Status
Active
View/Download
Publish Date
Pages
2
Final Incorporation
Upon expiration, the policy and guidance in this ECB will be permanently incorporated into a revision of UFGS 01 78 00.
Category
Directive & Guidance
Summary
This Engineering and Construction Bulletin (ECB) requires the use of electronic format for developing red-lines, maintaining as-builts, and delivering record drawings throughout the construction process for all USACE Army projects.
Superseded Versions