UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
Feb-2021 A UFGS 31 00 00 Earthwork C 2 Updated paragraph 1.5.4 in response to CCR 5210. Updated reference in response to CCR 7275. Updated paragraphs in Part 3 in response to CCRs 9380, 9381, 9382 and 9384.
Feb-2021 A UFGS 33 52 43.13 Aviation Fuel Piping C 1 Updated reference publication in paragraph 2.1.6 in response to CCR 8022. Deleted redundant submittal items in response to CCR 8765. Corrected misspelled words in response to CCR 9188. Updated paragraph Contractor Qualifications to align with UFGS 33 52 40 and UFGS 33 52 10 in response to CCR 8536.
Feb-2021 A UFGS 33 52 43.14 Aviation Fuel Control Valves C 1 Updated valve body material. Corrected terminology in paragraph 1.5 in response to CCR 9173. Clarified paragraph Bodies, Bonnets, and Covers in response to CCR 9174. Updated sentence in paragraph 2.2.1.6 in response to CCR 3432.
Feb-2021 A UFGS 33 52 43.23 Aviation Fuel Pumps C 1 Updated pump casing material.
Feb-2021 N UFGS 01 20 00 Price and Payment Procedures C 1 In response to CCR 9618, reference to FAR 32.503-6 has been replaced with "FAR 32.103 Progress payments under construction contracts" in paragraph (1.7.1) "Obligation of Government Payments" .
Feb-2021 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 6 In response to CCRs 9429 and 9621, removed reference to DoD Manual 5200.01-V4 and all FOUO designations; replaced "FOUO - For Official Use Only" with "CUI Controlled Unclassified Information" throughout; and changed CLASS heading in Table 1 to "DESIG" (designation).
Feb-2021 N UFGS 01 45 00.00 20 Quality Control C 8 In response to the following CCRs: 8956 - add reference to UFGS Section 01 32 16.00 20; and 9339 - coordinate commissioning and sustainability with UFGS Sections 01 91 00.15 20 and UFGS 01 33 29.
Feb-2021 N UFGS 01 45 00.10 20 Quality Control for Minor Construction C 3 In response to CCR 8942, "KO" has been replaced with "Contracting Officer" throughout, "Pre-Construction Conference" and "Pre-Construction Meeting" have been tailored for Army and Navy respectively, and various clerical tagging corrections have been made.
Feb-2021 N UFGS 03 30 00 Cast-In-Place Concrete C 1 In response to CCR 6876, the mark for ASTM A615/A615M reinforcing bars was changed from "A" to "S" in paragraph (2.6.1) Reinforcing Bars, list item "b".
Feb-2021 N UFGS 03 45 00 Precast Architectural Concrete C 1 In response to CCR 9837, reference to A, B and C grades were removed from the paragraph "Grout" (2.2.13).
Feb-2021 N UFGS 07 41 13 Metal Roof Panels C 4 In response to CCR 9492, updated paragraph (3.13) WARRANTY by removing "USACE" from the title and requirements for future contracts and arbitration.
Feb-2021 N UFGS 13 34 19 Metal Building Systems C 1 In response to CCR 9491, updated paragraph (3.14) WARRANTY by removing Army tailoring and Specifier Note as well as requirements for future contracts and arbitration.
Feb-2021 N UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running C 1 Incorporation of cyber security requirements, clarification of testing requirements, and formatting.
Feb-2021 N UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley C 1 Incorporation of cyber security requirements, clarification of testing requirements, and formatting.
Feb-2021 S UFGS 08 34 73 Sound Control Door Assemblies C 1 Added STC rating to Para 1.3.1.4 - CCR# 8318
Feb-2021 S UFGS 01 33 00 Submittal Procedures C 4 Incorporation of the following CCRs: Incorporated PPI Information CCR# 7812 - Changed Title to Certification of Submittal in 1.17 CCR# 7894 - Updated paragraph 1.6.1 for non-Army projects CCR# 8991 - Added 23 09 00 to paragraph 1.5.2 CCR# 9026 - Deleted the 2nd sentence in par 1.10.2. Added “For variations that include design changes or some material or product substitutions, the Government may require an evaluation and analysis by a licensed professional engineer hired by the contractor. in para 1.10.1 CCR# 9065 - Deleted Tailoring Notes for 1.4.2.1, 1.4.2.2, 1.4.2.3 and 1.4.2.4. Added note to 1.4.2 CCR# 9073 - Added Section 01 91 00.15 20: Commissioning Plan, Certificate of Readiness, and Commissioning Report" to paragraph 1.5.2 CCR# 9326
May-2021 A UFGS 04 01 20.75 Masonry Strengthening Using Surface Applied FRP Composites C 2 Updated subparts 3.4.3.2 and 3.4.3.3 in response to CCR 4378.
May-2021 A UFGS 06 17 19 Cross-Laminated Timber C 2 Deleted 2nd note paragraph in subpart 2.2.3 in response to CCR 8979.
May-2021 A UFGS 23 09 00 Instrumentation and Control for HVAC C 3 This change aligns PVT requirements with Navy testing processes and eliminates an extraneous tailoring option. Deleted subpart 1.8.11 and corresponding submittal item in response to CCR 9532. Updated subpart 3.10 in response to CCR 9365.
May-2021 A UFGS 23 09 13 Instrumentation and Control Devices for HVAC C 2 Updated subpart 2.7.3.4.4 in response to CCR 7146.
May-2021 A UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration C 1 Updated cybersecurity requirements in response to CCR 9323. Deleted subpart 3.3.2 and corresponding submittal item in response to CCR 9748.
May-2021 A UFGS 32 13 15.20 Concrete Pavement for Fuel Storage Containment Dikes C 1 Added impermeable liner system requirements in response to CCR 7040.
May-2021 N UFGS 26 27 14.00 20 Electricity Metering C 1 In response to the following: CCR 937, IEC 60687 has been removed from the Reference Article and the section text; CCR 4620, the accuracy class in potential and current transformers was changed to "0.15" in paragraphs Potential Transformer Requirements (2.1.2) item f. and Current Transformer Requirements (2.1.3) item b.; and CCR 5117, reference to a 'Voltage Requirements' paragraph was removed from paragraph (2.1.5) Disconnect Method, item c.
May-2021 N UFGS 01 11 00 Summary of Work C 1 In response to CCR 8732, unnecessary brackets were removed from the last sentence in the 2nd paragraph under (1.8) LOCATION OF UNDERGROUND UTILITIES retaining the sentence as a standard requirement.
May-2021 N UFGS 03 45 00 Precast Architectural Concrete C 1 In response to CCR 9739, "High-Density Plastic" has been added as the title for paragraph 2.7.6
May-2021 N UFGS 01 14 00 Work Restrictions C 12 In response to CCR 9908, paragraph Shipyard Area Work Clearance Request (1.5.10) has been tailored for Navy.
May-2021 N UFGS 01 91 00.15 20 Total Building Commissioning C 1 Changes made to align with NAVFAC policy, and corrections of errors and omissions.
May-2021 N UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems C 1 Changes made to align with NAVFAC policy, and corrections of errors and omissions.
May-2021 N UFGS 26 51 00 Interior Lighting C 1 Changes made to address various CCRs: added new paragraph (1.5.8) "Photometric Plan"; updated Specifier Note in LED Light Sources (2.3.1); updated (2.6.1.1) Exit Signs with Battery Backup and (2.6.6) Central Emergency Lighting System.
May-2021 N UFGS 03 30 00 Cast-In-Place Concrete C 2 In response to the following: CCR 7515, updated ACI 302.1R table references in paragraph (3.10.2) "Flat Floor Finishes"; CCR 7801, revised Specifier Note and list item a. in subparagraph (2.3.1.1) "Portland Cement"; CCR 8263, changed center table heading to "12 months" in subparagraph (2.5.2.4) "Sulfate Resistance" list item c.; CCR 8321, updated list item b. in subparagraph (2.3.1.3) "Fly Ash" and revised subparagraph (2.3.1.4) "Slag Cement"; CCR 8333, updated bar Grades in paragraph (2.6.1) "Reinforcing Bars" list item b. and (2.6.1.2) "Epoxy-Coated Reinforcing Bars" list item a.; CCR 8571, deleted paragraph "Perimeter Insulation" (2.2.6); CCRs 8085 and 8572 added the option “IL portland limestone cement” to subparagraph (2.3.1.2) "Blended Cements" in the Specifier Note and list item a.; CCRs 9127 and 9142, updated list item b. in paragraph (3.5.2) "Vapor Retarder [and Vapor Barrier]", replaced "air temperature" with "concrete temperature" in paragraph (3.6.2) "Mixing" list items b. and c., also added manufacturer's recommended dosage in item d., updated article (3.7) “Placing Concrete” and paragraph (3.10.1) “Finish”, and added new subparagraphs (3.14.1.1) “Fine Aggregate” and (3.14.1.2) “Course Aggregate” under (3.14.1) “Aggregate Testing”.
May-2021 N UFGS 22 00 00 Plumbing, General Purpose C 4 Added "Army" projects to the Specifier Notes under (2.1.1) Pipe Joint Materials, list item t., (3.1.3.6) Copper Tube and Pipe, list item d, and (3.12) TABLE II; added Air Force tailoring to paragraph (2.4.6) No-Water Urinals; NOTES indicating tailoring options added throughout this section.
May-2021 N UFGS 26 20 00 Interior Distribution System C 2 Incorporated CCR changes throughout this section.
May-2021 N UFGS 05 12 00 Structural Steel C 2 In response to CCR 9371, the material strength in paragraph Structural Steel Tubing (2.2.2) was updated to "Grade [C]"
May-2021 N UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts C 1 Changes made to address various CCRs: added "IEC 61000-3-12" to References and paragraph Power Line Surge Protection (1.3.2.1); replaced reference UL 508C with "UL 61800-5-1"; ASD was changed to "110" percent in list item d. and "IEC" was added to list item r. in article (2.1) ADJUSTABLE SPEED DRIVES ; and article (2.2) ENCLOSURES was updated.
May-2021 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 4 In response to CCR 9422, subparagraph (1.4.6.1.1) Removal of Waste from Camp Lejeune has been updated to reflect the landfill waste policy at Camp Lejeune.
Aug-2021 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Added Note to Submittal Article with instructions for Navy Design-Build projects.
Aug-2021 A UFGS 01 74 19 Construction Waste Management and Disposal C 2 Added Note to Submittal Article with instructions for Navy Design-Build projects. Incorporated CCRs that support certain Navy Facilities Engineering Commands.
Aug-2021 A UFGS 01 78 00 Closeout Submittals C 1 Added Note to Submittal Article with instructions for Navy Design-Build projects. Deleted note and bracketed selections for Army only in response to CCR 8454.
Aug-2021 A UFGS 26 36 23 Automatic Transfer Switches and By-Pass/Isolation Switch C 1 Incorporated CCRs and corrected formatting errors.
Aug-2021 N UFGS 01 11 00 Summary of Work C 2 In response to CCR 9971, added note to Submittal Article for NAVFAC PAC requirement to remove Government approval of salvage plan, and modified corresponding paragraph in text.
Aug-2021 N UFGS 01 14 00 Work Restrictions C 13 In response to the following CCRs: 9044, added Note to Submittal Article with instructions for Navy Design-Build projects; 9826, updated last sentence in Activity Regulations paragraph (1.5.1) to clarify identifying Contractor equipment; 3976, replaced "must" with "will" or "may" throughout Part 1 as appropriate.
Aug-2021 N UFGS 01 20 00 Price and Payment Procedures C 2 In response to CCR 9972, included timeline requirements for both Schedule of Prices and Earned Value Report and corrected typo in Note in Data Required paragraph.
Aug-2021 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 10208, updated requirements for NAVFAC PAC DB and DBB in Partnering and Mobilization paragraphs.
Aug-2021 N UFGS 01 35 26 Governmental Safety Requirements C 1 In response to CCR 9981, updated Note in APP-Construction paragraph to clarify instructions for NAVFAC PAC DB and DBB project options.
Aug-2021 N UFGS 01 57 19 Temporary Environmental Controls C 5 Added Note to Submittal Article with instructions for Navy Design-Build projects. In response to CCR 10213, updated requirements for NAVFAC PAC DB and DBB in Environmental Protection Plan paragraph.
Aug-2021 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 5 Added Note to Submittal Article with instructions for Navy Design-Build projects.
Aug-2021 N UFGS 01 78 23 Operation and Maintenance Data C 2 Added "Marine Corps Installations" to General Note.
Aug-2021 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 3 In response to CCR 8939, added bracketed option for section UFGS 01 32 16.00 20 in Pre-Construction/Post-Award Kickoff Meeting paragraph. Added "Marine Corps Installations" to General Note and updated Notes for the Facility Data Workbook; modified Notes and paragraphs to have either brackets or tailoring, not both.
Aug-2021 N UFGS 26 08 00 Apparatus Inspection and Testing C 2 Incorporated optional paragraphs in PART 3 regarding UFGS Sections 26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER and 26 35 44 270 VDC SOLID STATE CONVERTER.
Aug-2021 N UFGS 32 92 19 Seeding C 1 In response to CCR 10412, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2021 N UFGS 32 92 23 Sodding C 1 In response to CCR 10413, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2021 N UFGS 32 92 26 Sprigging C 1 In response to CCR 10414, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2021 N UFGS 32 93 00 Exterior Plants C 1 In response to CCR 10415, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2021 N UFGS 32 96 00 Transplanting Exterior Plants C 1 In response to CCR 10416, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Nov-2021 A UFGS 01 45 00.00 10 Quality Control C 2 Incorporated CCRs 8607, 10228, 10948, and 11035.
Nov-2021 A UFGS 01 78 24.00 10 Facility Data Requirements C 1 Incorporated CCR 10987 and corrected formatting issues.
Nov-2021 A UFGS 01 74 19 Construction Waste Management and Disposal C 3 Required to align with NAVFAC regional fidelity, and to fix administrative issues, per two CCRs.
Nov-2021 A UFGS 09 97 02 Painting: Hydraulic Structures C 1 Incorporated CCRs and corrected formatting errors.
Nov-2021 A UFGS 31 23 01 Underwater Blasting C 1 Incorporated CCR 10552 and corrected formatting errors.
Nov-2021 A UFGS 31 23 06.00 Blasting - Surface C 1 Incorporated CCR 10553 and corrected formatting errors.
Nov-2021 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 7 In response to CCR 11022, updated requirements for jobsite computer tablet in the Field Administration paragraph, and CCR 11023, updated the Contract Administration paragraph to clarify eCMS file storage structure. Also added minimum download and upload speeds to paragraph 1.4.1 General.
Nov-2021 N UFGS 01 35 26 Governmental Safety Requirements C 2 In response to CCR 10735, corrected CFR reference in the Competent Person for Confined Space Entry paragraph and updated the Work Around Flammable Materials paragraph.
Nov-2021 N UFGS 01 58 00 Project Identification C 3 In response to CCR 9882, instructions have been added for Air Force projects on Guam, on both Navy installation with NAVFAC execution and Army installation with USACE execution. Also, clarified Air Force instruction in the first Note in the Project Identification Signboard paragraph.
Nov-2021 N UFGS 03 30 00 Cast-In-Place Concrete C 3 In response to CCR 10400, updated paragraph 2.3.1.2 -Blended Cements, list item c. and 2.3.1.6-Other Supplementary Cementitious Materials. Also updated 3.6.2-Mixing, list item c.
Nov-2021 N UFGS 03 45 00 Precast Architectural Concrete C 2 In response to CCR 9942 (submitted for UFGS-03 45 33), updated the table in the Cementitious Materials paragraph.
Nov-2021 N UFGS 03 45 33 Precast [Prestressed] Structural Concrete C 1 In response to CCR 9942, updated the table in the Cementitious Materials paragraph. Also updated the MATERIALS paragraph.
Nov-2021 N UFGS 08 34 16.20 Vertical Lift Fabric Doors C 1 Targeted update to incorporate recent lessons learned for wire-rope termination, safety arresters, performance standards, warranty and other safety items.
Nov-2021 N UFGS 26 20 00 Interior Distribution System C 3 In response to the following: CCR 10728, "Cable Trays" and optional "Cable Tray Design Data" were added to the Submittal Article under SD-03 and SD-05, respectively, and tagged in the CABLE TRAY paragraph; CCR 10729, optional text added for the cable tray to serve as the EGC in the Trough-Type Cable Trays, Ladder-Type Cable Trays, and Channel-Type Cable Trays paragraphs; and CCR 10730, able Tray Installation paragraph has been updated to prevent partial or complete obstruction of access by cable tray and tray supports.
Nov-2021 N UFGS 26 51 00 Interior Lighting C 2 In response to the following: CCR 10008, changed the LED source replacement requirement from 10% to 15% in the Luminaire Warranty paragraph (list items b and c) and CCR 10327, the integral driver surge protection has been updated to 2 kV in the LED Drivers paragraph, list item f.
Feb-2022 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams C 1 Incorporated CCR 10582.
Feb-2022 A UFGS 23 30 00 HVAC Air Distribution C 1 Incorporated CCR 2491.
Feb-2022 N UFGS 01 58 00 Project Identification C In reference to CCR 11189, Project Sign Details (PDF and zip files) found under Related Materials have been updated. Classified as a clerical change.
Feb-2022 N UFGS 01 14 00 Work Restrictions C 14 In response to CCR 11282, "Naval Base, Norfolk VA" and "Naval Air Station, Norfolk, VA" changed to "Naval Station Norfolk, Norfolk, VA".
Feb-2022 N UFGS 01 35 13 Special Project Procedures C 1 In response to CCR 9539, specifier notes were added to the Definitions and Airfield Obstruction Lights paragraphs; tailoring was corrected to NAVFAC HI for paragraphs 3.2.3 "RIMPAC", 3.2.4 "December 7, 1941", and 3.2.5 "Pearl Harbor"
Feb-2022 N UFGS 01 35 26 Governmental Safety Requirements C 3 Added "Government Designated Authority (GDA)" to Dive Safety Requirements paragraph. In response to CCR 11124, updated first sentence in Competent Person, Cranes and Rigging paragraph.
Feb-2022 N UFGS 08 32 13 Aluminum Sliding Glass Doors C 1 In response to CCR 10477, bracket placement corrected to surround EXTRA STOCK paragraph (1.5)
Feb-2022 N UFGS 08 51 23 Steel Windows C 1 In response to CCR 10430, corrected specifier note for electrical CSI division, provided Army tailoring option for specific submittals within Submittal Article (1.2), and removed brackets from Thermal Performance paragraph (1.5.2)
Feb-2022 N UFGS 08 52 00 Wood Windows C 1 In response to the following CCRs: 10475, 11217, and 11224, submittal item "Engineered Wood Products" has been tailored for NAVY in Submittal Article and corrected submittal tag with in the section text to the proper paragraph Engineered Wood Products (1.2.3). CCRs 10475 and 11225, removed brackets and NAVY tailoring for submittal item "Adhesives" to correct discrepancy since the Adhesives submittal paragraph (2.3.1) is not tailored.
Feb-2022 N UFGS 08 53 00 Plastic Windows C 1 In response to CCR 10476, adjusted location of NAVY tailoring in Material Identification paragraph.
Feb-2022 N UFGS 08 56 46.10 20 Radio Frequency Shielded Enclosures, Demountable Type C 1 In response to CCR 10407, corrected CSI division for Electrical in specifier note for Grounding paragraph (3.8)
Feb-2022 N UFGS 08 56 46.20 20 Radio Frequency Shielded Enclosures, Welded Type C 2 In response to CCR 10408, corrected CSI division for Electrical in specifier note for Grounding paragraph (3.7)
Feb-2022 N UFGS 08 71 00 Door Hardware C 4 In response to the following: CCR 9281, the Hardware Schedule Table (1.5) has been replaced with a hardware item list and a hardware schedule list; CCR 10303, deleted Texture paragraph (2.3.12.3) as it does not apply.
Feb-2022 N UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal C 3 Under Related Requirements, "VAMS 23 09 53.00 20 CONTROLS AND INSTRUMENTATION BOILER PLANT" replaced with "UFC 3-430-11 BOILER PLANT INSTRUMENTATION AND CONTROL SYSTEMS"; also, the term "VAMS" has been removed throughout this section.
Feb-2022 N UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal C 5 The term "VAMS" has been removed throughout this section.
Feb-2022 N UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil C 4 The term "VAMS" has been removed throughout this section.
Feb-2022 N UFGS 33 11 00 Water Utility Distribution Piping C 1 Changes made to incorporate multiple CCRs, including updating lead free and PE Pipe requirements and adding PE tubing.
Feb-2022 S UFGS 08 33 23 Overhead Coiling Doors C 1 CCR10484: Adjusted tailoring option to entire portion of subpart 2.2.5 ELECTRIC DOOR OPERATORS
May-2022 A UFGS 01 91 00.15 10 Total Building Commissioning C 3 Updated qualifications for electrical technical commissioning specialist in response to CCRs 9054, 9096, 9741, 9970, 10182, and 10471. Updated burn-in duration for lamps in response to CCR 9218. Updated paragraph "Design Review" in response to CCRs 9220, 9222, and 9237. Updated and changed paragraph "Acceptance" to "Equipment and Systems Deficiencies Check" in response to CCR 9223.
May-2022 A UFGS 27 51 16 Public Address Systems C 1 Incorporated CCR 4973
May-2022 A UFGS 32 12 15.13 Asphalt Paving for Airfields C 1 In response to CCR 10561, added appropriate references for Navy and NASA associated with paragraphs CONTRACTOR QUALITY CONTROL STAFF, CONTRACTOR QUALITY CONTROL and GENERAL QUALITY CONTROL REQUIREMENTS. In response to CCR 11001 and CCR 9916, consolidated and clarified straightedge testing for longitudinal and transverse smoothness as well as revised Profilograph Testing requirements and associated acceptance Table 2. Prohibited the use of recycled asphalt shingles (RAS) in the asphalt mixture.
May-2022 N UFGS 01 30 00 Administrative Requirements C 2 Per CCR 9893, updated the Note in paragraph COLOR BOARDS FOR AIR FORCE PROJECTS (1.3) tailored for AIR FORCE to include AFI citation.
May-2022 N UFGS 01 58 00 Project Identification C 4 Per CCR 11078, updated Construction Project Signs paragraph (1.4.3) tailored for ARMY and AIR FORCE to address project identification signs for Air Force projects managed by USACE.
May-2022 N UFGS 02 85 00 Mold Remediation C 1 Per CCR 11701, removed reference to UFGS 00 22 13.00 20 in first Editor’s Note of Description of Work paragraph (1.3.1)
May-2022 N UFGS 26 13 00 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear C 1 Per CCR 8883, updated Automatic Switch Controls paragraph (2.1.4) with options for 120Vac control power.
May-2022 N UFGS 31 62 13.13 Cast-In-Place Concrete Piles C 2 Per CCR 11703, removed reference to UFGS 00 22 13.00 20 in Measurement and Payment paragraph (1.2.2)
May-2022 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 1 Per CCR 11704, removed reference to UFGS 00 22 13.00 20 in UNIT PRICE paragraph (1.6)
May-2022 N UFGS 31 62 13.24 Concrete Cylinder Piles C 1 Per CCR 11705, removed reference to UFGS 00 22 13.00 20 in UNIT PRICE paragraph (1.6)
May-2022 N UFGS 31 62 13.26 Pressure-Injected Footings C 1 Per CCR 11707, removed reference to UFGS 00 22 13.00 20 in Unit Price paragraph (1.4.3)
May-2022 N UFGS 31 62 16.13 Steel Pipe Piles C 1 Removed reference to UFGS 00 22 13.00 20 in Unit Price paragraph (1.4.4)
May-2022 N UFGS 31 62 16.16 Steel H-Piles C 1 Per CCR 11708, removed reference to UFGS 00 22 13.00 20 in Unit Price paragraph (1.4.3)

Pages