Status
Retired / Superseded
Publish Date
Archived / Rescinded Date
Change Notice
<p>Combined with UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems</p>
Spec. Division
23 - Heating, Ventilating, and Air Conditioning
History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
Oct-2006 | N | Jun-2006 | D | Combined with UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. | |
Jun-2006 | N | Jun-2006 | R | Title changed from CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS; Reference and Section References (SRF) updated |