change Request.
Feb-2015 N UFGS 23 82 00.00 20 Terminal Heating Units C 1 Completion of Criteria Change Request .
Feb-2015 N UFGS 26 08 00 Apparatus Inspection and Testing C 1 Modified subpart 3.1 e.
Feb-2015 N UFGS 33 47 13 Pond and Reservoir Liners C 1 Reference update; added subparts 2.1.3, 2.1.4, 2.1.5, and 2.1.6; technical updates to subparts 3.3, 3.6, 3.7.1.2.1, and 3.7.1.2.2
May-2018 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 2 Incorporation of eCMS Transmittal function into Table 1.
May-2018 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 1 Change incorporates minor corrections and coordinates the use of Non-mineral insulating oil.
Nov-2014 N UFGS 01 11 00 Summary of Work C 1 SRF Update: Replaces 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.
Nov-2014 S UFGS 01 33 00 Submittal Procedures C 4 Tri-Annual Database Maintenance (TADM), which consists of: Tailoring changes, incorporation of Sustainability requirements, CCR's and verification of all reports and spelling.
Nov-2014 A UFGS 01 74 19 Construction Waste Management and Disposal C 1 Replaced section reference 01 35 40.00 20 with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.
Nov-2014 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 Clarified how to download eOMSI Facility Data Workbook, added reference to Section 01 32 17.00 20, and in 2.3, item e, added Asset number provided by Govt.
Nov-2014 S UFGS 01 91 00.00 40 Commissioning C 1 Edited PART 1 GENERAL and deleted the mention of Section 01 35 40.00 20; added the listing of Section 01 57 19.00 20 Temporary Environment Controls, and realigned the item lettering.
Nov-2014 A UFGS 03 70 00 Mass Concrete C 1 Replaced section reference 01 35 40.00 20 with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.

Pages