Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated May 16, 2017; Posted May 25, 2017

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master uses the latest CSI MasterFormat, therefore, as of January 2012, the UFGS Working Group decided to discontinue support of MasterFormat 1995. SpecsIntact version 4.5.1 and above will support MasterFormat 2010 and will no longer support the creation of Jobs or Masters using the old MasterFormat 1995 UFGS Master. For backward compatibility, Masters or Jobs created with older versions can still be opened using the latest software versions.

As of June 2008 :Updated UFGS will be posted quarterly in February, May, August and November.

As of May 2013: The May 2013 release incorporates Automatic Paragraph Numbering. Versions of Specsintact older than 4.5.0 are not compatible with this feature. Existing jobs can be converted to the new automatic numbered format. The conversion is a one-way process. To convert, select the job or master, select process menu, choose convert Job/Master to Automatic numbering. More information about Automatic Paragraph Numbering is available on the SpecsIntact website.

For Specsintact Technical Support: 321-867-8800  |   E-mail  |   specsintact.ksc.nasa.gov

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 MasterFormat™ number. UFGS that are agency-specific have a fifth level number indicating it as an agency specific specification. A specification that has a fifth level number "10" indicates USACE, a "20" indicates NAVFAC, a "30" indicates AFCEC, and a "40" indicates NASA. Preparing agencies are indicated in the UFGS header of each specification. The user should follow this order of precedence in selecting UFGS sections:

  1. Regional UFGS specific to their Agency
  2. UFGS identified as specific to their Agency
  3. Unified UFGS if one is available
  4. UFGS identified as specific to another DoD Agency (for DoD projects only)
  5. UFGS from another agency.

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007  .

Section templates for MasterFormat 2010 and MasterFormat 1995: These templates are provided to assist the user in creating a new section.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request. To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR.

These documents are available in the following formats:   Adobe Acrobat (PDF)  |   SpecsIntact (SEC) in compressed ZIP

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

Titlesort descending Date View CCR
UFGS MASTER 05-25-2017  ZIP
Division 00 - Procurement and Contracting Requirements 05-01-2017  ZIP
Division 01 - General Requirements 05-01-2017  ZIP
Division 02 - Existing Conditions 05-01-2017  ZIP
Division 03 - Concrete 05-01-2017  ZIP
Division 04 - Masonry 05-01-2017  ZIP
Division 05 - Metals 05-01-2017  ZIP
Division 06 - Wood, Plastics and Composites 05-01-2017  ZIP
Division 07 - Thermal and Moisture Protection 05-01-2017  ZIP
Division 08 - Openings 05-01-2017  ZIP
Division 09 - Finishes 05-01-2017  ZIP
Division 10 - Specialties 05-01-2017  ZIP
Division 11 - Equipment 05-01-2017  ZIP
Division 12 - Furnishings 05-01-2017  ZIP
Division 13 - Special Construction 05-01-2017  ZIP
Division 14 - Conveying Equipment 05-01-2017  ZIP
Division 21 - Fire Suppression 05-01-2017  ZIP
Division 22 - Plumbing 05-01-2017  ZIP
Division 23 - Heating, Ventilating, and Air Conditioning 05-01-2017  ZIP
Division 25 - Integrated Automation 05-01-2017  ZIP
Division 26 - Electrical 05-01-2017  ZIP
Division 27 - Communications 05-01-2017  ZIP
Division 28 - Electronic Safety and Security 05-01-2017  ZIP
Division 31 - Earthwork 05-01-2017  ZIP
Division 32 - Exterior Improvements 05-01-2017  ZIP
Division 33 - Utilities 05-01-2017  ZIP
Division 34 - Transportation 05-01-2017  ZIP
Division 35 - Waterway and Marine Construction 05-01-2017  ZIP
Division 40 - Process Integration 05-01-2017  ZIP
Division 41 - Material Processing and Handling Equipment 05-01-2017  ZIP
Division 42 - Process Heating, Cooling and Drying Equipment 05-01-2017  ZIP
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment 05-01-2017  ZIP
Division 44 - Pollution and Waste Control Equipment 05-01-2017  ZIP
Division 46 - Water and Wastewater Equipment 05-01-2017  ZIP
Division 48 - Electrical Power Generation 05-01-2017  ZIP
UFGS 00 01 15 List of Drawings 02-01-2011  PDF |  ZIP  CCR
UFGS 00 22 13.00 20 Supplementary Instructions to Offerors 02-01-2014  PDF |  ZIP  CCR
UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects 08-01-2008  PDF |  ZIP  CCR
UFGS 00 73 03 Supplementary Conditions for Azores Projects 08-01-2008  PDF |  ZIP  CCR
UFGS 00 73 04 Supplementary Conditions for Projects in Mediterranean Area 08-01-2008  PDF |  ZIP  CCR
UFGS 01 11 00 Summary of Work 08-01-2015  PDF |  ZIP  CCR
UFGS 01 14 00 Work Restrictions 11-01-2011  PDF |  ZIP  CCR
UFGS 01 20 00.00 20 Price and Payment Procedures 11-01-2011  PDF |  ZIP  CCR
UFGS 01 22 00.00 10 Price and Payment Procedures 08-01-2015  PDF |  ZIP  CCR
UFGS 01 30 00 Administrative Requirements 08-01-2015  PDF |  ZIP  CCR
UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System 05-01-2017  PDF |  ZIP  CCR
UFGS 01 32 01.00 10 Project Schedule 02-01-2015  PDF |  ZIP  CCR
UFGS 01 32 16.00 20 Small Project Construction Progress Schedules 02-01-2015  PDF |  ZIP  CCR
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) 02-01-2015  PDF |  ZIP  CCR
UFGS 01 33 00 Submittal Procedures 05-01-2011  PDF |  ZIP  CCR
UFGS 01 33 16.00 10 Design Data (Design After Award) 05-01-2016  PDF |  ZIP  CCR
UFGS 01 33 23.33 Aviation Fuel System Submittal Requirements 02-01-2010  PDF |  ZIP  CCR
UFGS 01 33 29 Sustainability Reporting 02-01-2017  PDF |  ZIP  CCR
UFGS 01 35 13 Special Project Procedures 11-01-2011  PDF |  ZIP  CCR
UFGS 01 35 13.43 10 Special Project Procedures for Contaminated Sites 08-01-2015  PDF |  ZIP  CCR
UFGS 01 35 26 Governmental Safety Requirements 11-01-2015  PDF |  ZIP  CCR
UFGS 01 35 29.13 Health, Safety, and Emergency Response Procedures for Contaminated Sites 11-01-2015  PDF |  ZIP  CCR
UFGS 01 35 45.00 10 Chemical Data Quality Control 04-01-2006  PDF |  ZIP  CCR
UFGS 01 42 00 Sources for Reference Publications 11-01-2014  PDF |  ZIP  CCR
UFGS 01 42 15 Metric Measurements 02-01-2014  PDF |  ZIP  CCR
UFGS 01 45 00.00 10 Quality Control 11-01-2016  PDF |  ZIP  CCR
UFGS 01 45 00.00 20 Quality Control 11-01-2011  PDF |  ZIP  CCR
UFGS 01 45 00.00 40 Quality Control 11-01-2014  PDF |  ZIP  CCR
UFGS 01 45 00.10 20 Quality Control for Minor Construction 02-01-2010  PDF |  ZIP  CCR
UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) 11-01-2016  PDF |  ZIP  CCR
UFGS 01 45 35 Special Inspections 02-01-2015  PDF |  ZIP  CCR
UFGS 01 50 00 Temporary Construction Facilities and Controls 08-01-2009  PDF |  ZIP  CCR
UFGS 01 57 19 Temporary Environmental Controls 11-01-2015  PDF |  ZIP  CCR
UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls 11-01-2015  PDF |  ZIP  CCR
UFGS 01 58 00 Project Identification 08-01-2009  PDF |  ZIP  CCR
UFGS 01 73 19 Installation of Government-Furnished Medical Equipment 04-01-2006  PDF |  ZIP  CCR
UFGS 01 74 19 Construction and Demolition Waste Management 01-01-2007  PDF |  ZIP  CCR
UFGS 01 78 00 Closeout Submittals 08-01-2011  PDF |  ZIP  CCR
UFGS 01 78 23 Operation and Maintenance Data 08-01-2015  PDF |  ZIP  CCR
UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems 02-01-2010  PDF |  ZIP  CCR
UFGS 01 78 24.00 10 Facility Data Requirements 05-01-2017  PDF |  ZIP  CCR
UFGS 01 78 24.00 20 Facility Electronic Operation and Maintenance Support Information (eOMSI) 02-01-2015  PDF |  ZIP  CCR
UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells 02-01-2012  PDF |  ZIP  CCR
UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements 02-01-2012  PDF |  ZIP  CCR
UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems 02-01-2012  PDF |  ZIP  CCR
UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems 02-01-2012  PDF |  ZIP  CCR
UFGS 01 91 00.15 Total Building Commissioning 05-01-2016  PDF |  ZIP  CCR
UFGS 02 01 50 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems 05-01-2010  PDF |  ZIP  CCR
UFGS 02 32 00 Subsurface Drilling, Sampling, and Testing 05-01-2010  PDF |  ZIP  CCR
UFGS 02 35 27 Soil-Bentonite (S-B) Slurry Trench 05-01-2010  PDF |  ZIP  CCR
UFGS 02 41 00 [Demolition] [and] [Deconstruction] 05-01-2010  PDF |  ZIP  CCR
UFGS 02 42 51 Carpet Removal and Reclamation 02-01-2012  PDF |  ZIP  CCR
UFGS 02 42 91 Removal and Salvage of Historic Construction Materials 05-01-2010  PDF |  ZIP  CCR
UFGS 02 51 13 Precipitation/Coagulation/Flocculation Water Treatment 05-01-2010  PDF |  ZIP  CCR
UFGS 02 53 16 Remediation of Contaminated Soils By Thermal Desorption 02-01-2010  PDF |  ZIP  CCR
UFGS 02 54 20 Bioremediation of Soils Using Landfarming Systems 02-01-2010  PDF |  ZIP  CCR
UFGS 02 54 21 Bioremediation of Soils Using Windrow Composting 02-01-2010  PDF |  ZIP  CCR
UFGS 02 54 23 Soil Washing Through Separation/Solubilization 02-01-2010  PDF |  ZIP  CCR
UFGS 02 55 00 Solidification/Stabilization (S/S) of Contaminated Material 02-01-2010  PDF |  ZIP  CCR
UFGS 02 56 13 Waste Containment Geomembrane 02-01-2010  PDF |  ZIP  CCR
UFGS 02 56 14 Clay Barrier Layer 02-01-2010  PDF |  ZIP  CCR
UFGS 02 56 15 Geosynthetic Clay Liner (GCL) 02-01-2010  PDF |  ZIP  CCR
UFGS 02 61 13 Excavation and Handling of Contaminated Material 02-01-2010  PDF |  ZIP  CCR
UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils 04-01-2006  PDF |  ZIP  CCR
UFGS 02 62 16 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems 02-01-2010  PDF |  ZIP  CCR

Pages