Air Barrier Systems in Buildings

by Wagdy Anis, AIA
Wiss, Janney, Elstner Associates, Inc.

Last updated: 02-12-2007

Introduction

This paper reviews the problems created by infiltration and exfiltration in buildings, and the design considerations of an air barrier system to control the problems. It explains the air pressures on buildings, the fundamentals of controlling those pressures, air barrier material requirements, combination "air and vapor barriers," and the required properties of air barriers systems. Specific designs will be reviewed, and warm-side air and vapor barriers vs. cold-side air barrier systems compared. The complexities of the "airtight drywall approach," or "ADA," (Lstiburek and Lischkoff, 1986) are also discussed. Finally, the paper will review roof air barrier concepts.

Description

Figure showing the diffuse flow and orifice flow in a linear pathway

Fig. 1

Infiltration and exfiltration of air in buildings have serious consequences, because they are uncontrolled; the infiltrating air is untreated and can therefore entrain pollutants, allergens, and bacteria into buildings. The accompanying change in air pressures can disrupt the delicate pressure relationships between spaces that HVAC systems create by design, in buildings such as hospitals, where patients' very lives may depend upon maintaining those relationships, and labs, where pollutant control is essential. Disrupted air pressure relationships can move pollutants from spaces where they should be contained, into other spaces where they are not desired. For example, pollutants can move from such areas as storage rooms or garages under buildings into living or working spaces and cause indoor air quality problems. Another serious consequence of infiltration and exfiltration through the building envelope is the condensation of moisture from the exfiltrating air in northern climates, and from infiltrating hot humid air in southern climates, causing mold growth, decay, and corrosion that cause health problems and premature building deterioration. Unlike the moisture transport mechanism of diffusion, air pressure differentials can transport hundreds of times more water vapor through air leaks in the envelope over the same period of time (Quirouette, 1986). This water vapor can condense within the envelope in a concentrated manner, wherever those air leaks may be (Fig. 1).

Air leaks through the building enclosure can take one of several forms:

  1. Orifice flow
  2. Diffuse flow
  3. Channel flow

Orifice flow occurs when the air entry and exit are in a linear pathway, such as in the crack between a window rough opening and its frame (Fig. 1).

Figure showing air moving throught the vapor barrier, up through the wall and leaving concentrated condensation in the wall.

Fig. 2: Channel Flow

Diffuse flow happens when materials are used in the envelope that are ineffective in controlling air infiltration and exfiltration due to many cracks or their high permeance to air, such as fibrous insulation or uncoated concrete block. Channel flow is probably the most common and serious of all types of air leaks and is shown in Fig. 2. The air entry point and exit point are distant from each other, giving the air enough time to cool below its dew point and deposit moisture in the building enclosure.

Lastly, air infiltration and exfiltration are the cause of unnecessary energy consumption in buildings due to the added heating and cooling loads and the additional humidification or dehumidification needed.

Air Pressures That Cause Infiltration and Exfiltration

There are three major air pressures on buildings that cause infiltration and exfiltration:

Wind

Figure shwoing flow around a building in a boundary layer.

Fig. 3

The average annual wind pressure on buildings is of significance in calculating energy or moisture-related air leakage in buildings. When averaged out over the course of the year, it is about 10-15 mph (0.2-0.3 psf) (10-14 Pa) in most locations in North America. (Wind and Air Pressures on the Building Envelope) Wind pressure tends to pressurize a building positively on the façade it is hitting, and as the wind goes around the corner of the building it cavitates and speeds up considerably, creating especially strong negative pressure at the corners and less strong negative pressure on the rest of the building walls and roof (Figs. 3 and 4), (Hutcheon and Handegord, 1983).

Figure showing the plan view of a roof with contours showing negative pressure distribution.

Fig. 4

Stack Pressure

Figure 5

Fig. 5

Stack pressure (or chimney effect) is caused by a difference in atmospheric pressure at the top and bottom of a building due to the difference in temperature, and therefore, a difference in the weight of the columns of air indoors vs. outdoors in the winter. Stack effect in cold climates can cause infiltration of air at the bottom of the building and exfiltration at the top, as seen in Fig. 5. The reverse occurs in warm climates with air-conditioning.

Fan Pressure

Fan pressure is caused by HVAC system pressurization, usually positively, which is fine in warm climates but can cause incremental envelope problems to wind and stack pressures in heating climates. HVAC engineers tend to do this to reduce infiltration (and with it, pollution) and disruption of the HVAC system design pressures relationships. Fig. 6 shows each of these pressures separately and a combined diagram.

Figure 6

Fig. 6

Figure showing materials A, B, C, D, and E passing through joints, and then they become assmemblies 1 and 2. These pass through another set of joints and become an air barrier system.

Fig. 7

The U.S. Department of Energy reports that up to 40% of the energy used by buildings for heating and cooling is lost due to infiltration (Pollock, 2001). Using CONTAMW/TRNSYS modeling shows that in newer buildings infiltration is responsible for about 25% of the heating load and 4% of the cooling load (Emmerich, and Persily, 1998). To control air infiltration and exfiltration in buildings, a conceptual approach to airtightening is needed, called an air barrier "system." The Canadian National Building Code, and more recently the Commonwealth of Massachusetts' building code, takes this comprehensive and conceptual approach, namely requiring an air barrier system in the building envelope, as a code requirement. A continuous air barrier system is the combination of interconnected materials, flexible sealed joints and components of the building envelope that provide the airtightness of the building enclosure and separations between conditioned and unconditioned spaces (Air Leakage Control) (Fig. 7), (Lux and Brown, 1986).

The concept is to select and target a component of the wall or roof that is air impermeable and to deliberately make it an airtight "assembly" by sealing the joints and penetrations. This assembly of materials is connected to adjacent assemblies or components such as windows, doors, or the roof air barrier component. The air barrier system above grade is also connected to the foundation walls and basement slabs to complete the air barrier system of the building. Air tightening below-grade walls and slabs prevents entry of organic gases, such as radon, and pollutants from agricultural activities and brownfields, due to depressurization of spaces with their enclosure in contact with the soil.

The important features of an air barrier system in a building are: Continuity, Structural Support, Air impermeability, and Durability.

Continuity

To ensure continuity, each component serving its role in resisting infiltration such as a wall or a window or a foundation or a roof must all be interconnected, to prevent air leakage at the joints between materials, components, assemblies, and systems.

Structural Support

Effective structural support requires that any component of the air barrier system must resist the structural loads that are imposed on that component by wind, stack effect, and HVAC fan pressures without rupture, displacement or undue deflection. This load must then be safely transferred to the structure. Design consideration must determine adequate resistance to these pressures by fasteners, adhesives, etc.

Air Impermeability

Materials chosen to be part of the air barrier system should be chosen with care to avoid selecting materials that are too air-permeable, such as fiberboard, perlite board, and uncoated concrete block. The air permeance of a material is measured using ASTM E 2178 test protocol and reported in Litres/Second per Square Meter at 75 Pa pressure (cfm/sf at 0.3" w.g or 1.57 psf). The Canadian and Massachusetts codes consider 0.02 L/s.M²75Pa (0.004 cfm / sf 1.57 psf ), which happens to be the air permeance of a sheet of ½" unpainted gypsum wall board, as the maximum allowable air leakage for a material that can be used as part of the air barrier system for the opaque enclosure; the same number is required by the Advanced Buildings Benchmark (New Buildings Institute), and ASHRAE SP 102 (Advanced Energy Design Guide: Small Office Buildings). The Air Barrier Association of America considers that number the industry standard for air barrier materials. This maxium allowable air permeance for materials is more airtight than the requirements for windows and curtain walls, but it must be remembered that windows and curtain walls are assemblies of materials and also these materials are more resistant to damage due to condensation than ordinary building materials. It is to be expected that when fairly airtight materials are assembled together by sealing, taping screws, etc., that the assembly will leak more air than the original material that is being used as the basic material. Also, when these assemblies are joined together into a whole building, the building enclosure will leak more air than the individual assemblies joined together in the first place. So in order to achieve a reasonable end result, the basic materials selected for the air barrier must be quite air-impermeable.

Durability

Materials selected for the air barrier system must perform their function for the expected life of the structure; otherwise they must be accessible for periodic maintenance, such as elastomeric paint coatings on concrete block.

In summary, air barrier system code requirements may require:

Figure 8

Fig. 8

In addition, other pressure differentials within buildings should be controlled by the following methods:

Figures 9 and 10

Fig. 9 and Fig. 10: Plenums connected to the exterior enclosure can move moist air through these assemblies.

Figure 11 shows the air movement within an enclosure that has warm air and cold air on either side.

Fig. 11: Convection of moist air in enclosure assemblies can cause problems.

MATERIAL AIR LEAKAGE
Thickness of Non-Measureable Airflow Measureable Airflow CFM
@0.3"
wg
L/(s/m2)
@75 Pa
0.006"*Polyethylene0.315"Plywood0.0010.0067
0.060"Roofing membrane0.63"Waferboard0.0010.0069
0.106"Modified asphalt torched-on0.5"Exterior Gypsum0.0020.0091
0.001"*Aluminum foil0.433"Waferboard0.0020.0108
0.060"Sheet asphalt peel and stick0.5"Particle Board0.0030.0155
0.374"Plywood*Non-perforated spun-bonded polyolefin0.0040.0195
1"Extruded polystyrene0.5"Interior gypsum board0.0040.0196
1"Foil-backed urethane    
0.5"Cement board    
0.5"Foil-backed gypsum board    

*Membranes must withstand air pressures in both directions without displacement or damage. If not fully adhered, they must be sandwiched between two board materials.

Figure showing the Tyvek HomeWrap™ material. The 25mm cap nails or brick tiles need to be installed 150mm into the stud.

Fig. 12

If house-wraps and other film membranes are not fully supported on both sides, as is the case in a brick cavity wall, they cannot support negative wind loads without tearing at the staples and brick anchors or rupturing under load (Bosack and Burnett, 1998). House-wraps in brick cavity walls displace under negative wind pressure and "pump" building air into the assembly, potentially causing condensation in cold climates. While testing in Canada to pre-qualify its membrane for use as an air barrier material, a manufacturer of spunbonded polyolefin discovered that to withstand negative wind pressures, the membrane needed to be stronger, and installed with fasteners having 1" diameter plastic washers, or a brick tie must be installed every 6" (150 mm) into the stud and 16" (400mm) apart (Fig. 12). Alternatively continuous strapping with a fastener every 12" (300mm) may be used. Note that products sold in Canada and the U.S. with the same name may not have the same air leakage or strength properties.

Line graph : As the Air Leakage Pressure rises from 10(sup-2) to 10(sup1) and as the pressure difference rises from 1 to 1,000, the polyethylene's pressure increases while the pressure difference increases. Before reaching the air leakage rate of 10(sup0) the pressure difference of the polyethylene begins to decrease. As the presure difference of the wall increases, the air leakage rate increases.

Fig. 13: Polyethylene air barrier ruptures in a wall with glass-fiber batt insulation

It is even more difficult to make polyethylene into an air barrier. It lacks structural support when it is against glass-fiber batts and has the inherent quality of displacing and stretching, even rupturing, under high wind loads. It is also difficult to seam to itself or other materials (Fig. 13). Fastener holes through polyethylene can stretch and compromise its airtightness (Shaw, 1985).

Materials that do not qualify as air barrier materials without additional coatings are (Bombaru, Jutras and Patenaude, CMHC, 1988):

Of course there are many products formulated to qualify as air barrier materials. Some of these, as well as specifications, technical help, contractor and workmen training and certification is provided by the Air Barrier Association of America.

Air Barrier Materials

The simplest approach to airtightening a wall is to select one of the layers such as the sheathing and to airtighten it using durable tapes, adhesive sheet products, liquid-applied materials, or the like. Walls constructed out of materials that are very permeable to air, such as concrete block, must be airtightened using an applied elastomeric (flexible) coating, either as a specially formulated paint, or a specially formulated air barrier sheet product, or a liquid-applied spray-on or trowel-on material. Transition peel-and-stick membranes are most commonly used at window and door perimeters, or when changing materials or wall systems (Figs. 14 and 15). Alternatively, a sheet membrane such as a peel-and-stick membrane can be used on the whole wall.

Figure 14: Photo of peel-and-stick membrane trim work and transitions being applied.Figure 15: Photo of liquid-applied air barrier applied to balance of wall.

Left: Fig. 14: Peel-and-stick membrane trim work and transitions being applied. Georgetown Law School
And Right: Fig. 15: Liquid-applied air barrier is applied to balance of wall. Georgetown Law School
(Shepley Bulfinch Richardson and Abbott, Architect)

Metal backpans are often used as part of the air barrier system in the spandrel areas of curtain walls.

Location of the Air Barrier

The air barrier, unlike the vapor retarder, (since its function is to stop air movement, not control diffusion), can be located anywhere in the envelope assembly. If it is placed on the predominantly warm, humid side (high vapor pressure side) of the enclosure, it can control diffusion as well, and would be a low-perm vapor barrier material. In that case, it is called an "air and vapor barrier." If placed on the predominantly cool, drier side (low vapor pressure side) of the wall, it should be vapor permeable (5-10 perms or greater).

Figure 16 shows the second and first floors being warm and separated from the knee wall by a blocker. The knee wall area remains cold.

Fig. 16

Finally, the complexities of airtightening a building using the interior finish gypsum board are worth highlighting (Fig. 16). The airtight drywall approach or "ADA", as it is known in Canada, using the interior drywall as the airtight plane, (Lstiburek and Lischkoff, 1986) is useful in residential work where renovation is not expected for many years. In commercial work however, the intent of the designer will most likely be lost to renovation. Also, continual rewiring for data lines compromises the drywall's airtightness as the data contractor punches holes above the ceiling. It is a very complex, three-dimensional problem, and this author's best advice is, "Don't go there."

Air Barriers Subject to Temperature Changes

Air barriers on the exterior side of the insulation are subject to thermal changes and lots of movement due to expansion and contraction; therefore these joints are more difficult to keep airtight for the life of the building due to the stresses applied to the jointing tape or sealant by the thermal cycling over time. The best joint materials for these applications should be used, such as:

Figure 17: Photo showing foam sealant applied to all insulation board edges followed by peel-and-stick modified asphalt tape on the primed insulation sheathing boards used as the air barrierFigure 18: Photo showing foam sealant applied to all insulation board edges followed by peel-and-stick modified asphalt tape on the primed insulation sheathing boards used as the air barrier.

Left to right: Figs. 17 and 18: The above two photos show foam sealant applied to all insulation board edges followed by peel-and-stick modified asphalt tape on the primed insulation sheathing boards used as the air barrier. Boston College Administration Building
(Shepley Bulfinch Richardson and Abbott, Architect)

Roof Air Barriers

The roof membrane can be considered an air barrier since it is designed to withstand wind loads if it is fully adhered or hot- or cold-mopped. Mechanically fastened and ballasted roof systems, because they displace and momentarily billow or pump building air into the system, do not perform the required functions of containing air without displacement. In those cases, another air barrier must be selected in the system. Either a peel-and-stick air and vapor barrier on the inboard side of the roof system (interior conditions and weather dependent), or taped gypsum underlayment board beneath the insulation can be used in a system with adhered underlayers of thermal protection board and insulation. Those layers must be designed to withstand maximum wind loads without displacement. Because of the critical importance of continuity with the wall air barrier, a pre-construction conference on the air barrier system must include the trades involved in the air barrier system, such as the wall air barrier subcontractor, the window subcontractor, the sealant subcontractor, and also the roofing subcontractor, to discuss the connection between the roof air barrier and the wall air barrier, as well as the sequence of making an airtight and flexible connection. It is also important to ensure that the materials being joined together are compatible.

Penetrations into roof systems, such as ducts, vents, and roof drains, must be dealt with, perhaps by using spray polyurethane foam (or other sealant) or membranes to airtighten those penetrations at the targeted air barrier layer.

Conclusion

An air barrier system is an essential component of the building enclosure so that air pressure relationships within the building can be controlled, building HVAC systems can perform as intended, and the occupants can enjoy good indoor air quality and a comfortable environment. HVAC system size can be reduced because of a reduction in the "fudge factor" added to cover infiltration and unknown factors, resulting in reduced energy use and demand. Air barrier systems in the building envelope also control concentrated condensation and the associated mold, corrosion, rot, and premature failure; and they improve and promote durability and sustainability. Building codes should require air barriers systems, and building designers and builders should be aware of the negative consequences of ignoring building airtightness.

Applications

Buildings with air barrier systems:

Relevant Codes and Standards

Additional References

WBDG

Products and Systems

Building Envelope Design Guide: Wall Systems, Cast-in-Place Concrete Wall Systems, Exterior Insulation and Finish System (EIFS), Masonry Wall Systems, Panelized Metal Wall Systems, Precast Concrete Wall Systems, Thin Stone Wall Systems
Federal Green Construction Guide for Specifiers:

Air Barrier Association of America

WBDG Services Construction Criteria Base