UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
Nov-2019 N UFGS 02 82 00 Asbestos Remediation C 1 In response to CCR 6757, paragraph "Competent Person Documentation" has been changed to "Designated Competent Person Documentation" (1.5.2) and a first tier requirement was added.
Nov-2019 N UFGS 01 35 13 Special Project Procedures C 2 In response to CCR 4579, landing area "clear zones" in paragraph Definitions (1.2) has been updated to correct fixed wing information and add helicopter information.
Nov-2019 N UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 21 13.23 20 [High] [Medium] Temperature Water System Within Buildings C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. In response to CCR 7565, as FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, the following language was removed from the paragraph WARNING SIGNS AND LABELS (2.3), "(decals, Panduit No. PPSO710D72 or approved equal)".
Nov-2019 N UFGS 26 20 00 Interior Distribution System C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 23 00 Low Voltage Switchgear C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 32 13.00 20 Single Operation Generator Sets C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 33 71 01 Overhead Transmission and Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 33 71 02 Underground Electrical Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph Cable Marking (2.2.6) “, or approved equal,”.
Nov-2019 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 5 Added notes throughout the specification and notes to the specifier prohibiting torch application of the roofing system when the roof deck, the materials used in the installation of the roofing system, or the existing roof deck or materials are combustible as defined by NFPA 101. Added required submittal to Submittals Article (1.3) of torch applicators CERTA card. Added requirement in paragraph "Preroofing Conference" (1.4.8-g). for torch operator to attend the preroofing conference. Added requirement in paragraph "Fire Watch" (1.7.2) for the use of thermal heat imager during the firewatch.
Nov-2019 N UFGS 26 00 00.00 20 Basic Electrical Materials and Methods C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (1.11-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”
Nov-2019 N UFGS 26 05 33 Dockside Power Connection Stations C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.6-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”.
Nov-2019 N UFGS 26 11 16 Secondary Unit Substations C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.5-a.), "Decal shall be Panduit No. PPSO710D72 or approved equal.".
Nov-2019 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS AND LABELS (2.6-a.), “(decals, Panduit No. PPSO710D72 or approved equal)”.
Feb-2020 A UFGS 01 45 00.00 10 Quality Control C 1 Added hyperlink to paragraph 3.7.2 in response to CCR 7765.
Feb-2020 A UFGS 07 27 10.00 10 Building Air Barrier System C 1 Revised paragraph 1.7 to update air barrier inspector qualification requirements.
Feb-2020 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling C 2 Updated paragraphs 2.4 and 2.4.7 in response to CCR 7072.
Feb-2020 A UFGS 22 00 70 Plumbing for Healthcare Facilities C 3 Updated paragraph 2.13 a. in response to CCR 2691.
Feb-2020 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 2 Updated table in paragraph 2.10.5.2.1 in response to CCR 3229. Changed reference to Energy Star to PL-109-58 in response to CCR 3488. Added paragraph 1.4. d. in response to CCR 3489. Updated paragraphs 2.1 and 2.2c in response to CCRs 3490 and 3491. Updated paragraph 2.10.1 in response to CCR 7068. Changed section reference from Section 05 50 13 to Section 08 31 00 in response to CCR 8150.
Feb-2020 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 6 Added reference to paragraph 2.4.1.2 in response to CCR 4249 and updated paragraph 3.2.2.3.4 in response to CCR 4256.
Feb-2020 A UFGS 23 09 00 Instrumentation and Control for HVAC C 2 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other Building Control Systems C 1 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems C 1 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters C 1 Updated paragraph 2.1.1 in response to CCR 3988.
Feb-2020 A UFGS 23 82 01.00 10 Warm Air Heating Systems C 1 Updated section reference in paragraph 2.11.6 in response to CCR 5140.
Feb-2020 A UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System C 1 Deleted reference from paragraphs 3.9.1.1 and 3.9.1.2 in response to CCR 2504. Updated paragraph 2.4.4 in response to CCR 3271.
Feb-2020 A UFGS 35 41 00 Levee Construction C 1 Incorporated changes to provide clarification to the responsibility of the contractor related to subsurface interpretation in paragraph 1.6.3; temporary excavation slopes in paragraph 3.9.5; and slope failure and sliding due to fault or negligence of the contractor in paragraph 3.11.
Feb-2020 A UFGS 40 05 13 Pipelines, Liquid Process Piping C 2 Updated references and paragraph 2.14.1 in response to CCR 79.
Feb-2020 A UFGS 48 06 15 Turbine Oil C 1 Updated paragraphs 1.4, 2.1.1, 2.1.2, 2.2, 2.3 and 2.4 in response to CCR 4578.
Feb-2020 N UFGS 01 14 00 Work Restrictions C 8 In response to CCR 7400, Specifier Note in paragraph (1.5.8) Occupied (and Existing) Building[s] updated to clarify the Government’s responsibility to remove or relocate equipment and direct users on how to modify this section; per CCR 7849, Saturday working hours were updated to reflect an 8-1/2 hour work period in paragraph (1.5.5) Working Hours.
Feb-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 2 In response to CCRs 8045 and 8049 subparts (1.3.1) Data Required and (1.3.2) Schedule Instructions updated to distinguish the requirements between schedule of prices and earned value reports.
Feb-2020 N UFGS 01 30 00 Administrative Requirements C 2 In response to CCR 7879, updated language in subpart (1.12.1) Formal Partnering Specifier Note to ensure the facilitator is independent of both agencies involved in the project.
Feb-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 4 In response to CCR 7810, paragraphs CONTRACT ADMINISTRATION (1.1), Information Security Classification/Identification (1.6.1), and Table 1 revised to clarify the procedure when documentation exists outside of the eCMS environment and a request is made to the contractor to provide as final project documentation.
Feb-2020 N UFGS 01 45 00.00 20 Quality Control C 5 In response to the following: CCR 4323, "QCM" and "CQM" changed to "QC Manager" for clarity in paragraph (1.14.2) Pre-Final Inspection; CCR 6302, Specifier Note in paragraph (1.5.10) QC Administrative Assistant, removed reference to require Section 01 33 29 Sustainability Reporting. It is up to the contractor to determine how they comply with contract requirements; CCR 8046, Specifier Note in paragraph (1.5.1.2) Qualifications updated to properly select the CQC requirements; and CCR 8243, para QC PROGRAM REQUIREMENTS (1.4) updated to ensure uniformity for all NAVFAC projects that compliance of the Quality Control Manager will report to an officer of the firm/company.
Feb-2020 N UFGS 09 29 00 Gypsum Board C 4 In response to CCR 8088
Feb-2020 N UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear C 1 Complete review and update; CCRs to address updating references and use of imperative language
Feb-2020 N UFGS 41 22 13.16 Gantry Cranes C 1 Updated Specifier Note in Part 1 clarifying when to use related UFGS crane sections.
May-2020 N UFGS 01 14 00 Work Restrictions C 9 Incorporates requirements of UFGS 00 73 01 SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY and cancels UFGS 00 73 01; In response to CCR 7820, refinement of electronic security system equipment categories within paragraph Electronic Security Systems Equipment (1.5.1.2.3)
May-2020 N UFGS 01 30 00 Administrative Requirements C 3 In response to CCR 8484, updated paragraph Formal Partnering (1.12.1) to ensure the facilitator is independent of both agencies involved in the project.
May-2020 N UFGS 01 35 26 Governmental Safety Requirements C 9 In response to CCR 6508, administrative changes made in Part 1 and Part 3 to coincide with industry nomenclature. A link to the contractor safety self-evaluation checklist has been added to Contractor Safety Self-Evaluation Checklist (para 1.5).
May-2020 N UFGS 01 45 00.00 20 Quality Control C 6 Added information under QC Manager Duties (1.5.1.1) as well as new paragraph "QC for [Secure Space][Controlled Area][Sound Rated] Perimeter Construction" (1.5.12) to ensure that the government Site Security Manager is involved with the inspection process early on when accreditation is required by ICD/ICS 705 and that the contractor follow a formal process for the inspection and acceptance of secure spaces, controlled areas and sound rated assemblies. Also, in response to the following: CCR 6711, clarified Note in paragraph Laboratory Accreditation Authorities (1.12.2) to include Design Manager (DM); and CCR 6867, updated to ensure duplicate technical commissioning requirements were removed.
May-2020 N UFGS 01 91 00.15 Building Commissioning C 1 Preparing Activity changed to NAVFAC as this section has been for Navy-use only since 05-2019; In response to the following: CCR 6881, paragraph Project Schedule (1.6.2) is not appropriate for use on Navy projects and was removed; and CCR 8403, in paragraph Lead Commissioning Specialist (1.8.1) , "ASHRAE Commissioning Process Management Professional (CPMP) was changed to "ASHRAE Building Commissioning Professional (BCxP)"
May-2020 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 2 In response to CCR 8507, Section has been updated to capture the requirements for surplus soil disposal at Camp Lejeune, NC (1.4.6.1.2).
May-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 3 Added cybersecurity requirements during construction, paragraph 1.6, in response to CCR 7450.
May-2020 A UFGS 01 91 00.15 10 Total Building Commissioning C 1 Updated reference publications in response to CCR 8209.
May-2020 A UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines) C 1 Revised 1st editor's note in response to CCR 7534.
May-2020 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 7 Updated paragraph 2.2.9.2.2 in response to CCR 6151.
Aug-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 4 Added notes for NAVFAC PAC requirements to paragraphs 1.2 and 2.2.1 in response to CCR 8831.
Aug-2020 A UFGS 01 74 19 Construction Waste Management and Disposal C 1 Updated last paragraph of designer's note and specification text in subpart 1.5 in response to CCR 9043. Added notes for NAVFAC PAC requirements in subparts 1.5 and 1.7, and updated text in first paragraph of subpart 1.7 in response to CCR 8834. Deleted tailoring options in subparts 1.3 and 1.4.3 in response to CCR 8911. Added tailoring options to submittal SD-06 in response to CCR 8912. Updated designer's note referring to Third Party Certification in subpart 1.7 in response to CCR 8913. Added tailoring options in subparts 1.6 and 1.7, and deleted first designer's note in subpart 1.7 in response to CCR 8914.
Aug-2020 A UFGS 01 91 00.15 10 Total Building Commissioning C 2 Updated commissioning certification in paragraph 1.8.1 in response to CCR 8404.
Aug-2020 A UFGS 03 70 00 Mass Concrete C 2 Updated paragraph 3.7.2.6.5 in response to CCR 1786.
Aug-2020 A UFGS 09 68 00 Carpeting C 2 Deleted second paragraph of subpart 2.1.1 in response to CCR 8744.
Aug-2020 A UFGS 13 48 73 Seismic Control For Miscellaneous Equipment C 1 Updated/added UFC reference in second paragraph of subpart 3.6 note and updated last sentence of first text paragraph in response to CCR 8586.
Aug-2020 A UFGS 23 05 48.19 [Seismic] Bracing for HVAC C 2 Added reference to UFC 3-301-02 to various subparts in response to CCR 8761.
Aug-2020 A UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures C 1 Deleted third paragraph of subpart 1.8.3 in response to CCR 7032.
Aug-2020 N UFGS 01 14 00 Work Restrictions C 10 Incorporate EURAFCENT requirements from, and supersede UFGS 00 74 00 SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA. Also, incorporate the following CCRs: CCR 8681, revised requirements to ensure adherence to all appropriate PPE in paragraphs "Activity Regulations" (1.5.1) and "Shipyard Regulations" (1.5.3); CCR 8683, updated Specifier Note and paragraph "Working Hours" (1.5.5) to reflect the work schedules for various regions.
Aug-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 3 In response to CCR 8819, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and in paragraph "Data Required" (1.3.1)
Aug-2020 N UFGS 01 30 00 Administrative Requirements C 4 In response to CCRS 8820 and 9015, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01, updated paragraph "Formal Partnering" (1.12.1), and added paragraph "MOBILIZATION" (1.14).
Aug-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 5 In response to CCR 8821, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01
Aug-2020 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 1 In response to the following CCRs: CCR 8738, clarified adverse weather requirements and schedule modifications required due to non-work days in paragraph "Anticipated Weather Lost Work Days" (1.3.1.2); CCRs 8822 and 9013, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "PRE-CONSTRUCTION SCHEDULE REQUIREMENT" (1.2).
Aug-2020 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 3 In response to the following CCRs: CCR 8739, paragraph "Construction Activities" (1.10.2.5.6) has been updated to clarify federal holidays; CCR 8891, clarified schedule deliverables due from the contractor and added checklists for the KTR as attachments (found under Related Materials) ; CCR 8971, revised Note in Submittals Article regarding Design-Build Requirements; and CCR 8823, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: updated paragraphs "Project Baseline Schedule" (1.2.2), Submittal Article SD-01, and "DESIGNATED PROJECT SCHEDULER" (1.9).
Aug-2020 N UFGS 01 35 26 Governmental Safety Requirements C 10 In response to CCR 8826, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "ACCIDENT PREVENTION PLAN (APP)" (1.8).
Aug-2020 N UFGS 01 45 00.00 20 Quality Control C 7 In response to the following CCRs: CCR 8960, the Note pertaining to paragraph "Registered Fire Protection Engineer" (1.5.8) has been revised for clarity; CCR 8961, paragraph "QC Administrative Assistant" (1.5.10) has been removed to align with the other QC sections; CCR 8827, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: revised Submittal Article SD-01 and paragraph "CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN" (1.17).
Aug-2020 N UFGS 01 45 00.10 20 Quality Control for Minor Construction C 2 In response to CCR 8828, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and Note and to paragraph "QC PLAN" (1.6).
Aug-2020 N UFGS 01 57 19 Temporary Environmental Controls C 4 In response to CCR 8832, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and paragraph "ENVIRONMENTAL PROTECTION PLAN" (1.7); under paragraphs "Stormwater Pollution Prevention Plan" (3.2.1.1) and "Stormwater Notice of Intent for Construction Activities" (3.2.1.2) added note and text.
Aug-2020 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 3 Additional change made regarding CCR 8507, the section has been updated to clarify requirements for surplus soil disposal at Camp Lejenue (1.4.6.1.2). In response to CCR 8833, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under SD-01 and in paragraph "Notice of Construction (NOC) and Notice of Completion" (1.5.3.6).
Aug-2020 N UFGS 01 58 00 Project Identification C 1 In response to CCR 8950, revised Specifier Note in paragraph Quality Control (1.3) for additional guidance.
Aug-2020 N UFGS 07 21 13 Board and Block Insulation C 2 In response to CCR 8689, updated phrasing used in SPECIAL WARRANTIES (1.8) for the start of the warranty period to include "or Substantial Completion".
Aug-2020 N UFGS 07 27 19.01 Self-Adhering Air Barriers C 2 In response to CCR 8741, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 07 27 26 Fluid-Applied Membrane Barriers C 2 In response to the following CCRs: 8742, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01; and 8779, added Specifier Note and dry film thickness requirements to paragraph "Installation of Fluid-Applied Membrane Air Barrier" (3.3.3) .
Aug-2020 N UFGS 07 27 36 Spray Foam Air Barriers C 2 In response to CCR 8743, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 07 41 13 Metal Roof Panels C 3 In response to CCR 8778, updated supporting steel tolerances to reflect industry standards in paragraph "Erection Tolerances" (3.8.1).
Aug-2020 N UFGS 07 42 63 Fabricated Wall Panel Assemblies C 4 In response to CCR 8748, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 08 71 00 Door Hardware C 3 In response to CCR 4895, the Specifier Note in "Locks and Latches" (2.3.5) has been revised to reflect the latest door locking system specified in the Unaccompanied Housing FC.
Aug-2020 N UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System C 2 In response to CCR 6045, replaced "Vulkem 245" with "Stoneflex MP7" in Table II for Vendor Stonhard's sealant.
Aug-2020 N UFGS 09 90 00 Paints and Coatings C 5 In response to the following CCRs: CCR 3281, corrected metric equivalent measurements in "Existing Surfaces with a Bituminous or Mastic-Type Coating" (3.5.6), "Concrete and Masonry" (3.6.1), and "New[, Existing Uncoated,][ and ][Existing Coated] Plywood and Wood Surfaces, Except Floors" (3.7.1); CCR 4282, added the options of corrosive environments to "Exterior Paint Tables" (3.15.1), EXTERIOR GALVANIZED SURFACES, "G" and "H"; CCR 6392, removed references to SCS Global; CCR 6869, removed "MPI 7" from References and replaced "MPI 7" with "MPI 6" in "Exterior Paint Tables" (3.15.1), Division 6 "A"; and CCR 8722, capitalized "Contractor" throughout.
Aug-2020 N UFGS 10 22 26.13 Accordion Folding Partitions C 2 In response to CCR 8746, "Statement of Code Compliance" and "Statement of Standards Conformity" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 10 22 26.23 Coiling Partitions C 2 In response to CCR 8747, "Statement of Code Compliance" and "Statement of Standards Conformity" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Nov-2020 A UFGS 23 09 13 Instrumentation and Control Devices for HVAC C 1 Updated ADA sensor height requirement in subpart 3.1.7.1 in response to CCR 7477.
Nov-2020 A UFGS 41 24 26 Hydraulic Power Systems C 1 Deleted all references to SAE J1165 and replaced with ISO 4406 in response to CCR 1788.
Nov-2020 A UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks C 1 Updated subpart 2.4.1 in response to CCR 7770. Updated note in subpart 2.5. Added subparts 2.6.1.1 and 2.6.2.1. Updated subpart 2.14.1 in response to CCR 9187.
Nov-2020 A UFGS 33 56 19 Fuel Impermeable Liner System C 1 Updated notes in subparts 2.1.3, 2.2.7, 3.5.1 and 3.7 in response to CCR 4564.
Nov-2020 N UFGS 01 14 00 Work Restrictions C 11 Updated Additional Personnel Requirements (1.5.1.2) and subparagraph to clarify work restrictions for secure facilities. Incorporated the following CCRs: CCR 9027, revised General Note in relation to tailoring options included in the section; CCR 9028, corrected tailoring in Part 1; and CCR 9029, corrected subpart hierarchy by moving "Unarmed Escort Services" paragraph into "CONTRACTED SERVICES FOR NBK BANGOR, SILVERDALE, WA. (1.16).
Nov-2020 N UFGS 01 78 23 Operation and Maintenance Data C 1 In opening note, incorporated Navy thresholds, from cancelled Navy ECB 2014-01, that require use of UFGS 01 78 24.00 20 FACILITY eOMSI
Nov-2020 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 2 In opening Note, incorporated Navy thresholds, from cancelled Navy ECB 2014-01, that require use of UFGS 01 78 24.00 20, and updated Facility Data Workbook.
Nov-2020 N UFGS 01 58 00 Project Identification C 2 [Update 3/18/21: per CCR# 9845, reference to ARRA has been removed from the sign details in all Related Materials.] Updated both the Specifier Note under PROJECT IDENTIFICATION SIGN (1.4) and the Related Materials (PDF/ZIP attachments)
Nov-2020 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks C 1 (UFGS-33 01 50.60) In response to CCR 7720, paragraph "TANK CLEANING" (3.7) has been updated.
Nov-2020 N UFGS 33 52 10 Fuel Systems Piping (Service Station) C 1 Updated Reference Article and paragraphs "Contractor Qualifications" (1.4.1), "Flange Gaskets, Non-Electrically Isolating" (2.2.3), "Insulating Flange Kits, (Electrically Isolating)" (2.3.2), and "Swing Type Check Valves" (2.6.3) to clarify and incorporate CCRs.
Nov-2020 N UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) C 2 Updated Reference Article, Submittals, and paragraphs "Contractor Qualifications" (1.5.1), "Insulating Flange Kits, (Electrically Isolating)" (2.2.8), "Flange Gaskets, Non-Electrically Isolating" (2.2.10), and "Flange Gaskets, Metallic" (2.2.11) to clarify and incorporate CCRs.
Nov-2020 N UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank C 1 Updated Reference Article and paragraphs "Weld Inspector Certification" (1.9.4), "Qualifications of API Std 653 Inspector" (1.9.7), "Mechanical Tape Level Gauge" (2.13.5) to clarify and incorporate CCRs.
Nov-2020 N UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) C 1 Updated paragraph "Filters" (2.29.1.3).
Feb-2021 A UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements C 1 Deleted redundant drawing sizes from paragraph 1.1.1 in response to CCR 8754 and updated paragraph 2.1.1 in response to CCR 8756.
Feb-2021 A UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems C 1 Deleted editing note in paragraph 2.1.2, corrected formatting issues in paragraph 2.2, and updated editing note in paragraph 3.3.6 in response to CCR 8929.
Feb-2021 A UFGS 02 61 13 Excavation and Handling of Contaminated Material C 1 Deleted and updated references in response to CCRs 2245 and 4992. Updated submittals in response to CCR 6032.
Feb-2021 A UFGS 07 54 19 Polyvinyl Chloride Roofing C 3 Updated NRCA reference in response to CCR 9568.
Feb-2021 A UFGS 21 13 25 High-Expansion Foam System, Fire Protection C 1 Updated Flanges and Gaskets paragraph in response to CCR 7781. Corrected formatting issues in response to CCR 8444. Updated paragraph 2.3.9 in response to CCR 9292.
Feb-2021 A UFGS 23 81 00 Decentralized Unitary HVAC Equipment C 1 Deleted contents of paragraph 2.3.4 and added note.