UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Nov-2019 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 1 Added bracketed statement to paragraph 2.11.2 in response to CCR 7108. Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 05 48.19 [Seismic] Bracing for HVAC C 1 Updated paragraphs 2.3, 2.4.1, and 2.5 in response to CCR 6932.
Nov-2019 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 09 00 Instrumentation and Control for HVAC C 1 Added new paragraph 1.1.1 to accommodate a recent change in Navy policy.
Nov-2019 N UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 21 13.23 20 [High] [Medium] Temperature Water System Within Buildings C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 52 00 Heating Boilers C 5 Updated designer's note on page 15 in response to CCR 6454.
Nov-2019 A UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers R Complete review and update.
Nov-2019 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 00 00.00 20 Basic Electrical Materials and Methods C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (1.11-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”
Nov-2019 S UFGS 26 05 26.00 40 Grounding and Bonding for Electrical Systems R This section supersedes UFGS 28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY. The Section title and number were changed to align with the Electrical Systems.
Nov-2019 N UFGS 26 05 33 Dockside Power Connection Stations C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.6-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”.
Nov-2019 N UFGS 26 11 16 Secondary Unit Substations C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.5-a.), "Decal shall be Panduit No. PPSO710D72 or approved equal.".
Nov-2019 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. In response to CCR 7565, as FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, the following language was removed from the paragraph WARNING SIGNS AND LABELS (2.3), "(decals, Panduit No. PPSO710D72 or approved equal)".
Nov-2019 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS AND LABELS (2.6-a.), “(decals, Panduit No. PPSO710D72 or approved equal)”.
Nov-2019 N UFGS 26 20 00 Interior Distribution System C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 23 00 Low Voltage Switchgear C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 32 13.00 20 Single Operation Generator Sets C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 26 32 15.00 10 Diesel-Generator Set Stationary 100-2500 KW, with Auxiliaries C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 26 42 14.00 10 Cathodic Protection System (Sacrificial Anode) C 1 Updated paragraphs 2.3.11.3, 2.3.14, 3.5.2.1, and 3.5.2.2 to remove "brand name or approved equal" language in response to CP/DWG discussions.
Nov-2019 S UFGS 26 51 00.00 40 Interior Lighting D Removed from UFGS Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems D Section has been superseded by UFGS 26 05 26.00 40 Grounding and Bonding for Electrical Systems. The Section number was changed to align with the Electrical Systems. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 31 63 29 Drilled Concrete Piers and Shafts R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement R Complete review and update to meet MF2016 and UFC 1-300-02; title changed from RESEALING OF JOINTS IN RIGID PAVEMENT. Revision supersedes previous version and UFGS 32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS.
Nov-2019 A UFGS 32 11 13.13 Lime Treated Subgrade N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 11 29 LIME-[STABILIZED][MODIFIED] SUBGRADE and UFGS 32 11 30 LIME TREATED SUBGRADE [LIME MODIFIED SOILS]
Nov-2019 A UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade D Superseded by UFGS 32 11 13.13 LIME TREATED SUBGRADE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 N UFGS 32 11 36.13 Lean Concrete Base Course R Complete review and update to meet MF2016 and UFC 1-300-02.
Nov-2019 A UFGS 32 12 16.19 Cold-Mix Asphalt Paving N Section Number has been reinstated. Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 12 19 BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX).
Nov-2019 A UFGS 32 12 18 Resin Modified Pavement Surfacing Material D Superseded by UFGS 32 12 19.16 RESIN-MODIFIED ASPHALT PAVING WEARING COURSES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 12 19 Bituminous Binder and Wearing Courses (Central-Plant Cold-Mix) D Superseded by UFGS 32 12 16.19 COLD-MIX ASPHALT PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 12 18 RESIN MODIFIED PAVEMENT SURFACING MATERIAL.
Nov-2019 A UFGS 32 13 73 Compression Joint Seals for Concrete Pavements D Superseded by UFGS 32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 13 73.19 Compression Concrete Paving Joint Sealant N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS.
Nov-2019 A UFGS 32 14 13.13 Interlocking Precast Concrete Unit Paving N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 16 15 CONCRETE BLOCK PAVEMENTS.
Nov-2019 A UFGS 32 16 15 Concrete Block Pavements D Superseded by UFGS 32 14 13.13 INTERLOCKING PRECAST CONCRETE UNIT PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type D Superseded by 33 32 16 - PACKAGED UTILITY WASTEWATER PUMPING STATIONS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations R Revised to combine Section 33 32 16 Packaged Utility Wastewater Pumping Stations with Section 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type. Preparing Activity changed from NAVFAC to NASA.
Nov-2019 F UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations C Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2019 N UFGS 33 71 01 Overhead Transmission and Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 33 71 02 Underground Electrical Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph Cable Marking (2.2.6) “, or approved equal,”.
Nov-2019 A UFGS 34 73 13 Aircraft Tiedowns R Complete review and update to meet MF2016 and UFC 1-300-02 including section title change from MOORING AND GROUNDING POINTS FOR AIRCRAFT to AIRCRAFT TIEDOWNS.
Nov-2019 A UFGS 34 73 16 Airfield Grounding N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 34 73 13 MOORING AND GROUNDING POINTS FOR AIRCRAFT.
Nov-2019 A UFGS 40 95 00 Process Control R Complete review and update.
Nov-2019 N UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running R Complete review and update. Incorporates latest crane test and certification requirements.
Aug-2019 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Updated section to include the required Oracle Primavera P6 software settings to be utilized in preparation and maintenance of the construction schedule and the tabular reports required to be submitted with each monthly invoice.
Aug-2019 N UFGS 01 35 13 Special Project Procedures C 1 In response to CCR 6316, added paragraph to "Schedule of Work/Aircraft Operating Schedules" (3.1.2 ) to define/clarify "Existing Conditions Survey"
Aug-2019 N UFGS 01 35 26 Governmental Safety Requirements C 8 In response to CCR 7273, "Dive Operations Plan" has been added as a submittal item under SD-01 and in paragraph "DIVE SAFETY REQUIREMENTS" (1.19)
Aug-2019 N UFGS 01 45 00.00 20 Quality Control C 3 In response to CCRs 6298 and 6299, statements requiring eOMSI/OMSI were changed to bracketed options in paragraphs "Duties Statement" (1.5.2.1) and "Test Reports and Monthly Summary Report of Tests" (1.12.5), respectively. In response to CCR 6558, Specifier Note and bracketed option were added to paragraph "Requirements" (1.6.1.1), list item k. "LIST OF DEFINABLE FEATURES"
Aug-2019 A UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) C 2 Updated RMS requirements in paragraph 1.4 and deleted paragraph 1.5 in response to CCR 7627.
Aug-2019 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 Added tailoring option and editor's note to paragraph 3.6 in response to CCR 7602. Added reference tags and corrected character spacing in paragraph 1.5 in response to CCR 7624.
Aug-2019 N UFGS 01 57 19 Temporary Environmental Controls C 3 In response to the following CCRs: #5233 - revised language in paragraph "Dust Control" (3.5.7) to reflect the Crystalline Silica hazard associated with cement and concrete products per the new OSHA Standard of Crystalline Silica; #5733 - "Stormwater Pollution Prevention Plan" has been added as a submittal item under SD-01 and in paragraph "Stormwater Pollution Prevention Plan" (3.2.1.1); #7178 - revision to clarify submittal item "Solid Waste Management Report", updated as "Monthly Solid Waste Disposal Report" in Part 1 (1.11.1) and "Project Solid Waste Disposal Documentation Report" in Part 3 (3.7.2.1) and in the Submittal Article under SD-06 and SD-11 respectively; #7179 - added a new row "C&D Debris Composted" to table under paragraph Nonhazardous Solid Waste Diversion Report (3.6.2)
Aug-2019 N UFGS 01 58 00 Project Identification R Complete review and update
Aug-2019 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness R Complete review and update.
Aug-2019 A UFGS 07 27 10.00 10 Building Air Barrier System R Complete review and update.
Aug-2019 N UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks C 2 In response to CCR 4193, the NOTE under paragraph "SURFACE PREPARATION" (3.8) has been removed as the instructions refer to SSPC SP 12 which has been withdrawn.
Aug-2019 A UFGS 23 52 00 Heating Boilers C 4 Revised paragraph 2.12.14 in response to CCR 7344.
Aug-2019 S UFGS 26 05 00.00 40 Common Work Results for Electrical R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 S UFGS 26 09 23.00 40 Lighting Control Devices R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 S UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 N UFGS 26 20 00 Interior Distribution System R Complete review and update
Aug-2019 S UFGS 26 24 16.00 40 Panelboards R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 S UFGS 26 35 33.00 40 Power Factor Correction Equipment R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling. Title changed from Grounding and Bonding for Electronic Safety and Security to Grounding and Bonding for Electrical Systems.
Aug-2019 A UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements R Complete review and update.
Aug-2019 N UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant) R New title (formerly COMMISSIONING OF FUEL FACILITIES); Section revised and enhanced to include the requirements for Initial fuel receipt, flushing, cleaning, control valve adjustments, equipment tests and performance testing for fuel facilities that are “dead-end” type; Preparing Activity has been changed from Air Force to Navy.
Aug-2019 A UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines R Complete review and update including section title change from NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION to NATURAL-GAS / LIQUEFIED PETROLEUM GAS DISTRIBUTION PIPELINES.
Aug-2019 N UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) C 1 Updated section to include the requirements if water is used during hydrostatic testing and/or pigging.
Aug-2019 S UFGS 33 77 19.00 40 Medium-Voltage Switch R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling; title changed from Medium-Voltage Gas Switch to Medium Voltage Switch.
May-2019 N UFGS 01 14 00 Work Restrictions C 7 In response to CCR 7479, the location and phone number for SWFPAC Pass and ID office has been updated in paragraph 1.16.1.1 Vehicle Access
May-2019 S UFGS 01 33 00 Submittal Procedures C 3 Editing Para 1.17
May-2019 N UFGS 01 35 26 Governmental Safety Requirements C 7 In response to CCR 7271, added language to state the District Dive Coordinator will submit documents for approval via the Contracting Officer.
May-2019 N UFGS 01 57 19 Temporary Environmental Controls C 2 In response to CCR 7194, FAR clause 52.242-14 Suspension of Work was added to the paragraph "Non-Compliance Notifications"; updated links per CCRs 7375 and 7376
May-2019 A UFGS 01 78 00 Closeout Submittals R Complete review and update.
May-2019 A UFGS 01 91 00.15 10 Total Building Commissioning N This UFGS is for Army and Air Force use only; superseding UFGS 01 91 00.15 TOTAL BUILDING COMMISSIONING for Army and Air Force requirements only. Note: 01 91 00.15 is now for Navy use only, USACE remains the Preparing Activity [until 05-2020].
May-2019 A UFGS 04 20 00 Unit Masonry C 2 Added sentence to paragraph 2.6.2.7 in response to CCR 7025.
May-2019 N UFGS 08 44 00 Curtain Wall and Glazed Assemblies R Provide requirements for ATFP and windborne debris regions (which addresses CCRs 2456, 5773); also address CCR 3956 – Reference NFPA 285 where required
May-2019 N UFGS 08 51 13 Aluminum Windows R Provide requirements for ATFP and windborne debris regions (which addresses CCRs 1785, 5195, 6074), also addresses the following CCRs: 1876 - Provide bracket option for mock-ups; 2454 – Thermal performance of assembly; 2673 – Remove redundancy of hung windows; 2769 – Testing requirements for thermal performance
May-2019 N UFGS 08 81 00 Glazing R Address the following CCRs: 2253, 2342 – Separate requirements for Fire Protection and Fire Resistant Glazing; 2701 – Option for blast mitigation glazing; 3917 – Option for glazing for passive solar and dynamic control fenestration; 4302 – Option for triple glazed insulated units; 4339, 5838 – Glazing tape types; 5176 – Updated testing reference for performance of insulated glass units; 5389 – Removal of redundant information regarding insulated glass units
May-2019 A UFGS 11 13 19.13 Loading Dock Levelers C 1 Added reference publications MHI MH30.1, MHI MH30.3, ASTM D624, and ASTM D2632 in response to CCR 7391.
May-2019 S UFGS 26 05 70.00 40 High-Voltage Overcurrent Protective Devices R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
May-2019 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers R New title (formerly THREE-PHASE PAD-MOUNTED TRANSFORMERS) CCR changes.
May-2019 S UFGS 26 24 19.00 40 Motor-Control Centers R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
May-2019 A UFGS 26 32 33.00 10 Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity D Superseded by UFGS 26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2019 A UFGS 26 33 53 Static Uninterruptible Power Supply (UPS) N Superseding UFGS 26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA CAPACITY and UFGS 26 33 53.00 20 UNINTERRUPTIBLE POWER SUPPLY (UPS).
May-2019 N UFGS 26 33 53.00 20 Uninterruptible Power Supply (UPS) D Superseded by UFGS 26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS) (Preparing Authority: Army) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2019 S UFGS 26 60 13.00 40 Low-Voltage Motors R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
May-2019 A UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks R Complete review and update.
May-2019 N UFGS 33 71 01 Overhead Transmission and Distribution R Changes required for formatting, updating transformer efficiencies, and CCR changes.
May-2019 S UFGS 33 73 00.00 40 Utility Transformers R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
May-2019 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 3 Updated list of allowable materials in paragraph 2.2 in response to CCR 6444, CCR 6719, and CCR 7165.
Feb-2019 S UFGS 01 33 00 Submittal Procedures C 2 In response to CCR's 7173, 7174, 7175, 7176, 7177, and 7123. 02/28/19 INTERIM RELEASE: This section was updated in response to CCR's 7314 and 7315 - the banner was incorrectly marked and was corrected to indicate Change 2; the command Execute Revisions was run to eliminate formatting elements that displayed in the previous version.
Feb-2019 A UFGS 01 42 00 Sources for Reference Publications R Complete review and update.
Feb-2019 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Corrected spelling errors in paragraphs 2.3.1 and 2.3.2 and deleted out of place measurements below paragraph 2.3.3 in response to CCR 7090.
Feb-2019 A UFGS 01 74 19 Construction Waste Management and Disposal R Complete review and update including section title change from CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT to CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.
Feb-2019 A UFGS 01 78 00 Closeout Submittals C 5 Added submittal item to paragraph 1.7.1 in response to CCR 7121.
Feb-2019 A UFGS 01 91 00.15 Building Commissioning R Complete review and update.
Feb-2019 A UFGS 02 41 00 [Demolition] [and] [Deconstruction] C 2 Coordinated the requirements for demolition and deconstruction activities with UFGS 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.
Feb-2019 A UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.