View/Download
PDF   ZIP  
Publish Date
Pages
27
Spec. Division
23 - Heating, Ventilating, and Air Conditioning
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2024 N C 1 In response to CCR 14821, removed references to UFGS 21 13 20.00 20 (archived 05/24) by deleting paragraph Fire Foam Extinguishing Systems (1.2.3) and related paragraph under Sequencing (1.4).
Feb-2020 N N New specification covering the requirements for high-pressure, preconditioned air units, ductwork and controls for aircraft cooling systems in conjunction with UFC 4-211-01, Aircraft Maintenance Hangars.