Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
26
Spec. Division
08 - Openings
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Feb-2022 N C 1 In response to CCR 10430, corrected specifier note for electrical CSI division, provided Army tailoring option for specific submittals within Submittal Article (1.2), and removed brackets from Thermal Performance paragraph (1.5.2)
Aug-2020 N R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Nov-2018 N C 4 Added note restricting use of steel windows in humid and ESC C3-C5 locations.
Aug-2018 N C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
May-2016 N C 2 CCR 4166: Removed subpart 2.2.6 and reference ASTM A167
Aug-2015 N C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2011 N R Modified references in subpart 2.7.2
Nov-2008 N R Corrected Reference Identifier (RID) tags for LEED
Aug-2008 N R Added ATFP requirements
Jul-2006 N R Added NASA requirements and sustainable design requirements