4.1 Building Enclosure

Click the cells below to choose a level of standard for each attribute. Show Tooltips

IN THIS SECTION:  Envelope - Protective Security  |  Envelope - Natural Hazard  |  Envelope Servicibility  |  Water Penetration Resistance
Moisture and Condensation Control  |  Air Tightness  |  Thermal Performance  |  Building Enclosure Commissioning
Enclosure Acoustic Control  |  Enclosure Service Life

AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Envelope - Protective Security
Blast ResistanceISC Level IIISC Level IIIISC Level IVSite Specific Risk AssessmentBlast Mockup TestingSite PlanningInteragency Security Criteria ASTM F1642 Design Team CalculationsDescribe blast resistance level design requirements.
AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Envelope - Natural Hazard
Seismic ResistanceLife SafetyReduced DamageImmediate OccupancyOperationalPerformance Mockup TestingIBC-2012 ASCE 7-10 FEMA 356 ASTM E2026 Design Team Calculations & InspectionDescribe seismic resistance design assumptions.
External Fire Resistance (Proximal Threat)1-Hour Fire Resistance Rating2-Hour Fire Resistance Rating3-Hour Fire Resistance Rating & Protected OpeningsN/ANFPA 251 257 259 & 285 ASTM E108 E119 & E2707IBC-2012 Design Team Calculations/ JudgementDescribe exterior fire resistance design requirements.Witness mockup test when provided.
Windborne Debris ResistanceLarge Missile < 30-ft from Grade & Small Missile > 30-ft of GradeLarge Missile < 30-ft from Grade & Small Missile > 30-ft of Grade. No breach in envelope for wind zone.Site Specific Risk Assessment (Tornado Hazard)N/AN/AASTM E 1996/1886 Wind Tunnel Testing & Projectile Impact TestingICC/NSSA 500-2008 FEMA 361 ASTM E1996 Design Team Calculations & InspectionDescribe windborne debris resistance design requirements.Witness mockup test when provided.
Flood Resistance100-Year Flood Hazard; Critical Action Facilities Must be Located above the 500-Year Base Flood.500-Year Flood Hazard and/or Storm Surge InundationSite Specific Risk Assessment (Dam, Levee, and Floodwall Failure Hazards)N/ASite PlanningFEMA Flood Maps ASCE 24-05, "Flood Resistant Design and Construction" Design Team Calculations & InspectionDescribe flood resistance design requirements.Witness mockup test when provided.
AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Envelope - Servicability
Wind ResistanceDeflection within code limits.Deflection less than code limits. Deflection limit to be selected by design team.N/AN/AASTM E 330 ASTM E 1300 Wind Tunnel Testing & Performance Mockup TestingIBC-2012 ASCE 7-10 Design Team Calculations & InspectionDescribe envelope wind resistance design requirements.
AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Water Penetration Resistance
FenestrationCW30 @ 15% DPCW30 @ 20% DPAW40 @ 25% DPAW40 @ 30% DPASTM E331
ASTM E1105
AAMA 501.1
AAMA E2268
AAMA 501.2
Yes

Water Leakage = Uncontrolled Water Penetration

Delete Test Pressure Upper Limits from AAMA 101-08
ASCE 7-10
AAMA 101-08
Describe fenestration water penetration resistance level utilized in the design.CxA to witness Performance Mock-Up Test outlined in ASTM E331-09, E1105-08 as applicable
Roofing and Horizontal Waterproofing-Membrane SystemDo not use roof surface for Storm Water Retention or allow Water Water to otherwise pond or remain

Highly resistant to physical damage

Designs that prohibit entrapment of Water
Baseline and

Fully Reinforced Membrane System

Membrane System Fully Bonded to the Structural Deck
★ and

Membrane System Fully Bonded to the Structural Deck

Monolithic/Seamless
★★ and

System Protected from Temperature and Ultra Violet Radiation
NRCA Roofing and Waterproofing Manual

SMACNA Architectural Sheet Metal Manual
YesYesDescribe roofing and horizontal waterproofing membrane water penetration resistance construction.CxA to verify installation and witness testing per ASTM C-1601-05 or NRCA Manual Guideline: "Quality Assurance and Water Test"
Roofing and Horizontal Waterproofing-Minimum Slope2012 International Building Code, Section 1507Baseline X 1.50Baseline X 2.00Baseline X 2.50N/A2012 IBC, Section 1507YesDescribe roofing and horizontal waterproofing minimum slope used in design.CxA to verify installation and witness testing per ASTM C-1601-05 or NRCA Manual Guideline: "Quality Assurance and Water Test"
Roofing and Horizontal Waterproofing-Drainage2012 International Plumbing Code, Section 1106 for 100 yr. max. 1-hr rainfall designBaseline X 1.10Baseline X 1.20Baseline X 1.40N/A2012 IPC, Section 1106 for 100 yr. max. 1-hr rainfall design2012 IPC, Section 1106 for 100 yr. max. 1-hr rainfall designDescribe basis for designing the roofing and horizontal waterproofing drainage.CxA to verify installation and witness testing per ASTM C-1601-05 or NRCA Manual Guideline: "Quality Assurance and Water Test"
Roofing and Horizontal Waterproofing-Vegitative SystemsShall meet ★★★ requirements of Roofing and Horizontal Watrproofing Membrane System

Shall Meet ★ for Roofing and Horizontal Waterproofing Minimum Slope

Shall meet ★ For Roofing and Horizontal Waterproofing Drainage

Shall meet ★ for Roofing and Horizontal Waterproofing Testing and Monitoring
Baseline and

Shall Meet ★★ for Roofing and Horizontal Waterproofing Minimum Slope

Shall meet ★★ For Roofing and Horizontal Waterproofing Drainage
★ and

Shall Meet ★★★ for Roofing and Horizontal Waterproofing Minimum Slope

Shall meet ★★★ For Roofing and Horizontal Waterproofing Drainage

Shall meet ★★ for Roofing and Horizontal Waterproofing Testing and Monitoring
★★ and

Shall meet ★★★ for Roofing and Horizontal Waterproofing Testing and Monitoring
YesYesYesDescribe vegetative roofing systems water penetration construction, minimum slope and basis for sizing drainage.CxA to verify installation and witness testing per ASTM C-1601-05 or NRCA Manual Guideline: "Quality Assurance and Water Test"
Roofing and Horizontal Waterproofing-Testing and Monitoring100% Flood Test of all Roofing and Horizontal Waterproofing Surfaces for 48 hours.Baseline and

Utilize Electronic Leak Detection(ELD) or an alternate methods that to pin point breach locations in the membrane without reliance on water passage through the breach during construction.

Limited Area flood testing per ASTM D5957 at drain bodies and other transitions or penetrations that do not allow ELD.

Water nozzle test similar to AAMA 501.2 shall be performed on all roof detailing not included in ELD and flood testing.
★ and

Allow for future ELD testing during the life of the structure as leaks are identified without removal or disassembly of the coverings.
★★ and

Provide a maintenance plan including monitoring at regular intervals as determined.

If possible, tie leak detection system into the Building Management System (BMS) and alerts
ASTM D5957

AAMA 501.2

(No Existing Standard for ELD)
YesN/ADescribe roofing and horizontal waterproofing testing requirements and leak monitoring system, when used.CxA to review Testing & Monitoring procedures proposed by contractor

CxA to verify BMS system interface to leak detection in conjunction with balance of systems, if applicable

CxA to verify installation and witness testing per ASTM C-1601-05 or NRCA Manual Guideline: "Quality Assurance and Water Test"
Ground Water ControlN/APassive Ground Water Control with a emergency back-up pump, as required.N/ASelect a location, site, or building design that allows for ground water table to remain a minimum of 600mm (2 feet) below the lowest level of the structure.N/A2012 IBC, Section 1805.1.32012 IBC, Section 1805.1.3Describe method of ground water control whne required.CxA to test emergency back-up pump, where applicable.
Below Grade WaterproofingRelieve hydrostatic pressure on substructure walls and allow water drainage to the level of the drain.

Membrane waterproofing must be fully bonded to the substrate and seamless.

Below-grade waterproofing must be applied to the positive pressure side and must be covered by a protection drainage and protection course.
Baseline and

+ designation in Ground Water Control

Provide a system that does not rely on unpredictable or difficult to control site conditions to develop and maintain a water-tight installation.

Complete "Bathtub" waterproofing in the presence of water table to mitigate demand on dewatering system.

May require foundation modification.
★ and

Includes redundant below grade waterproofing systems, such as a water repellant additive to the concrete masonry foundation walls.
★★ and

Include secondary drainage layer within below-grade horizontal concrete slab assemblies.
N/A2012 IBC, Section 18052012 IBC, Section 1805Describe waterproofing system for below grade waterproofing and test method proposed.CxA shall witness below grade waterproofing test.
AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Moisture and Condensation Control
Moisture Control Opaque AssembliesDesign of the above-grade building enclosure must be demonstrated early in the design development. ASHRAE 160-2009, Criteria for Moisture Control Design Analysis in Buildings is an acceptable basis of designBaseline and

Provide continuous exterior insulation for wall roof, below grade walls and all slab-on-grade containing conditioned space.

Conduct moisture control design analysis for each exterior assembly and exposure to document understanding of condensation and drying potential.
★ and

Provide sufficient continuous exterior insulation to avoid damaging condensation potential outboard of the drainage plane for wall roof, below grade walls and all slab-on-grade containing conditioned space.

Monitoring of moisture content of assembly at vulnerable locations as determined and specified in the construction documents.
★★ and

All thermal controls are outboard of the air and vapor control layers of the assembly.

Monitoring of moisture content of assemblies tied to BMS for each exposure and cladding type.
YesYesASHRAE 160-2009Document requirement in basis of designCxA to witness tests outlined in ASTM C1601-05, if applicable
Condensation Resistance FenestrationNFRC 500

Thermal Analysis and Modeling
Baseline and

AAMA 1503 for Standard Extrusion Profiles and Assemblies-Product Submittal

Also including Materials and Components that penetrate the thermal control layer
★ and

AAMA 1503 for Job-Specific Extrusion Profiles and Assemblies, including Anchors
★★ and

AAMA 501.5including Thermal Cycling of full size mock-up with thermocouples to document performance
AAMA 1503

NFRC 500
NFRC 500

Testing and Modeling to show that no condensation occurs on uncontrolled surfaces based on the interior and exterior design criteria
NFRC 500Document requirement in basis of designNFRC 500-2010 and 102-2010 (Test Procedure) are intended for the laboratory for establishing ratings, not field testing, so there is no CxA witness activity
AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Air Tightness
FenestrationCW30 Minimum Performance ClassBaseline and

< 1.5 L/s*m (0.3 cfm)
@ 75 Pa (1.57 psf)

Performance data correlated to performance testing
★ and

AW40 Minimum Performance Class

< 1.5 L/s*m (0.3 cfm)
@ 300 Pa (6.24 psf)

Durability testing as required for Performance Class
★★ and

AW40 Minimum Performance Class

< 0.5 L/s*m (0.1 cfm)
@ 300 Pa (6.24 psf)

Additional Durability Testing as appropriate for the systems anticipated use.
ASTME2318

ASTME283

ASTME783
AAMA 101-2008AAMA 101-2008Document requirement in basis of designCxA to witness Performance Mock-Up Test outlined in ASTM E783-10, E283-04, as applicable
Enclosure Airtightness (All Six Sides of the Building)0.40 cfm/ft2
@ 0.3in w.c.
0.25 cfm/ft2
@ 0.3in w.c.
0.15 cfm/ft2
@ 0.3in w.c.
0.10 cfm/ft2
@ 0.3in w.c.
ASTM
E779/E1827
YesNoProvide enclosure airtightness performance requirement and measures designed to provide air barrier.CxA to witness Blower Door Test outlined in ASTM E1827-11 (ASTM E-779 was withdrawn in 2010)
AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Thermal Performance
Thermal PerformanceASHRAE 90.1-2010, Section 5.5 and where section 5.5 is referencedBaseline X 1.15Baseline X 1.30Baseline X 1.50ASHRAE 90.1-2010YesASHRAE 90.1-2010Provide thermal performance characteristics of the enclosure assemblies.CxA to perform HVAC system testing per ASHRAE Guideline 1.1-2007 (Guidleine 30 was integrated into Guideline 1 in 2007)
AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Building Enclosure Commissioning
Building Enclosure CommissioningTotal Building Commissioning with Building Enclosure CommissioningFundamental Building Enclosure Commissioning (BECx)Enhanced BECxEnhanced BECxwith Increased performance testing as determined by OPRASTM E2813

ASHRAE Guideline 0

ASHRAE Guideline 3
ASTM E2813

ASHRAE Guideline 0

ASHRAE Guideline 3
ASTM E2813

ASHRAE Guideline 0

ASHRAE Guideline 3
Provide any special testing requirements anticipated during commissioning.CxA inspection and verification to be performed as outlined in NIBS Guideline 3

ASTM WK26027 in review by ASTM, E2813 no longer available

ASHRAE Guideline 3 withdrawn 2004
AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Enclosure Acoustic Control
Assuming NC-35 InteriorSTC-40/OITC-35 based on standard performance values reported for assembliesSTC-45/OITC-40 & site assessment and lab tests of enclosure componentsSTC-45/OITC-40 & site assessment and site mockup testingSTC-50/OITC-45 & site assessment, mockup field tests and one field test per 20 000 sf of enclosureASTM E90, E366 & E966.Classification by E1332NoProvide enclosure sound control performance requirements.Testing witnessed by the CxA per ASTM Standard E1124-10
AttributeBaseline
Tier 1 High Performance
★★
Tier 2 High Performance
★★★
Tier 3 High Performance
Verification
Measurements & VerificationPlans & SpecificationsCalculations & AnalysisDesign Basis of DesignConstruction Verification
  Enclosure Service Life
Walls (In years to replacement/major rehabilitation)50/2575/30100/40150/50NoYes, Design Review, ★ and higher: Enclosure Cx CSA S478 plan, Maintenance planNoDescribe expected service life for each enclosure wall type proposed.CxA shall confirm through submittal review.
Roofs (Replacement)20304050NoYes, Design Review, ★ and higher: Enclosure Cx CSA S478 plan, Maintenance planDescribe expected service life for roof type proposed.CxA shall confirm through submittal review.
Fenestration (Years to frame replacement / IGU+gaskets and seals replacement)30/1540/2050/2575/25Yes, Design Review, ★ and higher: Enclosure Cx CSA S478 plan, Maintenance planDescribe expected service life for each fenestration assembly proposed.CxA shall confirm through submittal review.
^