UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Feb-2022 A UFGS 34 75 13.13 Crash Rated Active Vehicle Barriers And Controls N Superseding UFGS 34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS.
Feb-2022 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams C 1 Incorporated CCR 10582.
Feb-2022 A UFGS 35 20 23.13 National Dredging Quality Management Program - Scow [Monitoring][ and ][Ullage] Profile N New UFGS.
Feb-2022 A UFGS 35 20 23.23 National Dredging Quality Management Program - Hopper Dredge N New UFGS.
Feb-2022 A UFGS 35 20 23.33 National Dredging Quality Management Program - Pipeline Hydraulic Dredge N New UFGS.
Feb-2022 N UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar R Complete review and update. Clarified terminology and made changes to submittals along with technical and testing requirements.
Nov-2021 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 7 In response to CCR 11022, updated requirements for jobsite computer tablet in the Field Administration paragraph, and CCR 11023, updated the Contract Administration paragraph to clarify eCMS file storage structure. Also added minimum download and upload speeds to paragraph 1.4.1 General.
Nov-2021 N UFGS 01 35 26 Governmental Safety Requirements C 2 In response to CCR 10735, corrected CFR reference in the Competent Person for Confined Space Entry paragraph and updated the Work Around Flammable Materials paragraph.
Nov-2021 A UFGS 01 45 00.00 10 Quality Control C 2 Incorporated CCRs 8607, 10228, 10948, and 11035.
Nov-2021 N UFGS 01 58 00 Project Identification C 3 In response to CCR 9882, instructions have been added for Air Force projects on Guam, on both Navy installation with NAVFAC execution and Army installation with USACE execution. Also, clarified Air Force instruction in the first Note in the Project Identification Signboard paragraph.
Nov-2021 A UFGS 01 74 19 Construction Waste Management and Disposal C 3 Required to align with NAVFAC regional fidelity, and to fix administrative issues, per two CCRs.
Nov-2021 A UFGS 01 78 24.00 10 Facility Data Requirements C 1 Incorporated CCR 10987 and corrected formatting issues.
Nov-2021 N UFGS 03 30 00 Cast-In-Place Concrete C 3 In response to CCR 10400, updated paragraph 2.3.1.2 -Blended Cements, list item c. and 2.3.1.6-Other Supplementary Cementitious Materials. Also updated 3.6.2-Mixing, list item c.
Nov-2021 N UFGS 03 45 00 Precast Architectural Concrete C 2 In response to CCR 9942 (submitted for UFGS-03 45 33), updated the table in the Cementitious Materials paragraph.
Nov-2021 N UFGS 03 45 33 Precast [Prestressed] Structural Concrete C 1 In response to CCR 9942, updated the table in the Cementitious Materials paragraph. Also updated the MATERIALS paragraph.
Nov-2021 N UFGS 08 34 16.10 Horizontal Rolling Steel Doors R General periodic update to include new rolling steel door technologies, materials, resiliency, and design methodologies to increase door performance and industry competition. Title changed from STEEL SLIDING HANGAR DOORS.
Nov-2021 N UFGS 08 34 16.20 Vertical Lift Fabric Doors C 1 Targeted update to incorporate recent lessons learned for wire-rope termination, safety arresters, performance standards, warranty and other safety items.
Nov-2021 N UFGS 08 34 49.00 20 Hemp Shielded Door R Complete review and update including CCR 921.
Nov-2021 A UFGS 09 97 02 Painting: Hydraulic Structures C 1 Incorporated CCRs and corrected formatting errors.
Nov-2021 N UFGS 26 08 00 Apparatus Inspection and Testing R Complete review and revision including CCRs 7038 and 8614.
Nov-2021 N UFGS 26 11 13.00 20 Primary Unit Substation R Complete review and revision.
Nov-2021 A UFGS 26 11 14.00 10 Main Electric Supply Station and Substation R Complete review and update.
Nov-2021 N UFGS 26 11 16 Secondary Unit Substations R Complete review and revision.
Nov-2021 N UFGS 26 13 13 Metal-Clad Switchgear N New section to address the requirements for metal-clad switchgear rated 1000 volts and above.
Nov-2021 N UFGS 26 13 14 Switchgear House N New section to address the requirements for environmentally controlled, exterior prefabricated, pre-engineered structures to house a coordinated grouping of electrical switchgear and associated power and control equipment.
Nov-2021 N UFGS 26 20 00 Interior Distribution System C 3 In response to the following: CCR 10728, "Cable Trays" and optional "Cable Tray Design Data" were added to the Submittal Article under SD-03 and SD-05, respectively, and tagged in the CABLE TRAY paragraph; CCR 10729, optional text added for the cable tray to serve as the EGC in the Trough-Type Cable Trays, Ladder-Type Cable Trays, and Channel-Type Cable Trays paragraphs; and CCR 10730, able Tray Installation paragraph has been updated to prevent partial or complete obstruction of access by cable tray and tray supports.
Nov-2021 N UFGS 26 31 00 Facility-Scale Solar Photovoltaic (PV) Systems R Complete review and revision including title change from SOLAR PHOTOVOLTAIC (PV) COMPONENTS.
Nov-2021 N UFGS 26 51 00 Interior Lighting C 2 In response to the following: CCR 10008, changed the LED source replacement requirement from 10% to 15% in the Luminaire Warranty paragraph (list items b and c) and CCR 10327, the integral driver surge protection has been updated to 2 kV in the LED Drivers paragraph, list item f.
Nov-2021 N UFGS 27 21 00.00 20 Intercommunication System D Superseded by UFGS-27 51 23 INTERCOMMUNICATION SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2021 S UFGS 27 21 00.00 40 Intercommunication System D Superseded by new unified UFGS 27 51 23 INTERCOMMUNICATION SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2021 N UFGS 27 41 00 Audio-Visual Systems N New section to address the requirements for most audio-visual system projects.
Nov-2021 N UFGS 27 51 23 Intercommunication System N New unified section superseding UFGS-27 21 00.00 20, UFGS-27 21 00.00 40, and UFGS-27 51 23.10 all titled INTERCOMMUNICATION SYSTEM.
Nov-2021 A UFGS 27 51 23.10 Intercommunication System D Superseded by new unified UFGS 27 51 23 INTERCOMMUNICATION SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2021 A UFGS 31 23 00.00 Tunnel Excavation – Blasting N New UFGS.
Nov-2021 A UFGS 31 23 01 Underwater Blasting C 1 Incorporated CCR 10552 and corrected formatting errors.
Nov-2021 A UFGS 31 23 06.00 Blasting - Surface C 1 Incorporated CCR 10553 and corrected formatting errors.
Nov-2021 S UFGS 32 31 13 Chain Link Fences and Gates R Revised to include corrosion requirements, update standards, and apply ESC and humidity factor requirements for choosing materials. CCRs 8185, 8477, 10849, 7935, 8090, 10965 7936, 7934, 7935.
Nov-2021 A UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates R Revised to include corrosion requirements, update standards, and apply ESC and humidity factor requirements for choosing materials.
Nov-2021 A UFGS 32 31 26 Wire Fences and Gates R Revised to include corrosion requirements, update standards, and apply ESC and humidity factor requirements for choosing materials.
Nov-2021 N UFGS 33 01 30.16 TV Inspection of Sewer Lines R Complete review and revision including title change from TV INSPECTION OF SEWER PIPELINES.
Nov-2021 N UFGS 33 01 30.72 Relining Sewers R Complete review and revision.
Nov-2021 A UFGS 33 40 00 Stormwater Utilities R Complete review and update including section title change from STORM DRAINAGE UTILITIES to STORMWATER UTILITIES.
Nov-2021 N UFGS 35 59 13.16 Extruded and Molded Marine Fenders R Complete review and update. This revision supersedes UFGS-35 59 13.19 ARCH-TYPE RUBBER MARINE FENDERS.
Nov-2021 N UFGS 35 59 13.17 Foam-Filled Marine Fenders N New section developed specifically for foam-filled marine fenders.
Nov-2021 N UFGS 35 59 13.18 Pneumatic and Hydro-Pneumatic Marine Fenders N New section developed specifically for pneumatic and hydro-pneumatic marine fenders.
Nov-2021 N UFGS 35 59 13.19 Arch-Type Rubber Marine Fenders D Superseded by UFGS-35 59 13.16 MARINE FENDERS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2021 N UFGS 01 11 00 Summary of Work C 2 In response to CCR 9971, added note to Submittal Article for NAVFAC PAC requirement to remove Government approval of salvage plan, and modified corresponding paragraph in text.
Aug-2021 N UFGS 01 14 00 Work Restrictions C 13 In response to the following CCRs: 9044, added Note to Submittal Article with instructions for Navy Design-Build projects; 9826, updated last sentence in Activity Regulations paragraph (1.5.1) to clarify identifying Contractor equipment; 3976, replaced "must" with "will" or "may" throughout Part 1 as appropriate.
Aug-2021 N UFGS 01 20 00 Price and Payment Procedures C 2 In response to CCR 9972, included timeline requirements for both Schedule of Prices and Earned Value Report and corrected typo in Note in Data Required paragraph.
Aug-2021 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 10208, updated requirements for NAVFAC PAC DB and DBB in Partnering and Mobilization paragraphs.
Aug-2021 N UFGS 01 35 26 Governmental Safety Requirements C 1 In response to CCR 9981, updated Note in APP-Construction paragraph to clarify instructions for NAVFAC PAC DB and DBB project options.
Aug-2021 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Added Note to Submittal Article with instructions for Navy Design-Build projects.
Aug-2021 N UFGS 01 57 19 Temporary Environmental Controls C 5 Added Note to Submittal Article with instructions for Navy Design-Build projects. In response to CCR 10213, updated requirements for NAVFAC PAC DB and DBB in Environmental Protection Plan paragraph.
Aug-2021 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 5 Added Note to Submittal Article with instructions for Navy Design-Build projects.
Aug-2021 A UFGS 01 74 19 Construction Waste Management and Disposal C 2 Added Note to Submittal Article with instructions for Navy Design-Build projects. Incorporated CCRs that support certain Navy Facilities Engineering Commands.
Aug-2021 A UFGS 01 78 00 Closeout Submittals C 1 Added Note to Submittal Article with instructions for Navy Design-Build projects. Deleted note and bracketed selections for Army only in response to CCR 8454.
Aug-2021 N UFGS 01 78 23 Operation and Maintenance Data C 2 Added "Marine Corps Installations" to General Note.
Aug-2021 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 3 In response to CCR 8939, added bracketed option for section UFGS 01 32 16.00 20 in Pre-Construction/Post-Award Kickoff Meeting paragraph. Added "Marine Corps Installations" to General Note and updated Notes for the Facility Data Workbook; modified Notes and paragraphs to have either brackets or tailoring, not both.
Aug-2021 N UFGS 03 53 14 Light Reflective Nonferrous Metallic Aggregate Floor System N New unified section; supersedes UFGS 03 53 14.00 20 LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE FLOOR SYSTEM.
Aug-2021 N UFGS 03 53 14.00 20 Light Reflective Nonferrous Metallic Aggregate Floor System D Superseded by new unified UFGS 03 53 14 LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE FLOOR SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2021 N UFGS 08 34 16.20 Vertical Lift Fabric Doors R General periodic update to incorporate new fabric door technologies, materials and design methodologies to increase door performance and industry competition.
Aug-2021 A UFGS 09 97 10.00 10 Metallic Coatings for Hydraulic Structures R Complete review and update.
Aug-2021 A UFGS 23 23 00 Refrigerant Piping R Complete review and update.
Aug-2021 N UFGS 23 54 19 Building Heating Systems, Warm Air R Complete revision; supersedes UFGS 23 82 01.00 10 WARM AIR HEATING SYSTEMS
Aug-2021 N UFGS 23 76 00 Evaporative Cooling Systems N New unified section; supersedes UFGS 23 76 00.00 10 EVAPORATIVE COOLING SYSTEMS and UFGS 23 76 00.00 20 EVAPORATIVE COOLING SYSTEM.
Aug-2021 A UFGS 23 76 00.00 10 Evaporative Cooling Systems D Superseded by new unified UFGS 23 76 00 EVAPORATIVE COOLING SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2021 N UFGS 23 76 00.00 20 Evaporative Cooling System D Superseded by new unified UFGS 23 76 00 EVAPORATIVE COOLING SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2021 A UFGS 23 82 01.00 10 Warm Air Heating Systems D Superseded by UFGS 23 54 19 BUILDING HEATING SYSTEMS, WARM AIR. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2021 N UFGS 26 08 00 Apparatus Inspection and Testing C 2 Incorporated optional paragraphs in PART 3 regarding UFGS Sections 26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER and 26 35 44 270 VDC SOLID STATE CONVERTER.
Aug-2021 N UFGS 26 24 13 Switchboards R Complete review. Revised to incorporate CCRs.
Aug-2021 A UFGS 26 28 01.00 10 Coordinated Power System Protection R Complete review and update.
Aug-2021 N UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter R Complete review and update.
Aug-2021 N UFGS 26 35 44 270 VDC Solid State Converter N New unified section; supersedes UFGS 26 35 44.00 20 270 VDC SOLID STATE GROUND POWER UNIT.
Aug-2021 N UFGS 26 35 44.00 20 270 VDC Solid State Ground Power Unit D Superseded by new unified UFGS 26 35 44 270 VDC SOLID STATE CONVERTER. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2021 A UFGS 26 36 23 Automatic Transfer Switches and By-Pass/Isolation Switch C 1 Incorporated CCRs and corrected formatting errors.
Aug-2021 N UFGS 26 56 00 Exterior Lighting R Complete review. Revised to incorporate CCRs.
Aug-2021 N UFGS 32 92 19 Seeding C 1 In response to CCR 10412, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2021 N UFGS 32 92 23 Sodding C 1 In response to CCR 10413, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2021 N UFGS 32 92 26 Sprigging C 1 In response to CCR 10414, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2021 N UFGS 32 93 00 Exterior Plants C 1 In response to CCR 10415, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2021 N UFGS 32 96 00 Transplanting Exterior Plants C 1 In response to CCR 10416, "Division 2" has been replaced with "Division 31" in TOPSOIL paragraph Note to conform with CSI MasterFormat.
Aug-2021 N UFGS 33 71 02 Underground Electrical Distribution R Complete review. Revised to incorporate CCRs.
May-2021 N UFGS 01 11 00 Summary of Work C 1 In response to CCR 8732, unnecessary brackets were removed from the last sentence in the 2nd paragraph under (1.8) LOCATION OF UNDERGROUND UTILITIES retaining the sentence as a standard requirement.
May-2021 N UFGS 01 14 00 Work Restrictions C 12 In response to CCR 9908, paragraph Shipyard Area Work Clearance Request (1.5.10) has been tailored for Navy.
May-2021 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 4 In response to CCR 9422, subparagraph (1.4.6.1.1) Removal of Waste from Camp Lejeune has been updated to reflect the landfill waste policy at Camp Lejeune.
May-2021 N UFGS 01 91 00.15 20 Total Building Commissioning C 1 Changes made to align with NAVFAC policy, and corrections of errors and omissions.
May-2021 A UFGS 02 51 13 Precipitation/Coagulation/Flocculation Water Treatment D Superseded by UFGS 46 07 13.13 PRECIPITATION/COAGULATION/FLOCCULATION (P/C/F) WATER TREATMENT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2021 N UFGS 03 30 00 Cast-In-Place Concrete C 2 In response to the following: CCR 7515, updated ACI 302.1R table references in paragraph (3.10.2) "Flat Floor Finishes"; CCR 7801, revised Specifier Note and list item a. in subparagraph (2.3.1.1) "Portland Cement"; CCR 8263, changed center table heading to "12 months" in subparagraph (2.5.2.4) "Sulfate Resistance" list item c.; CCR 8321, updated list item b. in subparagraph (2.3.1.3) "Fly Ash" and revised subparagraph (2.3.1.4) "Slag Cement"; CCR 8333, updated bar Grades in paragraph (2.6.1) "Reinforcing Bars" list item b. and (2.6.1.2) "Epoxy-Coated Reinforcing Bars" list item a.; CCR 8571, deleted paragraph "Perimeter Insulation" (2.2.6); CCRs 8085 and 8572 added the option “IL portland limestone cement” to subparagraph (2.3.1.2) "Blended Cements" in the Specifier Note and list item a.; CCRs 9127 and 9142, updated list item b. in paragraph (3.5.2) "Vapor Retarder [and Vapor Barrier]", replaced "air temperature" with "concrete temperature" in paragraph (3.6.2) "Mixing" list items b. and c., also added manufacturer's recommended dosage in item d., updated article (3.7) “Placing Concrete” and paragraph (3.10.1) “Finish”, and added new subparagraphs (3.14.1.1) “Fine Aggregate” and (3.14.1.2) “Course Aggregate” under (3.14.1) “Aggregate Testing”.
May-2021 N UFGS 03 45 00 Precast Architectural Concrete C 1 In response to CCR 9739, "High-Density Plastic" has been added as the title for paragraph 2.7.6
May-2021 A UFGS 04 01 20.75 Masonry Strengthening Using Surface Applied FRP Composites C 2 Updated subparts 3.4.3.2 and 3.4.3.3 in response to CCR 4378.
May-2021 N UFGS 05 12 00 Structural Steel C 2 In response to CCR 9371, the material strength in paragraph Structural Steel Tubing (2.2.2) was updated to "Grade [C]"
May-2021 A UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures R Complete review and update.
May-2021 A UFGS 06 17 19 Cross-Laminated Timber C 2 Deleted 2nd note paragraph in subpart 2.2.3 in response to CCR 8979.
May-2021 N UFGS 22 00 00 Plumbing, General Purpose C 4 Added "Army" projects to the Specifier Notes under (2.1.1) Pipe Joint Materials, list item t., (3.1.3.6) Copper Tube and Pipe, list item d, and (3.12) TABLE II; added Air Force tailoring to paragraph (2.4.6) No-Water Urinals; NOTES indicating tailoring options added throughout this section.
May-2021 N UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems C 1 Changes made to align with NAVFAC policy, and corrections of errors and omissions.
May-2021 A UFGS 23 09 00 Instrumentation and Control for HVAC C 3 This change aligns PVT requirements with Navy testing processes and eliminates an extraneous tailoring option. Deleted subpart 1.8.11 and corresponding submittal item in response to CCR 9532. Updated subpart 3.10 in response to CCR 9365.
May-2021 A UFGS 23 09 13 Instrumentation and Control Devices for HVAC C 2 Updated subpart 2.7.3.4.4 in response to CCR 7146.
May-2021 A UFGS 23 25 00 Chemical Treatment of Water for Mechanical Systems R Complete review and update.
May-2021 A UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems R Complete review and update.
May-2021 A UFGS 25 08 10 Utility Monitoring and Control System Testing R Complete review and update.

Pages