Status
Active
Publish Date
Pages
26
Spec. Division
08 - Openings
CCR
History: Below is a listing of the Revisions and Changes made to this UFGS.
| KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
|---|---|---|---|---|---|
| ACTION | N New | R Revision | C Change | D Deletion |
| Release | PA | Date | Action | Change # | Nature of Change or Revision |
|---|---|---|---|---|---|
| Feb-2022 | N | Aug-2020 | C | 1 | In response to CCR 10430, corrected specifier note for electrical CSI division, provided Army tailoring option for specific submittals within Submittal Article (1.2), and removed brackets from Thermal Performance paragraph (1.5.2) |
| Aug-2020 | N | Aug-2020 | R | This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals. | |
| Nov-2018 | N | Aug-2011 | C | 4 | Added note restricting use of steel windows in humid and ESC C3-C5 locations. |
| Aug-2018 | N | Aug-2011 | C | 3 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
| May-2016 | N | Aug-2011 | C | 2 | CCR 4166: Removed subpart 2.2.6 and reference ASTM A167 |
| Aug-2015 | N | Aug-2011 | C | 1 | UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements". |
| Aug-2011 | N | Aug-2011 | R | Modified references in subpart 2.7.2 | |
| Nov-2008 | N | Nov-2008 | R | Corrected Reference Identifier (RID) tags for LEED | |
| Aug-2008 | N | Aug-2008 | R | Added ATFP requirements | |
| Jul-2006 | N | Jul-2006 | R | Added NASA requirements and sustainable design requirements |