UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PAsort ascending UFGS Section Action Change # Nature of Change or Revision
Nov-2017 S UFGS 22 15 13.16 40 High-Pressure Compressed-Air Piping and Valves, Stainless R Tri-Annual Database Maintenance (TADM) completed
Nov-2017 S UFGS 22 15 14.00 40 General Service Compressed-Air Systems, Low Pressure R Tri-Annual Database Maintenance (TADM) completed
Nov-2017 S UFGS 23 22 25.00 40 Steam Valves R Tri-Annual Database Maintenance (TADM) completed
Nov-2017 S UFGS 26 23 00.00 40 Switchboards and Switchgear R Tri- Annual Database Maintenance (TADM) completed.
Nov-2017 S UFGS 26 52 00.00 40 Emergency Lighting R Tri-Annual Database Maintenance (TADM) completed.
Nov-2017 S UFGS 26 56 23.00 40 Area Lighting D Section retired. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2017 S UFGS 12 34 00 Manufactured Plastic Casework R Tri-Annual database maintenance (TADM) completed.
Aug-2017 S UFGS 12 48 13 Entrance Floor Mats and Frames R Tri-Annual database maintenance (TADM) completed.
Aug-2017 S UFGS 33 51 39 Monitoring Wells N New section through unification of (and Superseding) UFGS 33 24 00 00 20 [Extraction] [Monitoring] Wells and UFGS 33 24 13 Groundwater Monitoring Wells
Aug-2017 S UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers R Tri-Annual Database Maintenance (TADM) completed .
Aug-2017 S UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers R Tri-Annual Database Maintenance (TADM) completed .
Aug-2017 S UFGS 42 23 13.00 40 Process Condensers R Tri-Annual Database Maintenance (TADM) completed .
Aug-2017 S UFGS 43 41 16.16 40 Vertical Atmospheric Tanks and Vessels R Tri-Annual Database Maintenance (TADM) completed .
Aug-2017 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers C 1 Updated to coordinate archiving of Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
Aug-2017 S UFGS 26 23 00.00 40 Switchboards and Switchgear C 1 Updated to coordinate archiving of Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
May-2017 S UFGS 22 14 29.00 Sump Pumps R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 74 33.00 40 Small HVAC Units, Cooling-Only, Recirculating, Split and Unitary for Window and Floor Mounting R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 82 19.00 40 Fan Coil Units R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 82 23.00 40 Unit Ventilators R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 82 43.00 40 Electric Duct Heaters R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 26 28 21.00 40 Automatic Transfer Switches R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 27 05 28.36 40 Cable Trays for Communications Systems R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 40 18 00.00 40 Vacuum Systems Process Piping R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 42 22 00.00 40 Process Chillers and Coolers R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 05 51 00 Metal Stairs C 1 Incorporated CCR 5531, revised paragraphs 2.4.1, and 2.4.2
May-2017 S UFGS 32 31 13 Chain Link Fences and Gates C 1 Incorporated CCR 4487, revised paragraphs 2.2.15, and 2.2.17
Feb-2017 S UFGS 01 75 00.00 40 Starting and Adjusting D This Section has been retired / Action Item from the Fall 2016 Specification DWG Meeting. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 S UFGS 05 51 00 Metal Stairs R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 23 09 13.34 40 Control Valves, Self-Contained R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 23 22 13.35 40 Steam Traps R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 23 34 23.00 40 HVAC Power Ventilators R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 33 71 01.00 40 Overhead Transmission and Distribution C 1 Changed 3 tailoring tags; corrected minor discrepancies
Aug-2016 S UFGS 01 91 00.00 40 Commissioning D Replaced by UFGS Section 01 91 00.15 Total Building Commissioning (Preparing Activity: USACE). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2016 S UFGS 03 47 13 Tilt-Up Concrete R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 06 18 00 Glued-Laminated Construction R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 12 36 00 Countertops R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 22 07 19.00 40 Plumbing Piping Insulation R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 26 05 00.00 40 Common Work Results for Electrical R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 26 09 23.00 40 Lighting Control Devices R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 26 24 16.00 40 Panelboards R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 26 35 33.00 40 Power Factor Correction Equipment R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 33 77 19.00 40 Medium-Voltage Switch R Tri-Annual Database Maintenance (TADM) completed
May-2016 S UFGS 21 22 00.00 40 Clean Agent Fire Extinguishing Systems R Tri-Annual Database Maintenance (TADM) completed
May-2016 S UFGS 23 31 13.00 40 Metal Ducts R Tri-Annual Database Maintenance (TADM) completed
May-2016 S UFGS 23 36 00.00 40 Air Terminal Units R Tri-Annual Database Maintenance (TADM) completed
May-2016 S UFGS 23 82 16.00 40 Air Coils R Tri-Annual Database Maintenance (TADM) completed
May-2016 S UFGS 26 56 19.00 40 Roadway Lighting R Tri-Annual Database Maintenance (TADM) completed
May-2016 S UFGS 26 56 36.00 40 Flood Lighting R Tri-Annual Database Maintenance (TADM) completed
May-2016 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System R Tri-Annual Database Maintenance (TADM) completed
May-2016 S UFGS 33 01 99 Slip Lining of Existing Piping D Superseded by UFGS Section 33 01 30.72 Relining Sewers; Preparing Activity changed from NASA to NAVFAC. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2016 S UFGS 40 17 30.00 40 Welding General Piping R Tri-Annual Database Maintenance (TADM) completed
May-2016 S UFGS 01 33 00 Submittal Procedures C 8 Revised the following three subparts, 1.4.1, 1.4.3, 1.11.4, due to releasing Section 01 33 16.00 10 DESIGN DATA [DESIGN AFTER AWARDS] for use on USACE Design-Build projects only.
May-2016 S UFGS 23 01 30.41 HVAC System Cleaning C 1 The USACE DWG members have given their approval to delete the second paragraph regarding an Army Statement, found in the General Note.
May-2011 S UFGS 01 33 00 Submittal Procedures R CCR 808: Inserted 1.1 SUMMARY inside of an Army tailoring tag
May-2011 S UFGS 05 72 00 Decorative Metal Specialties R CCR 496: Minor revisions
Feb-2018 S UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements R Tri-Annual Database Maintenance (TADM) completed
Feb-2018 S UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems R Tri-Annual Database Maintenance (TADM) completed
Feb-2018 S UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems R Tri-Annual Database Maintenance (TADM) completed
Feb-2018 S UFGS 03 62 16 Metallic Non-Shrink Grouting R Tri-Annual Database Maintenance (TADM) completed
Feb-2018 S UFGS 05 52 00 Metal Railings R Tri-Annual Database Maintenance (TADM) completed
Feb-2016 S UFGS 23 41 13.00 40 Panel Filters R Tri-Annual Database Maintenance (TADM) completed
Feb-2016 S UFGS 27 21 00.00 40 Intercommunication System R Tri-Annual Database Maintenance (TADM) completed
Feb-2016 S UFGS 01 33 00 Submittal Procedures C 7 Incorporated outstanding CCR's.
Feb-2016 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling C 1 Performed updating of Section Format, imperative language, formatting review, and Submittal Article clean up
Nov-2015 S UFGS 09 67 23.13 Standard Resinous Flooring R Tri-Annual Database Maintenance (TADM) completed
Feb-2018 S UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells R Tri-Annual Database Maintenance (TADM) completed.
Nov-2015 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Tri-Annual Database Maintenance (TADM) completed
Nov-2015 S UFGS 26 53 00.00 40 Exit Signs R Tri-Annual Database Maintenance (TADM) completed
Nov-2015 S UFGS 12 31 00 Manufactured Metal Casework C 1 Subpart 2.8, SRF 09 06 90 changed title from Color Schedule to Schedules for Painting and Coating
Nov-2015 S UFGS 12 32 00 Manufactured Wood Casework C 1 Subpart 2.3.3, SRF 09 06 90 changed title from Color Schedule to Schedules for Painting and Coating
Nov-2015 S UFGS 12 34 00 Manufactured Plastic Casework C 1 Subpart 2.3.2, SRF 09 06 90 changed title from Color Schedule to Schedules for Painting and Coating
Nov-2015 S UFGS 12 36 00 Countertops C 1 Subpart 2.2.2, Section Reference (SRF) 09 06 90 changed title from "Color Schedule" to "Schedules for Painting and Coating"
Nov-2015 S UFGS 12 48 13 Entrance Floor Mats and Frames C 2 Subpart 2.4, SRF 09 06 90 changed title from COLOR SCHEDULE to Schedules FOR PAINTING AND COATING
Aug-2015 S UFGS 05 52 00 Metal Railings R Tri-Annual Database Maintenance (TADM) completed
Aug-2015 S UFGS 08 33 23 Overhead Coiling Doors R Tri-Annual Database Maintenance (TADM) completed
Feb-2015 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Tri Annual Database Maintenance (TADM) completed.
Feb-2015 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating R Tri Annual Database Maintenance (TADM) completed.
Feb-2015 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Tri Annual Database Maintenance (TADM) completed.
Feb-2015 S UFGS 08 34 73 Sound Control Door Assemblies R Tri Annual Database Maintenance (TADM) completed.
Feb-2015 S UFGS 23 01 30.41 HVAC System Cleaning R Tri Annual Database Maintenance (TADM) completed.
Feb-2015 S UFGS 26 05 70.00 40 High-Voltage Overcurrent Protective Devices R Tri Annual Database Maintenance (TADM) completed.
Feb-2015 S UFGS 01 33 00 Submittal Procedures C 5 Per USACE request, adjusted the Note in the following subparts, 1.4.1, 1.4.3, 1.11.4, to let the designers know they can only use the wording in the Model RFP for guidance but can't get the file, Section 01 33 16 Design After Award is not a UFGS Section.
Feb-2015 S UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 02 42 51 Carpet Removal and Reclamation C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 05 72 00 Decorative Metal Specialties C 1 Consist of imperative language, spell check, QC reports, and formatting review .
Nov-2017 S UFGS 01 45 00.00 40 Quality Control R Tri-Annual Database Maintenance (TADM) completed.
Nov-2014 S UFGS 09 96 00 High-Performance Coatings R Tri-Annual Database Maintenance (TADM) completed.
Nov-2014 S UFGS 09 97 13.00 40 Steel Coatings R Tri-Annual Database Maintenance (TADM) completed.
Nov-2014 S UFGS 12 31 00 Manufactured Metal Casework R Tri-Annual Database Maintenance (TADM) completed.

Pages