Status
Active
View/Download
Publish Date
Size
44.6 MB
Pages
148
Service Type
Air Force Active Duty
Summary

This Installation Facilities Standards (IFS) document is part of the Air Force Corporate Facilities Standards (AFCFS) program and provides facility design standards for Joint Base Langley-Eustis, Vol. 1: JBLE Langley. IFS replaces the Architectural Compatibility Plan (and similar legacy documents), as a component plan of the Installation Development Plan (IDP). For more information contract the Base Civil Engineer.