- Achieving Sustainable Site Design through Low Impact Development Practices
- Balancing Security/Safety and Sustainability Objectives
- Construction Phase Cost Management
- Construction Waste Management
- Cost Impact of the ISC Security Criteria
- Designing Buildings to Resist Explosive Threats
- Energy Analysis Tools
- Energy Codes and Standards
- Estimating
- Life-Cycle Cost Analysis (LCCA)
- Planning and Conducting Integrated Design (ID) Charrettes
- Threat/Vulnerability Assessments and Risk Analysis
- UFC/ISC Security Design Criteria Overview and Comparison
- Value Engineering
Strategic Project Planning & Development
Last updated: 06-21-2010
Within This Page
Overview
Excellence in Project Management is achieved through effective management and oversight of a complex process unique to each project. Contemporary institutions and organizations are increasingly realizing that traditional forms of management—based on the same approach to every project—cannot meet the needs of today's economic, social, and business environment. Additionally, the processes can be streamlined based on technologies and efficiencies not previously available. See our resource guide for more information on best practices.
This section of the WBDG provides guidance on integrated planning and development processes to establish an owner's expectations for project scope, budget, and schedule. It also provides guidance on managing the team during the planning, design, construction, and occupancy phases of a project.
Project Requirements
Project inception and preliminary planning require thoughtful definition of goals and needs (Project Scope); master planning to accommodate anticipated future needs; evaluation of project alternatives; identification of site requirements; funding requirements; budget authorization cycles and/or financial impacts; and project phasing. There are tools available that help define the goals and objectives for the project that let all stakeholders have a voice in making the project successful. The risks associated with making mistakes in this part of the process are great, since their impact will be felt across the project development process and in the final project results. For more information, see links below in the Major Resources section.
Delivery Methods
There are many approaches to achieve successful project design and construction. The Delivery Methods are driven by the project's scope, budget, and schedule. Some of these methods include Traditional (Design/Bid/Build), Integrated Delivery Process (where all stakeholders have a financial incentive to work together to produce the desired results), CM (also called CMc, or Construction Manager), Design-Build, Bridging, Lease/Build and Lease Buy Back. The selection of a delivery method will in turn influence the team composition, schedule, budget, and management plans to be followed throughout the process.
Project Management Plans
A Project Management Plan (PMP) documents key management and oversight tasks and is updated throughout the project as changes occur. The plan includes definition of an owner's program goals, technical requirements, schedules, resources, budgets, and management programs. It also provides a vehicle for including efficiencies in the design and construction phases of all buildings. It will also serve as the basis for completed construction documents and outline the commissioning plan for finished execution.
Design Stage Management

Once a design team has been agreed upon and assembled, the owner needs to coordinate and manage the project's design phases. Design management requires the oversight of schedules and budgets; review of key submissions and deliverables for compliance with program goals and design objectives; verification of stakeholder input for inclusion; verification of construction phase functional testing requirements; and appropriate application of the owner's design standards and criteria. This stage should also define the criteria for assessing quality measurement to ensure the project's success. Determining appropriate goals and objectives at the beginning of the process, during a visioning session, and measuring their implementation over the life cycle of building and construction has been proven to increase overall building quality and reduce project costs and timing to delivery.
Delivering and Measuring Building Quality
Good design is derived from a complex and creative process encompassing a wide range of activities, elements and attributes. A standard for measuring building quality has been created by the Construction Industry Council (CIC) and it measures the key attributes that constitute good design and produces high performance buildings. The CIC has developed the Design Quality Indicator (DQI) a standard method of assessing the quality of buildings in three main areas: Functionality, Build Quality and Impact. Functionality is concerned with the arrangement, quality and inter-relationships of space and the way in which the building is used. Build Quality relates to the engineering performance of a building which includes structural stability and the integration and robustness of systems, finishes and fittings. Impact refers to the building's ability to create a sense of place and have a positive effect on the local community and environment. DQI also encompasses the wider effect the design may have on the art of building and architecture. It is the interplay between all of these factors that creates a truly high performance building. The overlapping nature is demonstrated below:

Construction Stage Management
This stage should include all of the components involved with construction and documentation for the project. The team members involved in this phase will be responsible for Requests for Information (RFIs), Change order management, conflict resolution, inspections, submittal reviews, adhering to schedules and coordinating timely payments. Oversight in this area is critical because it has significant impact on a project's total cost.
Using Building Information Modeling (BIM)
Building Information Modeling (BIM) is the process of generating and managing building data during its life cycle Typically it uses three-dimensional, real-time, dynamic building modeling software to increase productivity in building design and construction. The process produces the Building Information Model (also abbreviated BIM), which encompasses building geometry, spatial relationships, geographic information, and the quantities and properties of building components. Utilizing BIM has the potential to save project time and cost and increase overall productivity of construction and delivery of building projects with less rework, design, and construction errors.
The advantages of BIM over the traditional design and construction process are significant (source: Construction Delivery Systems, Lorence H. Slutzky, 2008):
- BIM single data entry into one model avoids the opportunity for inconsistency and error of repeated input of identical data in multiple media. Data once entered or altered is available in the single current model available to all.
- BIM design efficiency reduces the cost of design and preparing contract documents.
- BIM base information is uniform and shared with all participants.
- BIM three dimensionality and software identify physical conflicts between elements reducing significant construction delay, and extraordinary additional expense. Where modifications are suggested, the impact of the proposed changes are immediately apparent, subject to evaluation and reconsideration.
- BIM three dimensionality assists in sequencing and constructability reviews.
- Confidence in shop drawing and fabrication accuracy is improved by BIM because the model can provide construction details and fabrication information. More materials can be fabricated more economically off site under optimal conditions due to the confidence in the accuracy of the fabrication.
- BIM can link information to quantify materials, size and area estimates, productivity, material costs and related cost information.
Overall, the BIM digital model becomes a rehearsal of construction and can help identify conflicts and their resolution before actual construction dollars are spent.
Building Commissioning
Commissioning (Cx) is a systematic process of ensuring that building systems perform interactively and effectively according to the design intent and the owner's operational needs. This is achieved by documenting the owner's requirements and assuring those requirements are met throughout the entire delivery process. This involves actual verification of systems performance and integration; comprehensive operation and maintenance (O&M) documentation; and training of the operating personnel. Building Commissioning Services may include Commissioning Plans, Total Building Commissioning, Systems Commissioning, Pre-installation Performance Testing/Commissioning, Re-Commissioning, Retro-Commissioning, and LEED Certification.
Major Resources
Publications
- AIA Handbook on Project Delivery AIA California Council
- Capstone: The History of CM Practice and Procedures by the Construction Management Association of America. McLean, VA, 2003.
- Project Planning Guide by the U.S. General Services Administration.
- A Guide to the Project Management Body of Knowledge (PMBOK® Guide)—4th Edition, Project Management Institute, 2008.
- Design Values – Measuring the Economic Value of Investing in Architecture and Design (PDF 1.10 MB, 8 pgs) by Marc S. Sallette
- APM Body of Knowledge – 5th Edition, Association for Project Management, 2006.
Organizations
- Building Commissioning Association
- Construction Management Association of America
- Design Build Institute of America
- Project Management Institute
- Association for Project Management (APM)
Scheduling Software
Tools
- Construction Waste Management Database
- DQI
- Work Order Management and Asset Tracking solution, Workorderama™ (a complete CMMS)
Sample Construction Related Forms
Construction Phase Forms
Construction Documents Checklists