Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
17
Spec. Division
08 - Openings
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2020 A R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRS as well as correcting formatting, references, and submittals.
Aug-2018 A C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2015 A C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Feb-2012 A N Superseding UFGS 08 62 00 Skylights