NAVFAC Sustainable Development Program - Case Studies
Department of Energy's Federal Energy Management Program's High Performance Federal Buildings Database
All FY09 projects and beyond for new buildings and major renovations that will be LEED certified by the US Green Building Council will be required to develop, submit and post online a case study on the Department of Energy's Federal Energy Management Program's High Performance Federal Buildings (HPBD) Database (http://femp.buildinggreen.com/).
HPBD Database case studies for USGBC LEED certified buildings are also referenced and linked to from the LEED Projects & Case Studies Directory on the USGBC website. The final LEED certification email to the Project Administrator of a LEED certified project includes information on the HPBD Database case studies.
Contract Requirement Language PDF 39 KB, 1 pg
Instructions to Develop and Submit a Case Study
- Instructions PDF 70 KB, 1 pg
- Attachment 1, HPBD Paragraph Data Fields PDF 73 KB, 2 pgs
- Attachment 2, DOE High Performance Buildings Database: Available Input Fields PDF 758 KB, 29 pgs
- Attachment 3, Design Strategies PDF 200 KB, 22 pgs
Department of Navy HPFB Database Case Studies
- Bachelor Quarters, Naval Training Center
Great Lakes, IL – LEED version 1 Certified - Building 33, Washington Navy Yard
Washington, DC - Building 850, Naval Base Ventura County Public Works Department
Port Hueneme, CA – LEED version 2.0/2.1 Gold - Bachelor Quarters (FY03 P-301), Naval Base Kitsap-Bremerton
Bremerton, WA – LEED version 2 Certified - Personnel Support Facility (FY03 P-137), Naval Amphibious Base
Norfolk, VA – LEED version 2 Silver - Bachelor Quarters (FY03 P-532), Naval Weapons Station
Yorktown, VA – LEED version 2 Certified - Drill Hall (FY06 P-667), Naval Station
Great Lakes, IL – LEED version 2 Gold - Police and Special Operations Facility (FY07 P-406), Naval Amphibious Base
Norfolk, VA – LEED version 2 Silver
Other Case Studies of Department of Navy Buildings
- Naval Facilities Engineering Command Headquarters Building (07-1999) PDF 1.7 MB, 21 pgs
- WBDG Case Study: NAVFAC Building 33