Status
Inactive
View/Download
Publish Date
Pages
176
Series
3 - DISCIPLINE-SPECIFIC CRITERIA
3-200: CIVIL / GEOTECHNICAL / LANDSCAPE ARCHITECTURE
Summary

The purpose of this design guide (DG) provides guidance for the basic design, installation and operation of ground water extraction and ground water injection systems for the cleanup of contaminated ground water, exclusive of any treatment systems. General guidance on ground water extraction (GWE) already exists. The intent of this DG is to document lessons learned from expedience and to provide a systematic approach to the installation, operation and trouble-shooting of systems.