Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
29
Spec. Division
33 - Utilities
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2016 N C 2 Added section references referring to UFGS Section 33 01 30.16 TV Inspection of Sewer Pipelines
Nov-2015 N C 1 Removed reference to UFGS Section 33 01 30.16 in subpart 3.5.3, as this section is not yet published
Aug-2015 N N New UFGS Section; Superseding UFGS 33 05 23.19 Trenchless Excavating using Microtunneling