UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Aug-2023 A UFGS 07 27 10.00 10 Building Air Barrier System D Superseded by UFGS 07 27 10 BUILDING AIR BARRIER SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 07 27 19.01 Self-Adhering Air Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 27 26 Fluid-Applied Membrane Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 27 36 Spray Foam Air Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 54 19 Polyvinyl Chloride Roofing R Complete review and update.
Aug-2023 N UFGS 07 60 00 Flashing and Sheet Metal R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 72 20 Gravity-Type Roof Ventilators R Complete review and update.
Aug-2023 N UFGS 07 92 00 Joint Sealants R Complete review and update including the incorporation of CCRs.
Aug-2023 S UFGS 12 48 13 Entrance Floor Mats and Frames R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 N UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 01 30.41 HVAC System Cleaning C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 05 15 Common Piping for HVAC C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 A UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems C 1 Incorporated various CCRs.
Aug-2023 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 26 05 73 Power System Studies N Superseding UFGS 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION. New UFGS section.
Aug-2023 N UFGS 26 20 00 Interior Distribution System R Complete review and update to incorporate CCRs
Aug-2023 A UFGS 26 28 01.00 10 Coordinated Power System Protection D Superseded by UFGS 26 05 73 POWER SYSTEM STUDIES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 S UFGS 26 28 21.00 40 Automatic Transfer Switches R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 9563
Aug-2023 N UFGS 26 41 00 Lightning Protection System R Complete review and update based on CCRs and age of the document.
Aug-2023 S UFGS 26 52 00.00 40 Emergency Lighting R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 26 53 00.00 40 Exit Signs R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 5180, 7562
Aug-2023 S UFGS 26 55 53 Security Lighting R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 27 05 28.36 40 Cable Trays for Communications Systems R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 28 08 10 Electronic Security System Acceptance Testing R Complete review and update.
Aug-2023 N UFGS 28 31 02.00 20 Fire Alarm Reporting Systems - Digital Communicators D Superseded by 28 31 32 FIRE ALARM REPORTING SYSTEM, DIGITAL COMMUNICATOR TYPE Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 28 31 32 Fire Alarm Reporting System, Digital Communicator Type N Superseding UFGS 28 31 02.00 20 COORDINATED POWER SYSTEM PROTECTION and UFGS 28 31 75.00 10 CENTRAL FIRE ALARM SYSTEM, DIGITAL ALARM COMMUNICATOR TYPE. New UFGS section.
Aug-2023 A UFGS 28 31 33 Fire Alarm Reporting System, Radio Type N Superseding UFGS 28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE and UFGS 28 31 33.13 20 EXTERIOR FIRE REPORTING SYSTEM, RADIO TYPE. New UFGS section.
Aug-2023 A UFGS 28 31 33.00 10 Fire Alarm Reporting System, Radio Type D Superseded by UFGS 28 31 33 FIRE ALARM REPORTING SYSTEM, RADIO TYPE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 28 31 33.13 20 Exterior Fire Reporting System, Radio Type D Superseded by 28 31 33 FIRE ALARM REPORTING SYSTEM, RADIO TYPE Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 28 31 73.00 20 Exterior Fire Alarm System, Closed Circuit Telegraphic Type D Section has been Archived with no replacement. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 28 31 75.00 10 Central Fire Alarm System, Digital Alarm Communicator Type D Superseded by UFGS 28 31 32 FIRE ALARM REPORTING SYSTEM, DIGITAL COMMUNICATOR TYPE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 31 00 00 Earthwork R Superseding UFGS 31 23 00.00 20 EXCAVATION AND FILL. Complete review and update.
Aug-2023 N UFGS 31 23 00.00 20 Excavation and Fill D Superseded by 31 00 00 EARTHWORK Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 32 13 14.14 Concrete Paving for Small Airfield Projects N New UFGS Section.
Aug-2023 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 1 Incorporated various CCRs
Aug-2023 A UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type C 3 Incorporated various CCRs
May-2023 N UFGS 01 78 23 Operation and Maintenance Data R Revised throughout to unify Army and Navy requirements of Operation and Maintenance Manuals that were previously in this Section and in UFGS-01 78 24.00 10 and UFGS-01 78 24.00 20. Incorporated industry standards for the Operation and Maintenance Manual organization.
May-2023 A UFGS 01 78 24.00 10 Facility Data Requirements R Non-technical revision to update the Target Refresh Date.
May-2023 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) R Removed Operation and Maintenance Manual requirements throughout, this content has been incorporated into UFGS 01 78 23. Only Facility Data Workbook requirements remain in this section. Section Title changed from FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI) to FACILITY DATA WORKBOOK (FDW).
May-2023 A UFGS 01 91 00.15 10 Total Building Commissioning D Section Archived; 01 91 00.15 10 has been superseded by Unified Section UFGS-01 91 00.15 BUILDING COMMISSIONING Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 N UFGS 01 91 00.15 20 Total Building Commissioning D Superseded by unified UFGS-01 91 00.15 BUILDING COMMISSIONING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 N UFGS 01 91 00.15 Building Commissioning N Section number has been reinstated with the unification of Army and Navy Commissioning Sections. This new version supersedes UFGS-01 91 00.15 10 and UFGS-01 91 00.15 20 TOTAL BUILDING COMMISSIONING. Title has been changed to BUILDING COMMISSIONING.
May-2023 A UFGS 01 91 19 Building Enclosure Commissioning N New UFGS section superseding UFGS 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS.
May-2023 A UFGS 02 42 51 Carpet Removal and Reclamation C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness D Superseded by UFGS 01 91 19 BUILDING ENCLOSURE COMMISSIONING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 07 41 63 Fabricated Roof Panel Assemblies C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 N UFGS 08 11 69 Metal Storm Doors D Section has been archived with no replacement. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 08 33 23 Overhead Coiling Doors C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 08 34 73 Sound Control Door Assemblies C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 N UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 A UFGS 09 23 82 Fireproof Gypsum Plastering C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 67 23.13 Standard Resinous Flooring C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 96 00 High-Performance Coatings C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 N UFGS 10 44 16 Fire Extinguishers C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 N UFGS 23 08 00 Commissioning of Mechanical[ and Plumbing] Systems N Unified Section superseding UFGS-23 08 00.00 20 COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS.
May-2023 N UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems D Superseded by unified UFGS-23 08 00 COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers R Complete life cycle review. Updated technical requirements, references, formatting.
May-2023 S UFGS 26 56 13.00 40 Lighting Poles and Standards R Complete life cycle review. Updated technical requirements, references, formatting.
May-2023 A UFGS 31 41 16.16 Synthetic Sheet Piling N New UFGS section.
May-2023 A UFGS 31 63 29 Drilled Concrete Piers and Shafts C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 S UFGS 33 75 00.00 40 Switchgear and Protection Devices D Archived. No longer used. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams C 3 Incorporated CCR 13056
Feb-2023 N UFGS 01 14 00 Work Restrictions C 1 In response to CCR 12429, updated work requirements at Naval Base Kitsap.
Feb-2023 N UFGS 01 20 00 Price and Payment Procedures C 3 In response to CCR 12177, replaced "lump sum" with "Job" in second Note for Army projects, removed "lump sum" from DREDGING paragraph (1.11).
Feb-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 8 In response to CCR 12594, updated ECMS UTILIZATION paragraph (1.6) to clarify when contractors must utilize eCMS for transferring submittals.
Feb-2023 A UFGS 01 33 00 Submittal Procedures C Administrative Change: Preparing Activity changed from NASA to Army.
Feb-2023 N UFGS 07 27 36 Spray Foam Air Barriers C 3 In response to CCR 12503, updated SUBMITTALS article and Prohibited Materials paragraph (2.1.5) to disallow all HFC blowing agents.
Feb-2023 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 4 In response to CCR 12504, updated SUBMITTALS article and SPRAY URETHANE FOAM paragraph (2.2) to disallow all HFC blowing agents.
Feb-2023 N UFGS 12 00 01.00 20 Furniture, Fixtures and Equipment (FF&E) Package N New section developed for the design, procurement and installation of furniture, fixtures and equipment (FF&E) for new construction and building renovation projects.
Feb-2023 N UFGS 13 31 33 Frame Supported Membrane Structures for Protection of Aircraft N New section for frame supported membrane structures on airfields, which are commonly referred to as Aircraft Protective Equipment or Sunshades.
Feb-2023 S UFGS 22 07 19.00 40 Plumbing Piping Insulation R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCRs 5805 and 11444
Feb-2023 A UFGS 22 14 29.00 Sump Pumps R Complete review and update including Section number change from UFGS-22 14 29.00 40 to UFGS-22 14 29.00; Preparing Activity changed from NASA to Army.
Feb-2023 S UFGS 22 66 53.00 40 Laboratory Chemical-Waste and Vent Piping R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 23 22 23.00 40 Steam Condensate Pumps R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 23 41 13.00 40 Panel Filters R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 27 13 23.00 40 Communications Optical Backbone Cabling R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCRs 4556, 11315, 11317, 11956
Feb-2023 S UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 A UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications R Complete review and update.
Feb-2023 S UFGS 33 71 01.00 40 Overhead Transmission and Distribution R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 40 17 30.00 40 Welding General Piping R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR 11345
Feb-2023 N UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley C 1 Added an option for alternate wire rope in Division 2 hazardous areas. Updated formatting, references, foreign standard practices, and provided clarifications.
Feb-2023 N UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar C 3 Added an option for alternate wire rope in Division 2 hazardous areas. Updated formatting, foreign standard practices, and provided clarifications.
Nov-2022 N UFGS 01 14 00 Work Restrictions R Complete review to reset section date; address CCRs 12149 & 12150, added "U.S. persons" to General Construction and Finish Work note and paragraph.
Nov-2022 A UFGS 02 65 00 Underground Storage Tank Removal R Complete review and update
Nov-2022 N UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury R Complete review to correct passive voice and address CCRs.
Nov-2022 N UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) R Complete review to correct passive voice and address CCRs.
Nov-2022 A UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults R Complete review and update
Nov-2022 N UFGS 08 34 49.00 20 Hemp Shielded Door R Complete review to correct passive voice and address CCRs.
Nov-2022 N UFGS 08 71 63.10 Electrical Locking Control for Brigs R Complete review to correct passive voice and address CCRs.
Nov-2022 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 6 Updated paragraph "Valves" (3.1.5) removed sentence regarding omitting isolation valves
Nov-2022 A UFGS 26 05 19.00 10 Insulated Wire and Cable N This section number is being reinstated; superseding UFGS-26 05 19.10 10. Complete review and update.
Nov-2022 A UFGS 26 05 19.10 10 Insulated Wire and Cable D Superseded by UFGS 26 05 19.00 10 INSULATED WIRE AND CABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2022 N UFGS 26 08 00 Apparatus Inspection and Testing R Complete review to correct passive voice and address CCRs.
Nov-2022 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers R Updated section to address CCRs
Nov-2022 A UFGS 26 29 01.00 10 Electric Motors, 3-Phase Vertical Induction Type R Complete review and update
Nov-2022 A UFGS 26 29 02.00 10 Electric Motors, 3-Phase Vertical Synchronous Type R Complete review and update.
Nov-2022 A UFGS 31 71 19 Tunnel and Shaft Excavation in Rock - Mechanical N New UFGS section.
Nov-2022 A UFGS 32 01 16.71 Cold Milling Asphalt Paving R Complete review and update