Date:
11-28-2017
Change / Revision Date:
11-19-2021
Status:
Active
This Engineering and Construction Bulletin (ECB) requires the use of electronic format for developing red-lines, maintaining as-builts, and delivering record drawings throughout the construction process for all USACE Army projects.
Page(s):
2
View/Download:
Federal Facility Criteria: