Date:
05-22-2020
Status:
Archive (Canceled)
Archived / Rescinded Date:
05-22-2022
This ECB highlights changes associated with Change 6 of UFC 3-410-01 HVAC Systems and HVAC Controls changes in UFC 3-410-2 Lonworks ® Direct Digital Control for HVAC and other Local Building Systems, with Change 1and associated specifications, noted below in part 5 of this ECB, for changes related to Variable Refrigerant Flow (VRF).
Page(s):
7
View/Download:
Federal Facility Criteria: