Series
3 - DISCIPLINE-SPECIFIC CRITERIA
3-500: ELECTRICAL
CCR
Summary
This UFC provides criteria for the design of engine-driven generator systems for standby and prime power applications. Information provided here must be used by engineers in the development of the plans, specifications, calculations, and Design/Build Request for Proposals (RFP) and serves as the minimum design requirements. Project conditions may dictate the need for a design that exceeds these minimum requirements.
Superseded Versions