This UFC provides minimum technical requirements and guidance for new construction and modernization of elevator systems, and their supporting structure, building systems, and components.

Superseded Versions

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Jun-2018 A R 12021

3-3.1 Hoistway Pit Entrapment Protection

Provide a minimum horizontal clearance of 20 inches (508 mm) between the side of the 
elevator platform/cab and any one wall of the elevator hoistway.  A horizontal clearance 
of 20 inches (508 mm) wide X 36 inches long (915 mm) must be maintained for the 
entire height of the hoistway.  Elevator and building components must not encroach on 
the minimum clearances or block personnel passage from the elevator pit to the \1\ pit 
entrapment area. 

This sentence needs to specify that this only applies to a single elevator and not a bank of elevators.